← Public RFP analyses

Job JSL0038 Route I-44 FRANKLIN County. Coldmill, resurface, ramp extensions, rest area and weigh scale site improvements on I-44 from the Crawford County line to 0.5 miles east of Route 30, the total length of improvement being 15.347 miles.

This is a federal highway construction project on Interstate 44 in Franklin County, Missouri, managed by the Missouri Department of Transportation (MoDOT). The work includes coldmilling, resurfacing, and ramp extensions on I-44 from the Crawford County line to 0.5 miles east of Route 30 (15.347 miles total), plus improvements to two rest areas and two weigh stations. The project involves asphalt paving, concrete work, guardrail installation, pavement markings, drainage, lighting, and site improvements. This is a federal project (IS 44-3(213)) subject to Davis-Bacon prevailing wage, DBE participation goals, and other federal compliance requirements. Source scope cues include: bid bond, bidders must use the MoDOT provided bid bond forms. The project specific bond form is included in the request for bid. The project specific and annual bid bon; 000 SQFT ST.

BID WITH CAUTION 12 red flags detected : Federal Funding Compliance (2 CFR 200 / Davis-Bacon / ARPA)

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

This is a federal highway construction project on Interstate 44 in Franklin County, Missouri, managed by the Missouri Department of Transportation (MoDOT). The work includes coldmilling, resurfacing, and ramp extensions on I-44 from the Crawford County line to 0.5 miles east of Route 30 (15.347 miles total), plus improvements to two rest areas and two weigh stations. The project involves asphalt paving, concrete work, guardrail installation, pavement markings, drainage, lighting, and site improvements. This is a federal project (IS 44-3(213)) subject to Davis-Bacon prevailing wage, DBE participation goals, and other federal compliance requirements. Source scope cues include: bid bond, bidders must use the MoDOT provided bid bond forms. The project specific bond form is included in the request for bid. The project specific and annual bid bon; 000 SQFT ST.

Submission deadline

2026-08-21

Red flag teaser

12 red flags detected including Federal Funding Compliance (2 CFR 200 / Davis-Bacon / ARPA).

Locked analysis

Full red flag list with excerpts

12 found

Federal Funding Compliance (2 CFR 200 / Davis-Bacon / ARPA)

critical

THIS JOB SHALL BE CONSTRUCTED UNDER FEDERAL PROJECT NUMBER(S): IS 44-3(213)

Contractor Prequalification Required

high

Submit completed Contractor Prequalification Questionnaire with attachments not later than seven (7) days prior to the date and hour of the bid opening. See Secs 101-103 of the Missouri Standard Specifications for Highway Construction, and Rule 7 CSR 10-15.010, 'Prequalification to Bid of Certain Contractors'.

Electronic Bid Submission Only / No Paper Bids

high

All bids shall be submitted electronically using 'Bid Express Secure Internet Bidding' at www.bidx.com. Any paper bid submitted will be considered irregular per section 102.8 of the Missouri Standard Specifications for Highway Construction.

Liquidated Damages

high

…pliance With Contract Provisions....................... item (2) Period of Performance..................................... item (3) Liquidated Damages........................................ item (4) Itemized Bid.............................................. item (5) Trainees.................................................. item (6) DBE Certification*........................................ ite

Prevailing Wage / Davis-Bacon

high

THIS JOB SHALL BE CONSTRUCTED UNDER FEDERAL PROJECT NUMBER(S): IS 44-3(213)

Locked analysis

All deadlines table

4 dates
ItemDue
Bid Submission Deadline 2026-08-21
Contractor Prequalification Questionnaire Due 2026-08-14
Subcontractor Disclosure Form Due (if not submitted with bid) 2026-08-24
Annual Bid Bond Execution Deadline 2026-06-15

Locked analysis

Required certifications checklist

17 items
  • Complete bid/proposal form
  • Include bid bond
  • Include references or past project experience
  • Verify requirement: Performance and Payment Bond
  • Verify requirement: Prevailing Wage / Certified Payroll Documentation
  • Verify requirement: Authorized Workforce Certification
  • Verify requirement: Contractor License
  • Verify requirement: MWBE / DBE / SDVOB Participation Certification

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all