← Public RFP analyses

Secondary Clarifier Landscape Maintenance Services

Source scope cues include: NUMBER RFP-HD-17-004 SECONDARY CLARIFIER LANDSCAPE MAINTENANCE SERVICES REGIONAL PLANT NO. 1; sealed envelope with all original; PREVAILING WAGE 2-2 I. REFERENCES 2-2 J. AWARD/SELECTION CRITERIA 2-2 K. CONTRACT AWARD 2-2 L. PUBLIC RECORD 2-2 M. ACCEPTANCE AND PAYM; sealed proposal; tasks envisioned within the scope of this Request for Proposal (RFP) may be requested.; Inland Empire Utilities Agency, 6075 “Building A’ Kimball Avenue, Chino, CA, 91708.; Wastewater Recycling Facility, located at 2662 East Walnut Street, Ontario, CA, 91761.; prevailing wage rates for the types of work to be done under the specifications.; e Payment discount proposed, in exchange for expedited invoice payment.; approval by the Project Manager, within thirty (30) days following receipt of the invoice.; trouble-free browsing and data uploading and downloading.; prompt payment of any or all invoices.; Business License number issued by the City where the Offeror's principal place of business is located.; TYPE OF SERVICES PROVIDED (Note: Please attach a “typical” invoice, for the services provided.; Secondary Clarifiers at the Inland Empire Utilities Agency’s Regional Water Recycling Plant No.; PROJECT LOCATION: RP-1is located at 2662 E Walnut Street Ontario, CA 91761.; for information on box replacements.; 6075 Kimball Avenue, Building A, Chino, California; 6075 Kimball Avenue, Building; 1 and NW.

BID WITH CAUTION 14 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: NUMBER RFP-HD-17-004 SECONDARY CLARIFIER LANDSCAPE MAINTENANCE SERVICES REGIONAL PLANT NO. 1; sealed envelope with all original; PREVAILING WAGE 2-2 I. REFERENCES 2-2 J. AWARD/SELECTION CRITERIA 2-2 K. CONTRACT AWARD 2-2 L. PUBLIC RECORD 2-2 M. ACCEPTANCE AND PAYM; sealed proposal; tasks envisioned within the scope of this Request for Proposal (RFP) may be requested.; Inland Empire Utilities Agency, 6075 “Building A’ Kimball Avenue, Chino, CA, 91708.; Wastewater Recycling Facility, located at 2662 East Walnut Street, Ontario, CA, 91761.; prevailing wage rates for the types of work to be done under the specifications.; e Payment discount proposed, in exchange for expedited invoice payment.; approval by the Project Manager, within thirty (30) days following receipt of the invoice.; trouble-free browsing and data uploading and downloading.; prompt payment of any or all invoices.; Business License number issued by the City where the Offeror's principal place of business is located.; TYPE OF SERVICES PROVIDED (Note: Please attach a “typical” invoice, for the services provided.; Secondary Clarifiers at the Inland Empire Utilities Agency’s Regional Water Recycling Plant No.; PROJECT LOCATION: RP-1is located at 2662 E Walnut Street Ontario, CA 91761.; for information on box replacements.; 6075 Kimball Avenue, Building A, Chino, California; 6075 Kimball Avenue, Building; 1 and NW.

Submission deadline

Not listed in the public preview.

Red flag teaser

14 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

14 found

Broad Indemnification

high

…performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless, Owner and Engineer, their officers, agents, and employees as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and virtue and Principal and Surety, in the event suit is br

Federal Funding Compliance (ARPA / CDBG / HUD / FEMA / 2 CFR 200)

high

Panne G8 TMELIEED W NGE-PAS OD OOM okpaeh WO) 0 on ee Suet! BARRA LOB.S @Ave SCH 40 FEMA AnWETOR &

Guaranteed Maximum Price (GMP) / Hard Budget Cap

high

Contractor's monthly invoice, for a total contract price NOT-TO-EXCEED $XX,XXX for all services satisfactorily provided during the term of this Contract.

Liquidated Damages

high

SECTION 5 - LIQUIDATED DAMAGES

Prevailing Wage / Certified Payroll

high

…BEFORE CLOSING 2-1 D. MISTAKE IN PROPOSAL 2-1 E. PROPOSAL ACCEPTANCE 2-1 F. INTERPRETATION OF DOCUMENTS 2-1 G. PROPOSAL FEES 2-1 H. PREVAILING WAGE 2-2 I. REFERENCES 2-2 J. AWARD/SELECTION CRITERIA 2-2 K. CONTRACT AWARD 2-2 L. PUBLIC RECORD 2-2 M. ACCEPTANCE AND PAYMENT 2-2 N. INSURANCE 2-3 O. CONTRACT EXECUTION(S) / EXCEPTIONS 2-3 P. DIR COMPLIANCE — PUBLIC WORKS PROJECT 2-3 Q. ENVIRONMENTAL PUR

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

19 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda
  • Include references or past project experience

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all