The City of Sacramento seeks short-term rental of heavy equipment and gravel screening/washing equipment for a water forum project at Upper Sailor Bar Area in Fair Oaks, California. The project involves side-channel excavation, gravel placement, rock processing, and power screen operations over a 4.5 to 5-week period beginning August 29, 2018. Equipment includes bulldozers, excavators, articulated trucks, water wagons, front loaders, screening plants, and portable restrooms. This is a nonprofessional services contract with no federal funding, subject to Sacramento City Code requirements including Local Business Enterprise (LBE) participation. Source scope cues include: CITY OF SACRAMENTO CCOMWP; CITY OF SACRAMENTO Bid No; Bid Security. Bid Security is: [ ] Required [ X ] Not Required If required, bid security approved by the City must accompany the bid, in the amount of ___ % of the total am; planetbids.com/portal/portal; The City assumes that all invoices are paid within the discount terms (all discounts are taken).; Emergency/Declared Disaster Requirements.; terms and conditions that apply during non-emergency/disaster conditions.; located in the City or unincorporated county of Sacramento.; (2) Description of services billed under this invoice.; proof of an incorrect billing shall be on the Contractor.; acceptance of material, or from date of receipt of invoice, whichever is latest.; on delivery and acceptance of goods and on receipt of Contractor's invoice.; of the contract action, the Scope of Work, or any change that impacts the cost/price or schedule.; VENDOR SHALL INVOICE BASED ON THE APPROPRIATE REVISED TERM.; This project is subject to permits being obtained in order to proceed.; the City does not receive the permits, this project will be postponed until the permits are received.; date delivery is made and is accepted by the City, or the date a proper invoice is received, whichever is later.; 4253 Illinois Avenue, Fair.
BID WITH CAUTION
26 red flags detected
: LBE Participation Requirement - 5% Minimum