Trolley Park Lighting and Shade Structure

Source scope cues include: City of Fresno; City of Fresno has adopted; bid bond sufficient to provide coverage in such amount. All Bid Deposits will be held until a Contract has been executed with the successful Bidder or all bids have bee; The contractor shall provide complete and accurate billing invoices in order to receive payment.; therein or the full limit of any insurance proceeds to the named insured.; payment of any self-insured retentions.; employees and volunteers as an additional insured.; company endorsement providing additional insured status.; data and documents throughout the duration of the Contract.; invoices sent to or paid by the City.; for violation of prevailing wage rates.; Owner approved invoices of the Mediator actually billed to Owner by Contractor.; tests, utilities, or imperfections.; where specified otherwise in Specifications or required permits.; The Contractor shall secure all permits required to complete the items of this Contract.; fees will be charged for any City permits, other than for a water meter, if required.; Disposal Site(s) and the status of any permits or licenses in connection therewith.; 2600 Fresno Street; 2600 Fresno Street, Fresno, California; 2600 Fresno Street, Fresno CA; Mechanical Contractor; Electrical Contractor.

BID WITH CAUTION 18 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Fresno; City of Fresno has adopted; bid bond sufficient to provide coverage in such amount. All Bid Deposits will be held until a Contract has been executed with the successful Bidder or all bids have bee; The contractor shall provide complete and accurate billing invoices in order to receive payment.; therein or the full limit of any insurance proceeds to the named insured.; payment of any self-insured retentions.; employees and volunteers as an additional insured.; company endorsement providing additional insured status.; data and documents throughout the duration of the Contract.; invoices sent to or paid by the City.; for violation of prevailing wage rates.; Owner approved invoices of the Mediator actually billed to Owner by Contractor.; tests, utilities, or imperfections.; where specified otherwise in Specifications or required permits.; The Contractor shall secure all permits required to complete the items of this Contract.; fees will be charged for any City permits, other than for a water meter, if required.; Disposal Site(s) and the status of any permits or licenses in connection therewith.; 2600 Fresno Street; 2600 Fresno Street, Fresno, California; 2600 Fresno Street, Fresno CA; Mechanical Contractor; Electrical Contractor.

Submission deadline

2026-01-13

Red flag teaser

18 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

18 found

Back-Charge / Setoff Rights

high

…this determination is given to the Contractor, a substantial monetary penalty, on account of the NTH violation, may be withheld and set off by the Finance Department from progress payments, or the final payment, due to the Contractor for work performed under the Contract. Depending upon the seriousness or willfulness of the NTH violation, the amount of money which may be withheld may be up to, bu

Broad Indemnification

high

…m the date of bid opening. If the City determines that a tiebreaker is necessary, each applicable Bidder agrees to participate or to indemnify the City in any litigation resulting from the utilization of the tiebreaker. If a Bidder refuses to timely participate, the City shall conduct the coin toss in a manner determined by the City to be fair to all and the results of such coin toss shall be fin

Hazardous Material / Abatement Coordination

high

…nts, evidencing renewal of such policy not less than fifteen (15) calendar days prior to the expiration date of the expiring policy. (ii) In the event this Contract involves any lead-based environmental hazard (e.g., lead based paint), the Contractors Pollution Liability insurance policy shall be endorsed to include coverage for lead based environmental A240856 2024-05 CPDNoFedDivII 2.4 rev. 07.2

Lien Waiver / Waiver of Lien Rights

high

…he Contract Documents; or (iii) terms of special warranties required by the Contract Documents. Contractor shall promptly provide an unconditional waiver and release upon final payment in accordance with California Civil Code section 3262 and these Contract Documents. Except to the extent of any Claim arising from City’s sole or active negligence, and except to the extent Contractor expressly des

Liquidated Damages

high

….1 Bid Proposal Form .................................................................................... 1.2 Time of Completion and Liquidated Damages .......................................... 1.4 Time Period to Award Bid ......................................................................... 1.4 List of Subcontractors ..........................................................................

Locked analysis

All deadlines table

2 dates
ItemDue
SCHEDULED BID OPENING 2026-01-13
A pre-bid conference will be held at 9:00 a.m., on Tuesday, 2026-01-06

Locked analysis

Required certifications checklist

24 items
  • Complete bid/proposal form
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all