Upgrade of Passenger Elevator at RWTP

Source scope cues include: Upgrade of One Traction Elevator – Scope of work to be defined herein.; properly identify the details and scope of work required in conjunction with this Upgrade.; are to be located less than 48” from the pit floor.; walking access path (typically on a roof), provide pathway lighting accordingly.; Pit Sprinklers: Pit sprinklers, if existing, should be located within 24” of the pit floor.; by a thermostat located in the machine room that controls the temperature in that room.; maintenance through the end of the warranty period.; period as well as the one-year warranty maintenance period (i.; seconds to Contractor’s 24-hour emergency response line.; located immediately to the left of each control button or switch.; Braille shall be located below the raised character, also indicating the floor number.; covering the finish of the doorjamb where the old plates were located.; The “UP” button shall be located above the “DOWN” button.; mechanically, and shall not solely be dependent on springs.; use of the fire service controls located behind locked panels in each elevator.; car will run, as indicated by the selector switch located in the lobby.; 400 More Ave; mechanical contractor; electrical contractor.

BID WITH CAUTION 6 red flags detected : Hazardous Material / Abatement Coordination

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: Upgrade of One Traction Elevator – Scope of work to be defined herein.; properly identify the details and scope of work required in conjunction with this Upgrade.; are to be located less than 48” from the pit floor.; walking access path (typically on a roof), provide pathway lighting accordingly.; Pit Sprinklers: Pit sprinklers, if existing, should be located within 24” of the pit floor.; by a thermostat located in the machine room that controls the temperature in that room.; maintenance through the end of the warranty period.; period as well as the one-year warranty maintenance period (i.; seconds to Contractor’s 24-hour emergency response line.; located immediately to the left of each control button or switch.; Braille shall be located below the raised character, also indicating the floor number.; covering the finish of the doorjamb where the old plates were located.; The “UP” button shall be located above the “DOWN” button.; mechanically, and shall not solely be dependent on springs.; use of the fire service controls located behind locked panels in each elevator.; car will run, as indicated by the selector switch located in the lobby.; 400 More Ave; mechanical contractor; electrical contractor.

Submission deadline

2024-11-01

Red flag teaser

6 red flags detected including Hazardous Material / Abatement Coordination.

Locked analysis

Full red flag list with excerpts

6 found

Hazardous Material / Abatement Coordination

high

…equipment will require relocation or enclosure. If the equipment is to be enclosed, the enclosure shall be two- hour fire rated. f. Asbestos: General Contractor shall abate any asbestos located in any elevator machine space. Contractor shall identify other hazardous conditions in their bid that require additional work by General Contractor. g. Cutting and Patching: Elevator Contractor shall be re

Liquidated Damages

high

…to complete the project by the date indicated on the schedule agreed to at the outset of the project, General Contractor may deduct liquidated damages as negotiated in award of project. g. The schedule of record shall be the original schedule submitted within the first week after Contractor receives fully executed Agreements. Any authorized schedule changes shall be agreed to in writing by all pa

Retainage

high

…ter the project completion date. Contractor agrees to complete all such items within 30 days of the project completion date. Project retainage shall be held and paid when every item on the project punchlist is completed to the satisfaction of General Contractor, Owner and Consultant. 2. Contractor’s personnel a. Contractor agrees to assign a single lead mechanic to the project. In the case where

Subcontractor Pre-Approval Required

medium

…as necessary to reflect these actions. B. Cab Interiors 1. Contractor shall perform all cab work, or may subcontract to Others. Any subcontracting shall be approved in advance by Architect and Owner. 2. Scope of work for cab interiors shall be as follows: a. Cab Ceiling/Lighting: Retain ceiling and light fixtures. Replace bulbs with LED lighting if possible. b. Cab Flooring: Replace flooring with

Sustainability / LEED Compliance Requirement

medium

…wings and specifications and actual site conditions. Schedule visits at least 1 week in advance with Owner's Maintenance staff. 1.08 ENVIRONMENTAL REQUIREMENTS A. After other work such as sanding, painting etc. has been completed, clean lighting fixtures, panelboards, switchboards, and other electrical equipment to remove dust, dirt, and grease, or other marks, and leave work in clean condition.

Locked analysis

All deadlines table

1 dates
ItemDue
Section 142100 142100 - 31 2024-11-01

Locked analysis

Required certifications checklist

1 items
  • Include references or past project experience

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all