Job JSLM0078 Route BB JEFFERSON County. Culvert replacements at Brackman Drive in Cedar Hill, the total length of improvement being 0.054 miles.

This is a Missouri Department of Transportation (MoDOT) federal highway construction project (Contract ID 260821-F03, Job JSLM0078) for culvert replacements at Brackman Drive in Cedar Hill, Jefferson County, Missouri, totaling 0.054 miles. The work includes removal of existing improvements, excavation, compacting, Class 3 excavation, temporary shoring, aggregate base, bituminous pavement, rock ditch liner, bedding material, traffic control, pavement markings, erosion control, concrete culverts, reinforcing steel, pipe groups, precast concrete drop inlets, flared end sections, seeding and mulching, ditch checks, and silt fence. This is a federal-funded project subject to Davis-Bacon prevailing wage requirements, DBE participation goals, and all applicable federal compliance provisions. Source scope cues include: bid bond, bidders must use the MoDOT provided bid bond forms. The project specific bond form is included in the request for bid. The project specific and annual bid bon.

BID WITH CAUTION 13 red flags detected : Federal Funding Compliance (Davis-Bacon / 2 CFR 200 / Federal Project)

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

This is a Missouri Department of Transportation (MoDOT) federal highway construction project (Contract ID 260821-F03, Job JSLM0078) for culvert replacements at Brackman Drive in Cedar Hill, Jefferson County, Missouri, totaling 0.054 miles. The work includes removal of existing improvements, excavation, compacting, Class 3 excavation, temporary shoring, aggregate base, bituminous pavement, rock ditch liner, bedding material, traffic control, pavement markings, erosion control, concrete culverts, reinforcing steel, pipe groups, precast concrete drop inlets, flared end sections, seeding and mulching, ditch checks, and silt fence. This is a federal-funded project subject to Davis-Bacon prevailing wage requirements, DBE participation goals, and all applicable federal compliance provisions. Source scope cues include: bid bond, bidders must use the MoDOT provided bid bond forms. The project specific bond form is included in the request for bid. The project specific and annual bid bon.

Submission deadline

2026-08-14

Red flag teaser

13 red flags detected including Federal Funding Compliance (Davis-Bacon / 2 CFR 200 / Federal Project).

Locked analysis

Full red flag list with excerpts

13 found

Federal Funding Compliance (Davis-Bacon / 2 CFR 200 / Federal Project)

critical

Federal Project Number(s): [This is a federal project]. By signing and submitting this bid, the bidder makes the certifications appearing in Sec. 102.18.1(regarding affirmative action and equal opportunity), Sec. 102.18.2 (regarding disbarment, eligibility, indictments, convictions, or civil judgments), Sec. 102.18.3 (regarding anti-collusion), and Sec. 102.18.4 (regarding lobbying activities).

Contractor Prequalification Required 7 Days Before Bid

high

Submit completed Contractor Prequalification Questionnaire with attachments not later than seven (7) days prior to the date and hour of the bid opening.

Electronic Bid Submission Only / Digital ID Required

high

All bids shall be submitted electronically using 'Bid Express Secure Internet Bidding' at www.bidx.com. Any paper bid submitted will be considered irregular per section 102.8 of the Missouri Standard Specifications for Highway Construction. Not obtaining a digital ID in advance of the letting (obtaining a digital ID may take 5 business days).

Liquidated Damages

high

…pliance With Contract Provisions....................... item (2) Period of Performance..................................... item (3) Liquidated Damages........................................ item (4) Itemized Bid.............................................. item (5) Trainees.................................................. item (6) DBE Certification*........................................ ite

Alternate Pavement Bid Option (Bid Only One Alternate)

medium

Alternate Pavements; to exercise this option, separate pay items, descriptions and quantities are included in the itemized proposal for each of the two alternates. The bidder shall bid only one of the two alternates and leave the contract unit price column blank for any pay item listed for the other alternate.

Locked analysis

All deadlines table

4 dates
ItemDue
Contractor Prequalification Questionnaire Submission 2026-08-14
Electronic Bid Submission Deadline 2026-08-21
Subcontractor Disclosure Form Submission (if not available at bid time) 2026-08-24
Annual Bid Bond Execution Deadline 2026-06-15

Locked analysis

Required certifications checklist

16 items
  • Complete bid/proposal form
  • Include bid bond
  • Include references or past project experience
  • Verify requirement: Prevailing Wage / Certified Payroll Documentation
  • Verify requirement: Anti-Discrimination Certification
  • Verify requirement: Contractor Prequalification
  • Verify requirement: DBE Identification Submittal
  • Verify requirement: Electronic Bid Submission Certification / Digital ID

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all