Winn Park Building Cold Shell Remodel

Source scope cues include: CITY OF SACRAMENTO WINN PARK; City of Sacramento; 25 years beginning at date of acceptance by University. 1. Bleach resistance warranty: 15 years. 2. Stain resistance warranty: 15 years. TILE CARPETING 09 68 13 – 2 WINN PARK TE...; 07 01 50 - ROOFING PATCH & REPAIR .; 23 01 00 - Operation and Maintenance of HVAC Systems .; 23 05 00 - Common Work Results For HVAC .; 23 05 13 - Common Motor Requirements For HVAC .; 23 05 30 - Hangers and Support For HVAC Ductwork .; 23 05 53 - Identification For HVAC Piping and Equipment .; 23 07 19 - HVAC Piping Insulation .; 23 09 23 - Direct Digital Control Systems For HVAC .; changes, or unavailability of required warranty terms.; Certificates and qualification data, where applicable or requested.; proposed substitution within time allocated.; Requested substitution provides specified warranty.; schedule or specified warranty requirements.; furnish survey data to substantiate quantities.; Mechanical Contractor; mechanical contractors.

BID WITH CAUTION 13 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: CITY OF SACRAMENTO WINN PARK; City of Sacramento; 25 years beginning at date of acceptance by University. 1. Bleach resistance warranty: 15 years. 2. Stain resistance warranty: 15 years. TILE CARPETING 09 68 13 – 2 WINN PARK TE...; 07 01 50 - ROOFING PATCH & REPAIR .; 23 01 00 - Operation and Maintenance of HVAC Systems .; 23 05 00 - Common Work Results For HVAC .; 23 05 13 - Common Motor Requirements For HVAC .; 23 05 30 - Hangers and Support For HVAC Ductwork .; 23 05 53 - Identification For HVAC Piping and Equipment .; 23 07 19 - HVAC Piping Insulation .; 23 09 23 - Direct Digital Control Systems For HVAC .; changes, or unavailability of required warranty terms.; Certificates and qualification data, where applicable or requested.; proposed substitution within time allocated.; Requested substitution provides specified warranty.; schedule or specified warranty requirements.; furnish survey data to substantiate quantities.; Mechanical Contractor; mechanical contractors.

Submission deadline

Not listed in the public preview.

Red flag teaser

13 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

13 found

Broad Indemnification

high

WINN PARK TENANT IMPROVEMENT AN-23016 100% CONSTRUCTION DOCUMENTS 11.30.2023 3. He will prove harmless and indemnify the Owner and the Owner's design consultants from real or alleged damages that may result from the installation, use, or performance of a substitute material or product. E. The following conditions apply to substitutions: 1. Submittals of substitutions are not and do not become part

Federal Funding Compliance (ARPA / CDBG / HUD / FEMA / 2 CFR 200)

high

…www.faa.gov. 8. FG - Federal Government Publications; www.gpo.gov/fdsys. 9. GSA - General Services Administration; www.gsa.gov. 10. HUD - Department of Housing and Urban Development; www.hud.gov. 11. LBL - Lawrence Berkeley National Laboratory; Environmental Energy Technologies Division; www.eetd.lbl.gov. 12. OSHA - Occupational Safety & Health Administration; www.osha.gov. 13. SD - Department of

Hazardous Material / Abatement Coordination

high

…by roofing operations. Submit before Work begins. D. Landfill Records: Indicate receipt and acceptance of hazardous wastes, such as asbestos- containing material, by a landfill facility licensed to accept hazardous wastes. 1.6 QUALITY ASSURANCE A. Installer Qualifications: Installer of new membrane roofing system approved by manufacturer to work on existing roofing. B. Regulatory Requirements: Co

Lien Waiver / Waiver of Lien Rights

high

…Submit one signed original copy of each Application for Payment to Project Manager by an electronic method ensuring receipt. Include waivers of lien and similar attachments as required. 1. Transmit each copy with a transmittal form listing attachments and recording appropriate information about application. G. Waivers of Liens: With each Application for Payment, submit waivers of lien from subcon

Liquidated Damages

high

…n settled. 5. Final meter readings for utilities, a measured record of stored fuel, and similar data as of date of Substantial Completion or when Owner took possession of and assumed responsibility for corresponding elements of the Work. 6. Final liquidated damages settlement statement. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) END OF SECTION 012900 PAYMENT PROCEDURES - 012900 -

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

9 items
  • Attach certificate of insurance
  • Acknowledge all addenda
  • Include references or past project experience
  • Include subcontractor list if required
  • Include safety documents if required
  • Verify requirement: Commercial General Liability Insurance
  • Verify requirement: Key Personnel Qualifications and Certifications
  • Resolve before bid: Hazardous Material / Abatement Coordination

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all