← Public RFP analyses

Upper Land Park Cape Seal Project

This is a striping, signing, and electrical improvement project for the Upper Land Park Cape Seal Project (PN: R15200020) in Sacramento, California. The project involves installation of traffic control devices, pavement markings, pedestrian signals, video detection systems, lighting, and associated electrical infrastructure in a public park area. The work includes new road construction, traffic signal installation, loop detectors, CCTV cameras, luminaires, and pull boxes. This is a municipal public works project managed by the City of Sacramento Department of Public Works. Source scope cues include: CITY OF SACRAMENTO IMPROVEMENT PLANS.

BID WITH CAUTION 5 red flags detected : Complex Electrical and Traffic Control Scope - Design Compliance Risk

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

This is a striping, signing, and electrical improvement project for the Upper Land Park Cape Seal Project (PN: R15200020) in Sacramento, California. The project involves installation of traffic control devices, pavement markings, pedestrian signals, video detection systems, lighting, and associated electrical infrastructure in a public park area. The work includes new road construction, traffic signal installation, loop detectors, CCTV cameras, luminaires, and pull boxes. This is a municipal public works project managed by the City of Sacramento Department of Public Works. Source scope cues include: CITY OF SACRAMENTO IMPROVEMENT PLANS.

Submission deadline

Not listed in the public preview.

Red flag teaser

5 red flags detected including Complex Electrical and Traffic Control Scope - Design Compliance Risk.

Locked analysis

Full red flag list with excerpts

5 found

Complex Electrical and Traffic Control Scope - Design Compliance Risk

high

ELECTRICAL PLANS... DETAILS FOR TRAFFIC SIGNAL AND LOOP DETECTOR INSTALLATION... CCTV CAMERA INSTALLATION... LUMINAIRE MOUNTING... PULL BOX DETAILS... All work must conform to City standards and latest California MUTCD.

Contractor Responsible for All Permits and Code Compliance

high

ALL WORK TO BE PERFORMED SHALL BE IN ACCORDANCE WITH: CITY OF SACRAMENTO DESIGN & PROCEDURE MANUAL DATED SEPTEMBER 1990, CITY STANDARDS SPECIFICATIONS DATED JUNE 2007, THE LATEST CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).

No Material Substitutions Without Written Approval

high

2" SCHEDULE 40 GALVANIZED PIPE... 2" GALVANIZED THREADED PIPE COUPLING... EXACT LOCATION OF ALL STANDARD PEDESTALS, PEDESTALS AND CABINETS WILL BE DETERMINED BY THE ENGINEER PRIOR TO INSTALLATION... MATERIALS TO BE REMOVED AND SALVAGED SHALL BE DELIVERED TO THE CITY CORPORATION CENTER...

Public Works Project - Prevailing Wage and Compliance Requirements

high

CITY OF SACRAMENTO IMPROVEMENT PLANS FOR UPPER LAND PARK CAPE SEAL PROJECT... ALL WORK TO BE PERFORMED SHALL BE IN ACCORDANCE WITH: CITY OF SACRAMENTO DESIGN & PROCEDURE MANUAL DATED SEPTEMBER 1990, CITY STANDARDS SPECIFICATIONS DATED JUNE 2007

Occupied/Active Park Area - Work Restrictions and Coordination Risk

medium

UPPER LAND PARK CAPE SEAL PROJECT... SITE PLAN showing park area with multiple streets, intersections, and traffic control points... Traffic signal installation, pedestrian crosswalks, and video detection systems throughout the park.

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

4 items
  • Verify requirement: Prevailing Wage / Certified Payroll Documentation
  • Verify requirement: Contractor License
  • Resolve before bid: Complex Electrical and Traffic Control Scope - Design Compliance Risk
  • Resolve before bid: Public Works Project - Prevailing Wage and Compliance Requirements

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all