← Public RFP analyses

Water Spreading Services of Palos Verdes Reservoir

Source scope cues include: submitted online within the PlanetBids system by the date and time specified.; assumes that all invoices are paid within the discount terms (all discounts are taken).; Statistics, Consumer Price Index- CPI-U, or other applicable data).; the scope of services and timetable for completion of services.; with all required permits and licenses.; withholding of Contractor’s invoice payment.; The scope of work will require Contractor to enter into a twenty-six (26) week contract.; and emergency phone numbers and notification procedures in case of a spill.; Contractor shall provide proof of all required insurances as specified herein.; followed for mechanical and other issues..

BID WITH CAUTION 5 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: submitted online within the PlanetBids system by the date and time specified.; assumes that all invoices are paid within the discount terms (all discounts are taken).; Statistics, Consumer Price Index- CPI-U, or other applicable data).; the scope of services and timetable for completion of services.; with all required permits and licenses.; withholding of Contractor’s invoice payment.; The scope of work will require Contractor to enter into a twenty-six (26) week contract.; and emergency phone numbers and notification procedures in case of a spill.; Contractor shall provide proof of all required insurances as specified herein.; followed for mechanical and other issues..

Submission deadline

2019-08-07

Red flag teaser

5 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

5 found

Broad Indemnification

high

…age shall not extend to any indemnity coverage for the active negligence of the additional insured in any case where an agreement to indemnify the additional insured would be invalid under Subdivision (b) of Section 2782 of the Civil Code. g. Other Endorsements and Insurance Provisions 1. All rights of subrogation under the property insurance policy (if any) have been waived against Metropolitan.

Hazardous Material / Abatement Coordination

high

…resulting from work for Metropolitan or use of Metropolitan’s premises or facilities. 3. If General Liability, Pollution and/or any Asbestos Pollution Liability coverages are written on a claims-made form: a. The “Retro Date” must be shown, and must be before the date of the contract or the beginning of contract work. b. Insurance must be maintained and evidence of insurance must be provided for…

High Insurance Limits Required

medium

…tor shall maintain limits no less than: 1. General Liability: Including operations, products and completed operations as applicable, $1,000,000 per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the project or location, or

MBE/WBE/DBE Participation Requirement

medium

Water Spreading Services at the Palos Verdes Reservoir RFB-KH-367443 7. SBE/DVBE certification (if applicable) 8. Description of minimum standards for driver eligibility 9. Copy of formal driver training program 10. Copy of incident response plan 11. Description of periodic vehicle inspection program and documentation Submit supporting bid documents online through the PlanetBids system as specifie

Owner Right to Reject All Bids

low

…ropolitan reserves the following options: 1. The right to award in whole or in part. 2. The right to reject all partial bids. 3. The right to reject any or all bids or make no award. 4. The right to issue subsequent request for bids. 5. The right to approve or disapprove the use of particular subcontractors and /or suppliers. 6. The right to waive any informality or irregularity in the bidding pr

Locked analysis

All deadlines table

2 dates
ItemDue
RFB QUESTIONS DUE ........................................ 2019-08-07
BID SUBMITTAL DUE ...................................... 2019-08-13

Locked analysis

Required certifications checklist

14 items
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Acknowledge all addenda
  • Include references or past project experience
  • Include subcontractor list if required
  • Include safety documents if required
  • Submit through the e-procurement / online bid system

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all