← Public RFP analyses

Job JKU0066 Route 40 JACKSON County. Grading, pavement, coldmill, resurface, signal, wall and ADA improvements from Cliff Avenue to Little Blue Parkway near Independence, the total length of improvement being 0.896 miles.

This is a federal highway construction project in Jackson County, Missouri (Route 40 near Independence) managed by the Missouri Department of Transportation (MoDOT). The work includes grading, pavement, cold-mill, resurface, signal, wall, and ADA improvements over 0.896 miles, with scope spanning roadway items, guardrail/guard cable, lighting, signals, signing, ITS (Intelligent Transportation Systems), and bridge work on four structures. The project is funded under Federal Project Number FAF 40-1(15) and is subject to Davis-Bacon prevailing wage requirements, DBE participation goals, and all federal compliance obligations under 2 CFR 200. Source scope cues include: bid bond, bidders must use the MoDOT provided bid bond forms. The project specific bond form is included in the request for bid. The project specific and annual bid bon; 000 SQFT ST.

BID WITH CAUTION 11 red flags detected : Federal Funding Compliance (2 CFR 200 / Davis-Bacon / FAF Program)

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

This is a federal highway construction project in Jackson County, Missouri (Route 40 near Independence) managed by the Missouri Department of Transportation (MoDOT). The work includes grading, pavement, cold-mill, resurface, signal, wall, and ADA improvements over 0.896 miles, with scope spanning roadway items, guardrail/guard cable, lighting, signals, signing, ITS (Intelligent Transportation Systems), and bridge work on four structures. The project is funded under Federal Project Number FAF 40-1(15) and is subject to Davis-Bacon prevailing wage requirements, DBE participation goals, and all federal compliance obligations under 2 CFR 200. Source scope cues include: bid bond, bidders must use the MoDOT provided bid bond forms. The project specific bond form is included in the request for bid. The project specific and annual bid bon; 000 SQFT ST.

Submission deadline

2026-08-14

Red flag teaser

11 red flags detected including Federal Funding Compliance (2 CFR 200 / Davis-Bacon / FAF Program).

Locked analysis

Full red flag list with excerpts

11 found

Federal Funding Compliance (2 CFR 200 / Davis-Bacon / FAF Program)

critical

THIS JOB SHALL BE CONSTRUCTED UNDER FEDERAL PROJECT NUMBER(S): FAF 40-1(15). By signing and submitting this bid, the bidder makes the certifications appearing in Sec. 102.18.1(regarding affirmative action and equal opportunity), Sec. 102.18.2 (regarding disbarment, eligibility, indictments, convictions, or civil judgments), Sec. 102.18.3 (regarding anti-collusion), and Sec. 102.18.4 (regarding lobbying activities).

Electronic Bid Submission Only / Paper Bids Non-Responsive

high

All bids shall be submitted electronically using 'Bid Express Secure Internet Bidding' at www.bidx.com. Any paper bid submitted will be considered irregular per section 102.8 of the Missouri Standard Specifications for Highway Construction. Not obtaining a digital ID in advance of the letting (obtaining a digital ID may take 5 business days)

Liquidated Damages

high

…pliance With Contract Provisions....................... item (2) Period of Performance..................................... item (3) Liquidated Damages........................................ item (4) Itemized Bid.............................................. item (5) Trainees.................................................. item (6) DBE Certification*........................................ ite

Alternate Pavement Bidding Requirement

medium

Alternate Pavements; to exercise this option, separate pay items, descriptions and quantities are included in the itemized proposal for each of the two alternates. The bidder shall bid only one of the two alternates and leave the contract unit price column blank for any pay item listed for the other alternate.

Bid Bond Required

medium

The bidder shall submit a Bid Guaranty meeting the requirements of Section 102 of the Missouri Standard Specifications for Highway Construction. MoDOT's bid bond forms are available on MoDOT's website. Annual bid bonds shall be submitted to MoDOT by June 15th of each year.

Locked analysis

All deadlines table

4 dates
ItemDue
Contractor Prequalification Questionnaire Due 2026-08-14
Electronic Bid Submission Due 2026-08-21
Subcontractor Disclosure Form Due (if not submitted with bid) 2026-08-24
Annual Bid Bond Execution Deadline 2026-06-15

Locked analysis

Required certifications checklist

14 items
  • Complete bid/proposal form
  • Include bid bond
  • Include references or past project experience
  • Verify requirement: Contractor Prequalification
  • Verify requirement: DBE Identification Submittal
  • Verify requirement: Digital ID for Electronic Bid Submission
  • Verify requirement: Federal Certifications (Affirmative Action, Disbarment, Anti-Collusion, Lobbying)
  • Verify requirement: Subcontractor Disclosure Form

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all