Sump 87 Diversion & Silver Eagle Road Rehabilitation Project

Source scope cues include: City of Sacramento; City of Sacramento Bid Opening; bid security of at least 10% of the sum the Bid Proposal. The City reserves the right to reject proposals or to waive any error or omission in any Bid Proposal received. Si; planetbids.com/portal/portal; bond requirements of the Contractor. 4. The work performed or the materials or equipment provided by the listed LBE subcontractor or supplier are unsatisfactory or are not in ac...; an alteration, demolition, repair, and maintenance project of $15,000 or less.; approved in regulations promulgated by the City Department of Utilities.; entered into in response to a declared emergency.; warranty period without expense or charge of any nature whatsoever to City.; demand all costs and expense of such repair.; such defect, and Contractor shall pay to City on demand all costs and expense of such repair.; otherwise ceases to be insured as required herein.; classification in which a prevailing wage determination has been published.; contractors, or public utilities or their contractors.; of all craft employees working within the scope of this Agreement.; provisions of the California Labor Code and Prevailing Wage Rate Determination.; is required if a project has multiple building permits associated to it (i.; 06 Proof of Compliance with Contract .; Houston; 3525 Norwood Ave, Sacramento, CA; 1 LS Avenue.

BID WITH CAUTION 19 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Sacramento; City of Sacramento Bid Opening; bid security of at least 10% of the sum the Bid Proposal. The City reserves the right to reject proposals or to waive any error or omission in any Bid Proposal received. Si; planetbids.com/portal/portal; bond requirements of the Contractor. 4. The work performed or the materials or equipment provided by the listed LBE subcontractor or supplier are unsatisfactory or are not in ac...; an alteration, demolition, repair, and maintenance project of $15,000 or less.; approved in regulations promulgated by the City Department of Utilities.; entered into in response to a declared emergency.; warranty period without expense or charge of any nature whatsoever to City.; demand all costs and expense of such repair.; such defect, and Contractor shall pay to City on demand all costs and expense of such repair.; otherwise ceases to be insured as required herein.; classification in which a prevailing wage determination has been published.; contractors, or public utilities or their contractors.; of all craft employees working within the scope of this Agreement.; provisions of the California Labor Code and Prevailing Wage Rate Determination.; is required if a project has multiple building permits associated to it (i.; 06 Proof of Compliance with Contract .; Houston; 3525 Norwood Ave, Sacramento, CA; 1 LS Avenue.

Submission deadline

2023-03-22

Red flag teaser

19 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

19 found

Back-Charge / Setoff Rights

high

…specified above shall in any manner be construed to constitute a release of any such liabilities nor a waiver of the City’s right to withhold payment for such liabilities. 16. INDEMNITY AND HOLD HARMLESS A. Contractor shall defend, hold harmless and indemnify the City, its officers, employees, and agents, and each and every one of them, from and against any and all actions, Form approved by City

Broad Indemnification

high

…hall in any manner be construed to constitute a release of any such liabilities nor a waiver of the City’s right to withhold payment for such liabilities. 16. INDEMNITY AND HOLD HARMLESS A. Contractor shall defend, hold harmless and indemnify the City, its officers, employees, and agents, and each and every one of them, from and against any and all actions, Form approved by City Attorney 1‐11‐17

Hazardous Material / Abatement Coordination

high

UNIONS Asbestos Wot -ers Local #16 Iron Workers Local #118 e— La orer Local #c 8)5 Masons L P terers & nt Mdrns Local #300 rn Caltfo ia Carpenters Regional Council u fJourneymei App ntices of the on self and its affiliated Local Unions umbing & Pipe Fitting lnd. Local #355 '11 District /uneil #16 International Plumbers & Pipefitters Local #447 Union of Painters & Allied Trades Elevator Construe ts

Liquidated Damages

high

…ithin a period of One Hundred Sixty Five (165) working days commencing on the date specified in the Notice to Proceed. The amount of liquidated damages to be paid by the Contractor for failure to complete the work by the completion date (as extended, if applicable) shall be $ 1,500 for each calendar day, continuing to the time at which the work is completed. Such amount is the actual cash value a

No Material Substitutions Without Owner Approval

high

…supplier fails to perform its contractual obligations. 6. It would be in the best interest of the City. Subcontractor Substitution: No substitution of an LBE subcontractor shall be made at any time without compliance with the Subletting and Subcontracting Fair Practices Act. If an LBE subcontractor is unable to perform successfully and is to be replaced, the Contractor shall make reasonable effor

Locked analysis

All deadlines table

1 dates
ItemDue
A Pre-Bid Site Visit will be held at 11:00 AM on 2023-03-22

Locked analysis

Required certifications checklist

22 items
  • Complete bid/proposal form
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all