← Public RFP analyses

Underground Storage Tank Modifications at Skinner Water Treatment Plant

Source scope cues include: bid bond, if furnished, shall become void. The security submitted by unsuccessful bidders will be returned within 15 days of Metropolitan’s execution of the attached Pr; PlanetBids. To log onto to go to PlanetBids: http://www.planetbids.com/portal/portal; sealed proposal; Contract documents on this project are available on Metropolitan's on-line bid system called PlanetBids.; agents; the breach of any warranty, whether express or goods, services, or materials pursuant to the Contract.; The Contractor shall obtain all necessary permits from city and other government agencies, as necessary.; requirements and entry permits as required with the Engineer prior to start of work.; The costs for the permits and inspections shall be included in the price entered in the Bidding Sheet.; shall be performed under the terms and conditions of these permits.; each subcontractor including cell phone and emergency numbers.; Metropolitan’s permits and local, state, and federal environmental regulations, acts, laws, and ordinances.; requirements of all such permits and laws, regulations, acts, codes and ordinances.; Contractor with copies of all environmental permits procured by Metropolitan.; All environmental or otherwise applicable permits procured by the Contractor.; disposal permits and applicable local, state and federal laws and regulations.; The Contractor shall obtain all required permits from Riverside County Department of Environmental Health.; WATER TREATMENT PLANT; Houston; Electrical Contractors.

BID WITH CAUTION 13 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: bid bond, if furnished, shall become void. The security submitted by unsuccessful bidders will be returned within 15 days of Metropolitan’s execution of the attached Pr; PlanetBids. To log onto to go to PlanetBids: http://www.planetbids.com/portal/portal; sealed proposal; Contract documents on this project are available on Metropolitan's on-line bid system called PlanetBids.; agents; the breach of any warranty, whether express or goods, services, or materials pursuant to the Contract.; The Contractor shall obtain all necessary permits from city and other government agencies, as necessary.; requirements and entry permits as required with the Engineer prior to start of work.; The costs for the permits and inspections shall be included in the price entered in the Bidding Sheet.; shall be performed under the terms and conditions of these permits.; each subcontractor including cell phone and emergency numbers.; Metropolitan’s permits and local, state, and federal environmental regulations, acts, laws, and ordinances.; requirements of all such permits and laws, regulations, acts, codes and ordinances.; Contractor with copies of all environmental permits procured by Metropolitan.; All environmental or otherwise applicable permits procured by the Contractor.; disposal permits and applicable local, state and federal laws and regulations.; The Contractor shall obtain all required permits from Riverside County Department of Environmental Health.; WATER TREATMENT PLANT; Houston; Electrical Contractors.

Submission deadline

2019-05-15

Red flag teaser

13 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

13 found

Broad Indemnification

high

General Conditions accompanied by the documents enumerated in California (b) Said duty to defend, indemnify and save harmless Code of Civil Procedure section 995.660. The bonds shall shall not be affected by the fact that Metropolitan, the be submitted in the form of “Bond for Faithful Board, any members of the Board, or Metropolitan's Performance” and “Payment Bond,” furnished by officers, agents

Hazardous Material / Abatement Coordination

high

…Lead Certifications for Supervisors and Workers Asbestos Abatement Plan Asbestos Certifications for Supervisors and Workers PCB Abatement Plan and Requirements Other Hazardous Wastes Hazardous Waste Management Plan (handling procedures, labeling, transportation and disposal) Welding, Cutting, and Other Hot Work Written Hot Work Permit Electrical Assured Equipment Grounding Conduct…

Liquidated Damages

high

…d shall be forfeited, cashed, or enforced as appropriate. The money available therefrom shall become the property of Metropolitan as liquidated damages for such failure or refusal. If the successful bidder complies with the foregoing requirements in a timely manner, its cash deposit, certified or cashier's check, if furnished, shall be returned to it within 5 days of Contract execution, or the bi

Prevailing Wage / Certified Payroll

high

…nd comply with all state jobsite. The Contractor shall pay not less than such and national laws, county and municipal ordinances and prevailing wages to all workers employed on public work regulations and orders of public bodies that in any manner unless the project involves a total consideration of one affect those engaged or employed in the work, or the thousand dollars ($1,000.00) or less. The

Bid Bond Required

medium

…r, its cash deposit, certified or cashier's check, if furnished, shall be returned to it within 5 days of Contract execution, or the bid bond, if furnished, shall become void. The security submitted by unsuccessful bidders will be returned within 15 days of Metropolitan’s execution of the attached Proposal. 4. Packaging the Bid -- The bid shall be enclosed in a sealed envelope marked and addresse

Locked analysis

All deadlines table

1 dates
ItemDue
inspection scheduled for 10:00 a.m., 2019-05-15

Locked analysis

Required certifications checklist

21 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all