← Public RFP analyses

Job JNE0112 Audrain County - Road Job Special Provisions

This project involves the construction of a highway in Audrain County, Missouri, under the administration of the Missouri Highways and Transportation Commission. The work requires general contracting, traffic management, and compliance with federal funding regulations, specifically 2 CFR 200. It is a federally funded project, involving new construction and improvements to existing infrastructure. The project is commercial in nature, with a specified completion date of September 1, 2027, and a Notice to Proceed date of November 23, 2026. Source scope cues include: the following agencies may also be notified for accident or emergency situation within the project limits.; emergency agencies, a report shall be furnished to the engineer on the status of incident management.; data shall include the cycle count and date each measurement was taken.; 11 to provide data about its DBE program.; must submit data about all DBE and non-DBEs in accordance with Sec 102.; temporarily relocated, unless specifically included as a pay item in the contract..

BID WITH CAUTION 4 red flags detected : Federal Funding Compliance (2 CFR 200)

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

This project involves the construction of a highway in Audrain County, Missouri, under the administration of the Missouri Highways and Transportation Commission. The work requires general contracting, traffic management, and compliance with federal funding regulations, specifically 2 CFR 200. It is a federally funded project, involving new construction and improvements to existing infrastructure. The project is commercial in nature, with a specified completion date of September 1, 2027, and a Notice to Proceed date of November 23, 2026. Source scope cues include: the following agencies may also be notified for accident or emergency situation within the project limits.; emergency agencies, a report shall be furnished to the engineer on the status of incident management.; data shall include the cycle count and date each measurement was taken.; 11 to provide data about its DBE program.; must submit data about all DBE and non-DBEs in accordance with Sec 102.; temporarily relocated, unless specifically included as a pay item in the contract..

Submission deadline

2026-11-23

Red flag teaser

4 red flags detected including Federal Funding Compliance (2 CFR 200).

Locked analysis

Full red flag list with excerpts

4 found

Federal Funding Compliance (2 CFR 200)

high

Compliance with 2 CFR 200.216 – Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment.

Liquidated Damages for Delay

high

Liquidated Damages for Contract Administrative Costs. Should the contractor fail to complete the work on or before the contract completion date specified in Section 2.0, or within the number of calendar days specified in Section 2.1, whichever occurs first, the contractor will be charged contract administrative liquidated damages in accordance with Sec 108.8 in the amount of $500 per calendar day for each calendar day, or partial day thereof, that the work is not fully completed.

Retainage Withheld

high

as well as a return of retainage (and/or other amounts withheld), within 15 calendar days.

MBE/WBE/DBE Participation Requirement

medium

…01B 14 I. Pavement Marking Log 16 J. Additional Flaggers 16 K. Seal Coat Completion of Work JSP-15-08 17 L. Bridge Deck Drains 17 M. DBE Prompt Payment Reporting JSP-24-05B 17 N. Airport Requirements JSP-15-09 19 O. Cooperation Between Contractors 19 MISSOURI HIGHWAYS AND TRANSPORTATION COMMISSION 105 W. CAPITOL AVE. JEFFERSON CITY, MO 65102 Phone 1-888-275-6636 If a seal is present on this sheet

Locked analysis

All deadlines table

2 dates
ItemDue
Notice to Proceed 2026-11-23
Contract Completion 2027-09-01

Locked analysis

Required certifications checklist

3 items
  • Acknowledge all addenda
  • Verify requirement: Prevailing Wage / Certified Payroll Documentation
  • Verify requirement: Disadvantaged Business Enterprise Certification

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all