SAND REPLENISHMENT AT KELLOGG BEACH FY 2025

Sand replenishment project at Kellogg Beach in San Diego, California, managed by the San Diego Unified Port District. The work involves placement of approximately 1,600 cubic yards of washed natural sand fill, implementation of Best Management Practices (BMP) including silt curtain use, installation of a pole-mounted live-streaming webcam for construction documentation, and post-construction topographic survey. This is a repair/maintenance project for a public waterfront facility. Source scope cues include: Bid Bond (Form supplied by Contractor’s Surety)*** ASTERISK NOTES: * Form must be subscribed and sworn to before Notary Public or other Officer. ** These forms shall be.

BID WITH CAUTION 9 red flags detected : SBE Sub-Participation Requirement / Good Faith Effort

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Sand replenishment project at Kellogg Beach in San Diego, California, managed by the San Diego Unified Port District. The work involves placement of approximately 1,600 cubic yards of washed natural sand fill, implementation of Best Management Practices (BMP) including silt curtain use, installation of a pole-mounted live-streaming webcam for construction documentation, and post-construction topographic survey. This is a repair/maintenance project for a public waterfront facility. Source scope cues include: Bid Bond (Form supplied by Contractor’s Surety)*** ASTERISK NOTES: * Form must be subscribed and sworn to before Notary Public or other Officer. ** These forms shall be.

Submission deadline

2025-04-10

Red flag teaser

9 red flags detected including SBE Sub-Participation Requirement / Good Faith Effort.

Locked analysis

Full red flag list with excerpts

9 found

SBE Sub-Participation Requirement / Good Faith Effort

high

NOTE: Respondent acknowledges by signing this form that it is required to complete the SBE Sub-Participation Form acknowledging their good faith effort towards SBE Sub-Participation and/or meet the goal as the prime contractor as a certified SBE (if goal is established).

Bid Bond Required

medium

14. Bid Bond (Form supplied by Contractor's Surety)*** ... *** The signature of the Surety must be acknowledged by a Notary.

Bids with Zero or Negative Unit Prices Deemed Non-Responsive

medium

Bids will be determined non-responsive if the values for unit prices and/or lump sum prices and/or totals are equal to or less than zero dollars ($0).

Conditional Proposals Not Accepted

medium

No conditional proposals will be accepted.

Electronic Bid Takes Precedence Over Original Package

medium

In the case of a discrepancy between the electronic bid and the original Bid Proposal Package, the electronic bid will be the accepted bid.

Locked analysis

All deadlines table

2 dates
ItemDue
Bid Submission Deadline 2025-04-10
Bid Validity Period TBD

Locked analysis

Required certifications checklist

14 items
  • Include bid bond
  • Verify workers compensation coverage
  • Include references or past project experience
  • Verify requirement: Americans with Disabilities Act (ADA) Compliance Certificate
  • Verify requirement: Contractor License
  • Verify requirement: False Claims Certification
  • Verify requirement: In-Use Off-Road Diesel-Fueled Fleets Compliance Certificate
  • Verify requirement: Non-Collusion Affidavit

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all