SHORE POWER INSTALLATION AT NCMT BERTH 24-10 AND 11

Shore Power Installation project at NCMT Berths 24-10 and 11 in National City, California. The work involves electrical construction including medium-voltage wiring, transformers, switchgear, conduit installation, grounding systems, and shore power outlet installation. This is a new construction / infrastructure project for the San Diego Unified Port District (a public agency). The project includes general construction, mobilization, demolition, earthwork, concrete pads, electrical equipment installation, testing, and commissioning. Source scope cues include: Bid Bond (Form supplied by Contractor’s Surety)*** ASTERISK NOTES: * Form must be subscribed and sworn to before Notary Public or other Officer. ** These forms shall be.

BID WITH CAUTION 9 red flags detected : SBE Sub-Participation Requirement / Good Faith Effort

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Shore Power Installation project at NCMT Berths 24-10 and 11 in National City, California. The work involves electrical construction including medium-voltage wiring, transformers, switchgear, conduit installation, grounding systems, and shore power outlet installation. This is a new construction / infrastructure project for the San Diego Unified Port District (a public agency). The project includes general construction, mobilization, demolition, earthwork, concrete pads, electrical equipment installation, testing, and commissioning. Source scope cues include: Bid Bond (Form supplied by Contractor’s Surety)*** ASTERISK NOTES: * Form must be subscribed and sworn to before Notary Public or other Officer. ** These forms shall be.

Submission deadline

2023-03-28

Red flag teaser

9 red flags detected including SBE Sub-Participation Requirement / Good Faith Effort.

Locked analysis

Full red flag list with excerpts

9 found

SBE Sub-Participation Requirement / Good Faith Effort

high

Respondent acknowledges by signing this form that it is required to complete the SBE Sub-Participation Form acknowledging their good faith effort towards SBE Sub-Participation and/or meet the goal as the prime contractor as a certified SBE (if goal is established). In the event of a discrepancy between form and totals entered on the eBid system, the District reserves the right to evaluate and waive any informalities.

Bid Bond Required

medium

…of Compliance with Americans with Disabilities Act 11. SBE Sub-Participation Form 12. SBE Sub-Participation Acknowledgement Form 13. Bid Bond (Form supplied by Contractor’s Surety)*** ASTERISK NOTES: * Form must be subscribed and sworn to before Notary Public or other Officer. ** These forms shall be filled out electronically only. *** The signature of the Surety must be acknowledged by a Notary.

Electronic Bid Takes Precedence Over Original Package

medium

In the case of a discrepancy between the electronic bid and the original Bid Proposal Package, the electronic bid will be the accepted bid.

Illegible Forms May Result in Bid Rejection

medium

These forms are designed to contain essential information concerning the Bidder and the bid, and must be legible. If any of the completed forms are illegible, the District, at its option may declare the entire bid unresponsive.

MBE/WBE/DBE Participation Requirement

medium

…ker’s Compensation 9. False Claims Certification 10. Respondent’s Certificate of Compliance with Americans with Disabilities Act 11. SBE Sub-Participation Form 12. SBE Sub-Participation Acknowledgement Form 13. Bid Bond (Form supplied by Contractor’s Surety)*** ASTERISK NOTES: * Form must be subscribed and sworn to before Notary Public or other Officer. ** These forms shall be filled out electron

Locked analysis

All deadlines table

1 dates
ItemDue
Bid Submission Deadline 2023-03-28

Locked analysis

Required certifications checklist

13 items
  • Include bid bond
  • Verify workers compensation coverage
  • Acknowledge all addenda
  • Include references or past project experience
  • Verify requirement: Americans with Disabilities Act (ADA) Compliance Certificate
  • Verify requirement: Contractor License
  • Verify requirement: False Claims Certification
  • Verify requirement: Noncollusion Affidavit

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all