← Public RFP analyses

SECURITY IMPROVEMENTS AT SHELTER ISLAND HARBOR POLICE BUILDING

This is a security improvements project at the Shelter Island Harbor Police Building in San Diego, California. The work includes selective demolition, installation of Level 6 bullet-resistant steel doors with hardware, Level 3 bullet-resistant glass-clad polycarbonate back glazing in various sizes, bullet-resistant fiberglass panels, and preparation and painting of bullet-resistant steel doors. The project is a renovation/upgrade of an existing government facility (San Diego Unified Port District) and is being procured via sealed bid (IFB). The scope is primarily carpentry and installation work with specialized security glazing and door systems. Source scope cues include: Bid Bond (Form supplied by Contractor’s Surety)*** ASTERISK NOTES: * Form must be subscribed and sworn to before Notary Public or other Officer. ** These forms shall be.

BID WITH CAUTION 8 red flags detected : Dual Submission Requirement (Electronic + Original Hard Copy)

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

This is a security improvements project at the Shelter Island Harbor Police Building in San Diego, California. The work includes selective demolition, installation of Level 6 bullet-resistant steel doors with hardware, Level 3 bullet-resistant glass-clad polycarbonate back glazing in various sizes, bullet-resistant fiberglass panels, and preparation and painting of bullet-resistant steel doors. The project is a renovation/upgrade of an existing government facility (San Diego Unified Port District) and is being procured via sealed bid (IFB). The scope is primarily carpentry and installation work with specialized security glazing and door systems. Source scope cues include: Bid Bond (Form supplied by Contractor’s Surety)*** ASTERISK NOTES: * Form must be subscribed and sworn to before Notary Public or other Officer. ** These forms shall be.

Submission deadline

2024-09-05

Red flag teaser

8 red flags detected including Dual Submission Requirement (Electronic + Original Hard Copy).

Locked analysis

Full red flag list with excerpts

8 found

Dual Submission Requirement (Electronic + Original Hard Copy)

high

BIDDERS ARE TO COMPLETE AND ATTACH THE DOCUMENTS CONTAINED IN THIS BID PROPOSAL PACKAGE AS INSTRUCTED IN SECTION 2.0 OF THIS PACKAGE, AND SUBMIT THE COMPLETED BID PROPOSAL PACKAGE IN ITS ENTIRETY ELECTRONICALLY PRIOR TO THE BID DEADLINE. BIDDER IS REQUIRED TO SUBMIT THE ORIGINAL BID PROPOSAL PACKAGE WITHIN THE TIME STATED ON THE CONTRACT DOCUMENTS COVER PAGE.

SBE Sub-Participation Requirement / Goal

high

NOTE: Respondent acknowledges by signing this form that it is required to complete the SBE Sub-Participation Form acknowledging their good faith effort towards SBE Sub-Participation and/or meet the goal as the prime contractor as a certified SBE (if goal is established).

Strict Format and Completeness Requirements / Non-Responsive Bid Risk

high

These forms are designed to contain essential information concerning the Bidder and the bid, and must be legible. If any of the completed forms are illegible, the District, at its option may declare the entire bid unresponsive.

Bid Bond Required

medium

14. Bid Bond (Form supplied by Contractor's Surety)*** ... *** The signature of the Surety must be acknowledged by a Notary.

MBE/WBE/DBE Participation Requirement

medium

…ities Act 11. Acknowledgement of the Requirements of In-Use Off-Road Diesel-Fueled Fleets and Certificate of Reported Compliance 12. SBE Sub-Participation Form 13. SBE Sub-Participation Acknowledgement Form 14. Bid Bond (Form supplied by Contractor’s Surety)*** ASTERISK NOTES: * Form must be subscribed and sworn to before Notary Public or other Officer. ** These forms shall be filled out electron

Locked analysis

All deadlines table

2 dates
ItemDue
Bid Submission Deadline 2024-09-05
Proposal Pricing Validity Period TBD

Locked analysis

Required certifications checklist

14 items
  • Include bid bond
  • Verify workers compensation coverage
  • Include references or past project experience
  • Verify requirement: Americans with Disabilities Act (ADA) Compliance Certificate
  • Verify requirement: Contractor License
  • Verify requirement: False Claims Certification
  • Verify requirement: In-Use Off-Road Diesel-Fueled Fleets Compliance Certificate
  • Verify requirement: Non-Collusion Affidavit

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all