Sunset Boulevard and Alpine Drive Intersection - Pavement Restoration

Source scope cues include: City of Beverly Hills; bid bond, if furnished, shall become void. The security submitted by unsuccessful bidders will be returned within 15 days of Metropolitan’s execution of the attached Pr; PlanetBids. To log onto to go to PlanetBids: http://www.planetbids.com/portal/portal; sealed proposal; Contract documents on this project are available on Metropolitan's on-line bid system called PlanetBids.; agents; the breach of any warranty, whether express or goods, services, or materials pursuant to the Contract.; The Contractor shall obtain all necessary permits and pay any fees from city and other government agencies, as necessary.; shall submit copies of the Safety Data Sheets (SDS) prior to bringing hazardous materials on-site.; The Contractor shall also obtain permits and licenses required for conducting its business.; costs for the permits and inspections shall be included in the price entered in the Bidding Sheet.; performed under the terms and conditions of these permits.; each subcontractor including cell phone and emergency numbers.; Erosion control mats, fiber rolls and other BMPs containing plastic netting shall not be allowed.; mechanical spreader may be used only if the area is too confined for machine spreading.; the center of the replacement area..

BID WITH CAUTION 13 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Beverly Hills; bid bond, if furnished, shall become void. The security submitted by unsuccessful bidders will be returned within 15 days of Metropolitan’s execution of the attached Pr; PlanetBids. To log onto to go to PlanetBids: http://www.planetbids.com/portal/portal; sealed proposal; Contract documents on this project are available on Metropolitan's on-line bid system called PlanetBids.; agents; the breach of any warranty, whether express or goods, services, or materials pursuant to the Contract.; The Contractor shall obtain all necessary permits and pay any fees from city and other government agencies, as necessary.; shall submit copies of the Safety Data Sheets (SDS) prior to bringing hazardous materials on-site.; The Contractor shall also obtain permits and licenses required for conducting its business.; costs for the permits and inspections shall be included in the price entered in the Bidding Sheet.; performed under the terms and conditions of these permits.; each subcontractor including cell phone and emergency numbers.; Erosion control mats, fiber rolls and other BMPs containing plastic netting shall not be allowed.; mechanical spreader may be used only if the area is too confined for machine spreading.; the center of the replacement area..

Submission deadline

2019-02-13

Red flag teaser

13 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

13 found

Broad Indemnification

high

General Conditions accompanied by the documents enumerated in California (b) Said duty to defend, indemnify and save harmless Code of Civil Procedure section 995.660. The bonds shall shall not be affected by the fact that Metropolitan, the be submitted in the form of “Bond for Faithful Board, any members of the Board, or Metropolitan's Performance” and “Payment Bond,” furnished by officers, agents

Hazardous Material / Abatement Coordination

high

…Lead Certifications for Supervisors and Workers Asbestos Abatement Plan Asbestos Certifications for Supervisors and Workers PCB Abatement Plan and Requirements Other Hazardous Wastes Hazardous Waste Management Plan (handling procedures, labeling, transportation and disposal) Welding, Cutting, and Other Hot Work Written Hot Work Permit Electrical Assured Equipment Grounding Conduct…

Liquidated Damages

high

…d shall be forfeited, cashed, or enforced as appropriate. The money available therefrom shall become the property of Metropolitan as liquidated damages for such failure or refusal. If the successful bidder complies with the foregoing requirements in a timely manner, its cash deposit, certified or cashier's check, if furnished, shall be returned to it within 5 days of Contract execution, or the bi

Mandatory Pre-Bid / Pre-Proposal Meeting

high

…Beverly Hills, CA 90210. All attendees shall sign-in with the Metropolitan representative at the jobsite. Contractors attending the mandatory pre-bid meeting shall register on Metropolitan's on-line bid system and download and print the bid documents and bring them to the pre-bid meeting. All bidders shall have a valid California contractor’s license, classification A or C-12, at the time of subm

Prevailing Wage / Certified Payroll

high

…nd comply with all state jobsite. The Contractor shall pay not less than such and national laws, county and municipal ordinances and prevailing wages to all workers employed on public work regulations and orders of public bodies that in any manner unless the project involves a total consideration of one affect those engaged or employed in the work, or the thousand dollars ($1,000.00) or less. The

Locked analysis

All deadlines table

2 dates
ItemDue
inspection scheduled for 10:00 a.m., 2019-02-13
Revised 2019-01-29

Locked analysis

Required certifications checklist

21 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all