Federal Funding Compliance (2 CFR 200 / Davis-Bacon / ARPA)
criticalTHIS JOB SHALL BE CONSTRUCTED UNDER FEDERAL PROJECT NUMBER(S): IS 44-3(213)
This is a federal highway construction project on Interstate 44 in Franklin County, Missouri, managed by the Missouri Department of Transportation (MoDOT). The work includes coldmilling, resurfacing, and ramp extensions on I-44 from the Crawford County line to 0.5 miles east of Route 30 (15.347 miles total), plus improvements to two rest areas and two weigh stations. The project involves asphalt paving, concrete work, guardrail installation, pavement markings, drainage, lighting, and site improvements. This is a federal project (IS 44-3(213)) subject to Davis-Bacon prevailing wage, DBE participation goals, and other federal compliance requirements. Source scope cues include: bid bond, bidders must use the MoDOT provided bid bond forms. The project specific bond form is included in the request for bid. The project specific and annual bid bon; 000 SQFT ST.
Free RFP preview
Bid/no-bid recommendation
BID WITH CAUTION
This is a federal highway construction project on Interstate 44 in Franklin County, Missouri, managed by the Missouri Department of Transportation (MoDOT). The work includes coldmilling, resurfacing, and ramp extensions on I-44 from the Crawford County line to 0.5 miles east of Route 30 (15.347 miles total), plus improvements to two rest areas and two weigh stations. The project involves asphalt paving, concrete work, guardrail installation, pavement markings, drainage, lighting, and site improvements. This is a federal project (IS 44-3(213)) subject to Davis-Bacon prevailing wage, DBE participation goals, and other federal compliance requirements. Source scope cues include: bid bond, bidders must use the MoDOT provided bid bond forms. The project specific bond form is included in the request for bid. The project specific and annual bid bon; 000 SQFT ST.
2026-08-21
12 red flags detected including Federal Funding Compliance (2 CFR 200 / Davis-Bacon / ARPA).
Locked analysis
THIS JOB SHALL BE CONSTRUCTED UNDER FEDERAL PROJECT NUMBER(S): IS 44-3(213)
Submit completed Contractor Prequalification Questionnaire with attachments not later than seven (7) days prior to the date and hour of the bid opening. See Secs 101-103 of the Missouri Standard Specifications for Highway Construction, and Rule 7 CSR 10-15.010, 'Prequalification to Bid of Certain Contractors'.
All bids shall be submitted electronically using 'Bid Express Secure Internet Bidding' at www.bidx.com. Any paper bid submitted will be considered irregular per section 102.8 of the Missouri Standard Specifications for Highway Construction.
…pliance With Contract Provisions....................... item (2) Period of Performance..................................... item (3) Liquidated Damages........................................ item (4) Itemized Bid.............................................. item (5) Trainees.................................................. item (6) DBE Certification*........................................ ite
THIS JOB SHALL BE CONSTRUCTED UNDER FEDERAL PROJECT NUMBER(S): IS 44-3(213)
Locked analysis
| Item | Due |
|---|---|
| Bid Submission Deadline | 2026-08-21 |
| Contractor Prequalification Questionnaire Due | 2026-08-14 |
| Subcontractor Disclosure Form Due (if not submitted with bid) | 2026-08-24 |
| Annual Bid Bond Execution Deadline | 2026-06-15 |
Locked analysis
Locked workspace
Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.
Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.
Or start your free trial →Related public analyses
MoDOT
MoDOT
MoDOT
MoDOT