Short-Term Rental of Heavy Equipment and Gravel Screening and Washing Equipment

The City of Sacramento seeks short-term rental of heavy equipment and gravel screening/washing equipment for a water forum project at Upper Sailor Bar Area in Fair Oaks, California. The project involves side-channel excavation, gravel placement, rock processing, and power screen operations over a 4.5 to 5-week period beginning August 29, 2018. Equipment includes bulldozers, excavators, articulated trucks, water wagons, front loaders, screening plants, and portable restrooms. This is a nonprofessional services contract with no federal funding, subject to Sacramento City Code requirements including Local Business Enterprise (LBE) participation. Source scope cues include: CITY OF SACRAMENTO CCOMWP; CITY OF SACRAMENTO Bid No; Bid Security. Bid Security is: [ ] Required [ X ] Not Required If required, bid security approved by the City must accompany the bid, in the amount of ___ % of the total am; planetbids.com/portal/portal; The City assumes that all invoices are paid within the discount terms (all discounts are taken).; Emergency/Declared Disaster Requirements.; terms and conditions that apply during non-emergency/disaster conditions.; located in the City or unincorporated county of Sacramento.; (2) Description of services billed under this invoice.; proof of an incorrect billing shall be on the Contractor.; acceptance of material, or from date of receipt of invoice, whichever is latest.; on delivery and acceptance of goods and on receipt of Contractor's invoice.; of the contract action, the Scope of Work, or any change that impacts the cost/price or schedule.; VENDOR SHALL INVOICE BASED ON THE APPROPRIATE REVISED TERM.; This project is subject to permits being obtained in order to proceed.; the City does not receive the permits, this project will be postponed until the permits are received.; date delivery is made and is accepted by the City, or the date a proper invoice is received, whichever is later.; 4253 Illinois Avenue, Fair.

BID WITH CAUTION 26 red flags detected : LBE Participation Requirement - 5% Minimum

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

The City of Sacramento seeks short-term rental of heavy equipment and gravel screening/washing equipment for a water forum project at Upper Sailor Bar Area in Fair Oaks, California. The project involves side-channel excavation, gravel placement, rock processing, and power screen operations over a 4.5 to 5-week period beginning August 29, 2018. Equipment includes bulldozers, excavators, articulated trucks, water wagons, front loaders, screening plants, and portable restrooms. This is a nonprofessional services contract with no federal funding, subject to Sacramento City Code requirements including Local Business Enterprise (LBE) participation. Source scope cues include: CITY OF SACRAMENTO CCOMWP; CITY OF SACRAMENTO Bid No; Bid Security. Bid Security is: [ ] Required [ X ] Not Required If required, bid security approved by the City must accompany the bid, in the amount of ___ % of the total am; planetbids.com/portal/portal; The City assumes that all invoices are paid within the discount terms (all discounts are taken).; Emergency/Declared Disaster Requirements.; terms and conditions that apply during non-emergency/disaster conditions.; located in the City or unincorporated county of Sacramento.; (2) Description of services billed under this invoice.; proof of an incorrect billing shall be on the Contractor.; acceptance of material, or from date of receipt of invoice, whichever is latest.; on delivery and acceptance of goods and on receipt of Contractor's invoice.; of the contract action, the Scope of Work, or any change that impacts the cost/price or schedule.; VENDOR SHALL INVOICE BASED ON THE APPROPRIATE REVISED TERM.; This project is subject to permits being obtained in order to proceed.; the City does not receive the permits, this project will be postponed until the permits are received.; date delivery is made and is accepted by the City, or the date a proper invoice is received, whichever is later.; 4253 Illinois Avenue, Fair.

Submission deadline

2018-07-29

Red flag teaser

26 red flags detected including LBE Participation Requirement - 5% Minimum.

Locked analysis

Full red flag list with excerpts

26 found

LBE Participation Requirement - 5% Minimum

high

The City has established a minimum 5% participation level for LBEs on this contract. Pursuant to City Code Section 3.60.270, no bidder on this contract shall be considered responsive unless its bid meets or exceeds this minimum participation level.

LBE Performance and Substitution Requirements

high

The LBEs listed as subconsultants or subcontractors by the Contractor shall perform the work or services for which they are listed unless the Contractor has received prior written authorization from the City to perform the work or services in another manner. If the Contractor fails to correct a deficiency within fifteen (15) days after notification, a deduction may be made from the agreement amount. The deduction shall be ten (10) percent of the estimated value of the services performed during the month, not to be less than $1,000 nor exceed $10,000.

Mandatory Pre-Bid / Pre-Proposal Meeting

high

…f award. For purposes of award, The City assumes that all invoices are paid within the discount terms (all discounts are taken). 12. Mandatory Pre-Bid Conference. If a mandatory Pre-Bid Conference is indicated on the Invitation for Bid, all bidders are required to attend the conference. Failure to attend this conference will result in rejection of your bid. If a mandatory Pre-Bid Conference is in

Termination for Convenience

high

The City shall have the right to terminate at any time any contract awarded pursuant to a bid that contains false information. If the Contractor fails to correct the unsatisfactory conditions within 5 days, the Procurement Services Manager may declare this contract terminated upon 30 days written notice.

Termination Liability for Re-Procurement Costs

high

In the event of termination hereunder, the Contractor and/or surety will be liable and assessed for any and all costs for the re-procurement of the contract services.

Locked analysis

All deadlines table

6 dates
ItemDue
Questions Due 2018-07-29
Bid Submission Deadline 2018-08-08
Bid Opening 2018-08-08
Contract Award 2018-11-06
Project Start Date 2018-08-29
Project Completion 2018-10-05

Locked analysis

Required certifications checklist

18 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Include contractor license information
  • Acknowledge all addenda
  • Confirm mandatory pre-bid meeting or site visit attendance
  • Verify requirement: Commercial General Liability Insurance

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all