← Public RFP analyses

Underground Storage Tank Modifications at Diemer Water Treatment Plant

Source scope cues include: bid bond, if furnished, shall become void. The security submitted by unsuccessful bidders will be returned within 15 days of Metropolitan’s execution of the attached Pr; PlanetBids. To log onto to go to PlanetBids: http://www.planetbids.com/portal/portal; sealed proposal; Contract documents on this project are available on Metropolitan's on-line bid system called PlanetBids.; not accept any bid without proof of current registration to perform public work pursuant to Section 1725.; Bonds from other sureties shall be any warranty, express or implied.; The Contractor shall obtain all necessary permits from city and other government agencies, as necessary.; and entry permits as required with the Engineer prior to start of work.; The Contractor shall also obtain permits and licenses required for conducting its business.; for the permits and inspections shall be included in the price entered in the Bidding Sheet.; under the terms and conditions of these permits.; each subcontractor including cell phone and emergency numbers.; Metropolitan’s permits and local, state, and federal environmental regulations, acts, laws, and ordinances.; requirements of all such permits and laws, regulations, acts, codes and ordinances.; Contractor with copies of all environmental permits procured by Metropolitan.; All environmental or otherwise applicable permits procured by the Contractor.; Water Treatment Plant; Houston; Electrical Contractors.

BID WITH CAUTION 14 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: bid bond, if furnished, shall become void. The security submitted by unsuccessful bidders will be returned within 15 days of Metropolitan’s execution of the attached Pr; PlanetBids. To log onto to go to PlanetBids: http://www.planetbids.com/portal/portal; sealed proposal; Contract documents on this project are available on Metropolitan's on-line bid system called PlanetBids.; not accept any bid without proof of current registration to perform public work pursuant to Section 1725.; Bonds from other sureties shall be any warranty, express or implied.; The Contractor shall obtain all necessary permits from city and other government agencies, as necessary.; and entry permits as required with the Engineer prior to start of work.; The Contractor shall also obtain permits and licenses required for conducting its business.; for the permits and inspections shall be included in the price entered in the Bidding Sheet.; under the terms and conditions of these permits.; each subcontractor including cell phone and emergency numbers.; Metropolitan’s permits and local, state, and federal environmental regulations, acts, laws, and ordinances.; requirements of all such permits and laws, regulations, acts, codes and ordinances.; Contractor with copies of all environmental permits procured by Metropolitan.; All environmental or otherwise applicable permits procured by the Contractor.; Water Treatment Plant; Houston; Electrical Contractors.

Submission deadline

2019-08-01

Red flag teaser

14 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

14 found

Broad Indemnification

high

…herein required shall be (OSHA) and the California Industrial Safety Act. This deemed to be approved unless specifically rejected by indemnification is in addition to and not in limitation of Metropolitan. Bonds from other sureties shall be any warranty, express or implied. accompanied by the documents enumerated in California (b) Said duty to defend, indemnify and save harmless Code of Civil Pro

Hazardous Material / Abatement Coordination

high

…Lead Certifications for Supervisors and Workers Asbestos Abatement Plan Asbestos Certifications for Supervisors and Workers PCB Abatement Plan and Requirements Other Hazardous Wastes Hazardous Waste Management Plan (handling procedures, labeling, transportation and disposal) Welding, Cutting, and Other Hot Work Written Hot Work Permit Electrical Assured Equipment Grounding Conduct…

Liquidated Damages

high

…d shall be forfeited, cashed, or enforced as appropriate. The money available therefrom shall become the property of Metropolitan as liquidated damages for such failure or refusal. If the successful bidder complies with the foregoing requirements in a timely manner, its cash deposit, certified or cashier's check, if furnished, shall be returned to it within 5 days of Contract execution, or the bi

Mandatory Pre-Bid / Pre-Proposal Meeting

high

…tropolitan representative at the main desk and wait in the main lobby until escorted to the project sites. Contractors attending the mandatory prebid meeting are encouraged to register on Metropolitan's on-line bid system and download and print the bid documents and bring them to the prebid meeting. All bidders shall have a valid California contractor’s license, classification A, C-7, or C-10 at

Prevailing Wage / Certified Payroll

high

…cipal ordinances and jobsite. The Contractor shall pay not less than such regulations and orders of public bodies that in any manner prevailing wages to all workers employed on public work affect those engaged or employed in the work, or the unless the project involves a total consideration of one materials used in the work, or that in any way affect the thousand dollars ($1,000.00) or less. The

Locked analysis

All deadlines table

2 dates
ItemDue
inspection scheduled for 10:00 a.m., 2019-08-01
Revised 2019-07-08

Locked analysis

Required certifications checklist

20 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all