Y1DA--573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMC

This is a Department of Veterans Affairs (VA) infrastructure upgrade and data center construction project at the Gainesville VAMC (Veterans Affairs Medical Center) in Gainesville, Florida. The project involves EHRM (Electronic Health Records Management) infrastructure upgrades and new data center construction. As a federal VA project, it is subject to federal procurement regulations, prevailing wage requirements, and Buy American provisions. The specific trades, square footage, and detailed scope are not provided in the available RFP excerpt. Source scope cues include: Y1DA--573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMC.

LIKELY BID 1 red flag detected : Federal Funding Compliance (2 CFR 200 / ARPA / etc.)

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

LIKELY BID

Scope summary

This is a Department of Veterans Affairs (VA) infrastructure upgrade and data center construction project at the Gainesville VAMC (Veterans Affairs Medical Center) in Gainesville, Florida. The project involves EHRM (Electronic Health Records Management) infrastructure upgrades and new data center construction. As a federal VA project, it is subject to federal procurement regulations, prevailing wage requirements, and Buy American provisions. The specific trades, square footage, and detailed scope are not provided in the available RFP excerpt. Source scope cues include: Y1DA--573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMC.

Submission deadline

Not listed in the public preview.

Red flag teaser

1 red flag detected including Federal Funding Compliance (2 CFR 200 / ARPA / etc.).

Locked analysis

Full red flag list with excerpts

1 found

Federal Funding Compliance (2 CFR 200 / ARPA / etc.)

high

VETERANS AFFAIRS, DEPARTMENT OF. Y1DA--573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMC

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

7 items
  • Verify requirement: Performance and Payment Bond
  • Verify requirement: Commercial General Liability Insurance
  • Verify requirement: Workers' Compensation Insurance
  • Verify requirement: Prevailing Wage / Certified Payroll Documentation
  • Verify requirement: Contractor License
  • Verify requirement: Non-Collusion / Anti-Kickback / Debarment Affidavit
  • Resolve before bid: Federal Funding Compliance (2 CFR 200 / ARPA / etc.)

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all
NAICS 236220 AL

Solicitation for B1502 Renovation

DEPT OF DEFENSE.DEPT OF THE ARMY.NATIONAL GUARD BUREAU.JFHQ USPFO AL.USPFO AL PROCUREMENT.W7MT USPFO ACTIVITY ALANG 187