South Hills Shopping Center Tenant Improvements

Source scope cues include: City of Sacramento CONCRETE REINFORCEMENT; City of Sacramento CAST; Overhead Repair Mortar: L&M Construction Chemicals "Durapatch VOH" or approved equal.; elastic roofing, or sand bed terrazzo, and as indicated.; mechanical floating and troweling machine shall be used.; Do not cover with sheeting or waterproof paper.; Maintain continuity of coating and repair damage during curing period.; Roof-top equipment bases and support curbs.; Gypsum sheathing under single ply membrane roofing is specified in Section 07530.; Increase fastener spacing at roof corners as required by FM Class I-60.; visually; where not possible to repair, replace.; and visually; where not possible to repair, replace woodwork.; Medium Density Fiber Board: 3/4-inch thick, 48-pcf density.; Remove and replace materials damaged beyond repair or stained beyond cleaning.; possible to properly repair, replace.; Vapor Barrier Sheeting: Fortifiber Corp.; Roof insulation directly under single ply roof membrane is specified in Section 07530.; Mechanical Anchors: Miracle Adhesive Corp.; 11176 Penrose St.

BID WITH CAUTION 3 red flags detected : Hazardous Material / Abatement Coordination

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Sacramento CONCRETE REINFORCEMENT; City of Sacramento CAST; Overhead Repair Mortar: L&M Construction Chemicals "Durapatch VOH" or approved equal.; elastic roofing, or sand bed terrazzo, and as indicated.; mechanical floating and troweling machine shall be used.; Do not cover with sheeting or waterproof paper.; Maintain continuity of coating and repair damage during curing period.; Roof-top equipment bases and support curbs.; Gypsum sheathing under single ply membrane roofing is specified in Section 07530.; Increase fastener spacing at roof corners as required by FM Class I-60.; visually; where not possible to repair, replace.; and visually; where not possible to repair, replace woodwork.; Medium Density Fiber Board: 3/4-inch thick, 48-pcf density.; Remove and replace materials damaged beyond repair or stained beyond cleaning.; possible to properly repair, replace.; Vapor Barrier Sheeting: Fortifiber Corp.; Roof insulation directly under single ply roof membrane is specified in Section 07530.; Mechanical Anchors: Miracle Adhesive Corp.; 11176 Penrose St.

Submission deadline

Not listed in the public preview.

Red flag teaser

3 red flags detected including Hazardous Material / Abatement Coordination.

Locked analysis

Full red flag list with excerpts

3 found

Hazardous Material / Abatement Coordination

high

…ASTM C920. E. Form materials to remain in place in the completed work and sealant used for firestopping work shall be UL listed and labeled. F. Firestopping materials shall be rated as required when tested in accordance with ASTM E119. G. Firestopping materials shall be asbestos free and shall not incorporate nor require the use of hazardous solvents. City of Sacramento FIRESTOPPING SHSC 07270 -

Extended Warranty (> 1 Year)

medium

…assure proper installation, operation, adjustment, cleaning, and servicing. 1.05 PROJECT WARRANTY A. Furnish manufacturer's written 5-year warranty against silver spoilage of mirrors, agreeing to replace any mirrors that develop visible defects within warranty period. This warranty shall be in addition to and not a limitation of other rights the Owner may have against the Contractor under the Con

Occupied Building Constraints

medium

…anical and Electrical Work: Painting mechanical and electrical work is limited to items exposed in mechanical equipment rooms and in occupied spaces. Finish to match adjoining wall or ceiling surfaces. 1. Mechanical items to be painted include, but are not limited to, piping, hangers, and supports; heat exchangers; tanks; ductwork; insulation; supports; motors and mechanical equipment; air grille

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

1 items
  • Review RFP instructions to bidders before submission

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all