Sump 157 Security Improvements

Source scope cues include: City of Sacramento; CITY OF SACRAMENTO Sealed Proposals; bid security of at least 10% of the sum the Bid Proposal. The City reserves the right to reject proposals or to waive any error or omission in any Bid Proposal received. Si; planetbids.com/portal/portal; bond requirements of the Contractor. 4. The work performed or the materials or equipment provided by the listed LBE subcontractor or supplier are unsatisfactory or are not in ac...; New City Hall, located at 915 I Street, 5th Floor, Mayor’s Reception Desk, up to the hour of 2:00 p.; an alteration, demolition, repair, and maintenance project of $15,000 or less.; entered into in response to a declared emergency.; warranty period without expense or charge of any nature whatsoever to City.; demand all costs and expense of such repair.; such defect, and Contractor shall pay to City on demand all costs and expense of such repair.; otherwise ceases to be insured as required herein.; is required if a project has multiple building permits associated to it (i.; the facilities at all times for normal and emergency purposes.; established for emergency care of persons who may be injured on the job site.; procedure for City permits, such as confined space entry permit, hot work permit, etc.; piping, flooding and similar occurrences, requiring an immediate emergency response.; includes brazing, cutting, grinding, soldering, torch-applied roofing, and welding.; 2812 Meadowview Road, Building; 1 Morrison Avenue, Sacramento, CA..

BID WITH CAUTION 19 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Sacramento; CITY OF SACRAMENTO Sealed Proposals; bid security of at least 10% of the sum the Bid Proposal. The City reserves the right to reject proposals or to waive any error or omission in any Bid Proposal received. Si; planetbids.com/portal/portal; bond requirements of the Contractor. 4. The work performed or the materials or equipment provided by the listed LBE subcontractor or supplier are unsatisfactory or are not in ac...; New City Hall, located at 915 I Street, 5th Floor, Mayor’s Reception Desk, up to the hour of 2:00 p.; an alteration, demolition, repair, and maintenance project of $15,000 or less.; entered into in response to a declared emergency.; warranty period without expense or charge of any nature whatsoever to City.; demand all costs and expense of such repair.; such defect, and Contractor shall pay to City on demand all costs and expense of such repair.; otherwise ceases to be insured as required herein.; is required if a project has multiple building permits associated to it (i.; the facilities at all times for normal and emergency purposes.; established for emergency care of persons who may be injured on the job site.; procedure for City permits, such as confined space entry permit, hot work permit, etc.; piping, flooding and similar occurrences, requiring an immediate emergency response.; includes brazing, cutting, grinding, soldering, torch-applied roofing, and welding.; 2812 Meadowview Road, Building; 1 Morrison Avenue, Sacramento, CA..

Submission deadline

Not listed in the public preview.

Red flag teaser

19 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

19 found

Back-Charge / Setoff Rights

high

…specified above shall in any manner be construed to constitute a release of any such liabilities nor a waiver of the City’s right to withhold payment for such liabilities. 16. INDEMNITY AND HOLD HARMLESS A. Contractor shall defend, hold harmless and indemnify the City, its officers, employees, and agents, and each and every one of them, from and against any and all actions, damages, costs, liabil

Broad Indemnification

high

…City’s right to withhold payment for such liabilities. 16. INDEMNITY AND HOLD HARMLESS A. Contractor shall defend, hold harmless and indemnify the City, its officers, employees, and agents, and each and every one of them, from and against any and all actions, damages, costs, liabilities, claims, demands, losses, judgments, penalties, costs and expenses of every type and description, whether arisi

Hazardous Material / Abatement Coordination

high

…act Documents. E. Training & Certificates 1. Contractor personnel shall have sufficient training and certificates in performing work such as confined space entry, asbestos material removal, welding, diving, heavy equipment operation, and others. Up-to-date certificates for all personnel performing such work shall be provided to City before the start of the work. SITE SAFETY REQUIREMENTS 011450 -

Lien Waiver / Waiver of Lien Rights

high

…tion or judicial proceeding brought to enforce, construe or interpret the Purchase Order. F. All indemnification, payment, warranty, lien waiver, title and remedies provisions shall survive the termination of expiration of the Purchase Order. Client Special Instuctions Request / Committed Delivery Date Assuring you of our keenest service. Thank you for approving quote: SC/NF/SD/NZ/67E Kind Regard

Liquidated Damages

high

…completion of the work within a period of 130 working days commencing on the date specified in the Notice to Proceed. The amount of liquidated damages to be paid by the Contractor for failure to complete the work by the completion date (as extended, if applicable) shall be $1,500 for each working day, continuing to the time at which the work is completed. Such amount is the actual cash value agre

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

23 items
  • Complete bid/proposal form
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all