UTILITY PIPING AND PILE REPLACEMENT AT IMPERIAL BEACH PIER

This is a public works project for the San Diego Unified Port District to replace utility piping and piles at Imperial Beach Pier in Imperial Beach, California. The work includes demolition and removal, pile installation in an open ocean environment under a restricted-access pier deck, sewer pipe and assembly installation, electrical work (low-voltage, grounding, switchboards, panelboards, lighting controls), architectural repair, carpentry, and miscellaneous metal fabrications. The project is a renovation/repair of existing marine infrastructure and requires compliance with California prevailing wage, SBE sub-participation goals, and multiple certifications and bonding requirements. Source scope cues include: Bid Bond (Form supplied by Contractor’s Surety)*** ASTERISK NOTES: * Form must be subscribed and sworn to before Notary Public or other Officer. ** These forms shall be.

BID WITH CAUTION 10 red flags detected : Debarment by Labor Commissioner Disqualifies All Future District Contracts

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

This is a public works project for the San Diego Unified Port District to replace utility piping and piles at Imperial Beach Pier in Imperial Beach, California. The work includes demolition and removal, pile installation in an open ocean environment under a restricted-access pier deck, sewer pipe and assembly installation, electrical work (low-voltage, grounding, switchboards, panelboards, lighting controls), architectural repair, carpentry, and miscellaneous metal fabrications. The project is a renovation/repair of existing marine infrastructure and requires compliance with California prevailing wage, SBE sub-participation goals, and multiple certifications and bonding requirements. Source scope cues include: Bid Bond (Form supplied by Contractor’s Surety)*** ASTERISK NOTES: * Form must be subscribed and sworn to before Notary Public or other Officer. ** These forms shall be.

Submission deadline

2023-09-13

Red flag teaser

10 red flags detected including Debarment by Labor Commissioner Disqualifies All Future District Contracts.

Locked analysis

Full red flag list with excerpts

10 found

Debarment by Labor Commissioner Disqualifies All Future District Contracts

critical

Have you ever been debarred from bidding or being awarded construction work by the Labor Commissioner? ... IF YOUR ANSWER TO QUESTION 5 IS YES, THE DISTRICT SHALL NOT PERMIT YOU TO BID, WORK OR BE AWARDED THIS OR ANY OTHER DISTRICT CONTRACT. FAILURE TO RESPOND TO THESE QUESTIONS MAY BE CONSIDERED A NON-RESPONSIVE BID SUBJECT TO REJECTION.

SBE Sub-Participation Requirement / Good Faith Effort Mandate

high

Respondent acknowledges by signing this form that it is required to complete the SBE Sub-Participation Form acknowledging their good faith effort towards SBE Sub-Participation and/or meet the goal as the prime contractor as a certified SBE (if goal is established). In the event of a discrepancy between form and totals entered on the eBid system, the District reserves the right to evaluate and waive any informalities.

Strict Contractor License Requirement at Time of Bid Submission

high

CALIFORNIA BUSINESS AND PROFESSIONS CODE SECTION 7028.15 PROVIDES THAT EXCEPT AS SPECIFIED THEREIN, THE BID OF A CONTRACTOR WHO IS NOT PROPERLY LICENSED AT THE TIME THE CONTRACTOR SUBMITTED THE BID SHALL BE CONSIDERED NONRESPONSIVE AND SHALL BE REJECTED. SAID CODE SECTION ALSO MAKES IT A MISDEMEANOR TO SUBMIT A BID ON THIS CONTRACT WITHOUT HAVING A PROPER LICENSE.

Bid Bond Required

medium

13. Bid Bond (Form supplied by Contractor's Surety)*** ... *** The signature of the Surety must be acknowledged by a Notary.

Bid Price Firm for 120 Days

medium

THE PRICE SHOWN ABOVE SHALL REMAIN VALID FOR A PERIOD OF UP TO 120 DAYS FROM THE BID DATE.

Locked analysis

All deadlines table

2 dates
ItemDue
Bid Submission Deadline 2023-09-13
Bid Price Validity Period TBD

Locked analysis

Required certifications checklist

17 items
  • Include bid bond
  • Verify workers compensation coverage
  • Acknowledge all addenda
  • Include references or past project experience
  • Verify requirement: Americans with Disabilities Act (ADA) Compliance Certificate
  • Verify requirement: Bidder's Statement of Experience
  • Verify requirement: Contractor License
  • Verify requirement: False Claims Certification

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all