Job JNWM0130 Route I-35 HARRISON County. Pavement repair at Eagle Rest Area, the total length of improvement being 0.645 miles.

This is a Missouri Department of Transportation (MoDOT) highway construction project for pavement repair at Eagle Rest Area on Route I-35 in Harrison County. The work includes partial-depth concrete pavement repair using hot-applied polymer-modified repair material, joint mastic repair, surface aggregate application, temporary traffic control, and pavement markings over approximately 0.645 miles. This is a federal-funded project subject to Davis-Bacon prevailing wage, DBE participation goals, and federal compliance certifications. Source scope cues include: bid bond, bidders must use the MoDOT provided bid bond forms. The project specific bond form is included in the request for bid. The project specific and annual bid bon.

BID WITH CAUTION 10 red flags detected : Authorized Workforce Certification & Immigration Compliance

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

This is a Missouri Department of Transportation (MoDOT) highway construction project for pavement repair at Eagle Rest Area on Route I-35 in Harrison County. The work includes partial-depth concrete pavement repair using hot-applied polymer-modified repair material, joint mastic repair, surface aggregate application, temporary traffic control, and pavement markings over approximately 0.645 miles. This is a federal-funded project subject to Davis-Bacon prevailing wage, DBE participation goals, and federal compliance certifications. Source scope cues include: bid bond, bidders must use the MoDOT provided bid bond forms. The project specific bond form is included in the request for bid. The project specific and annual bid bon.

Submission deadline

2026-08-14

Red flag teaser

10 red flags detected including Authorized Workforce Certification & Immigration Compliance.

Locked analysis

Full red flag list with excerpts

10 found

Authorized Workforce Certification & Immigration Compliance

high

THE BIDDER CERTIFIES THAT THE BIDDER'S COMPANY KNOWINGLY EMPLOYS ONLY INDIVIDUALS WHO ARE AUTHORIZED TO WORK IN THE UNITED STATES IN ACCORDANCE WITH APPLICABLE FEDERAL AND STATE LAWS AND ALL PROVISIONS OF MISSOURI EXECUTIVE ORDER NO. 07-13 FOR CONTRACTS WITH THE MISSOURI HIGHWAYS AND TRANSPORTATION COMMISSION, ACTING THROUGH THE MISSOURI DEPARTMENT OF TRANSPORTATION.

Electronic Bid Submission Only / Digital ID Required

high

All bids shall be submitted electronically using 'Bid Express Secure Internet Bidding' at www.bidx.com. Any paper bid submitted will be considered irregular per section 102.8 of the Missouri Standard Specifications for Highway Construction. Not obtaining a digital ID in advance of the letting (obtaining a digital ID may take 5 business days)

Federal Project Compliance & Certifications

high

By signing and submitting this bid, the bidder makes the certifications appearing in Sec. 102.18.1(regarding affirmative action and equal opportunity), Sec. 102.18.2 (regarding disbarment, eligibility, indictments, convictions, or civil judgments), Sec. 102.18.3 (regarding anti-collusion), and Sec. 102.18.4 (regarding lobbying activities). As provided in Sec. 108.13, the Commission may terminate the contract for acts of misconduct, which includes but is not limited to fraud, dishonesty and material misrepresentation or omission of fact within the bid submission.

Liquidated Damages

high

…pliance With Contract Provisions....................... item (2) Period of Performance..................................... item (3) Liquidated Damages........................................ item (4) Itemized Bid.............................................. item (5) Trainees.................................................. item (6) DBE Certification*........................................ ite

Prequalification Required 7 Days Before Bid Opening

high

Submit completed Contractor Prequalification Questionnaire with attachments not later than seven (7) days prior to the date and hour of the bid opening. See Secs 101-103 of the Missouri Standard Specifications for Highway Construction, and Rule 7 CSR 10-15.010, 'Prequalification to Bid of Certain Contractors'.

Locked analysis

All deadlines table

4 dates
ItemDue
Contractor Prequalification Questionnaire Submission 2026-08-14
Electronic Bid Submission Deadline 2026-08-21
Subcontractor Disclosure Form Submission (if not submitted with bid) 2026-08-24
Annual Bid Bond Execution Deadline 2026-06-15

Locked analysis

Required certifications checklist

16 items
  • Complete bid/proposal form
  • Include bid bond
  • Include references or past project experience
  • Verify requirement: Authorized Workforce Certification
  • Verify requirement: Contractor Prequalification
  • Verify requirement: DBE Identification Submittal
  • Verify requirement: Electronic Bid Submission Certification / Digital ID
  • Verify requirement: Federal Certifications (Affirmative Action, Disbarment, Anti-Collusion, Lobbying)

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all