San Diego Canal Radial Gates Rehabilitation

Source scope cues include: City of Los Angeles; Holes for placement of the grout shall be located so grout does not travel more than 48 inches.; Defects shall be removed and repaired before the next pass.; element is located and fastened within the required tolerances.; the same manner as for a repair of a weld specified in AWS D1.; and the surface shall be repaired as specified in Section 03300, Cast-in-Place Concrete.; Galvanized surfaces shall be repaired in accordance with Section 05500.; the bare edges re-galvanized and the galvanized coating adjacent to such die-punched edges need not be repaired.; structural, architectural, mechanical, or electrical – shall be as shown on the drawings.; The method of repair of damaged areas shall be as authorized by the Engineer.; 98 percent zinc shall be used in repairing by the metallizing process.; smooth where required, and repaired with hot bar zinc.; There shall be no irregularities that prevent a uniformly sealed closure.; including openings and spaces between rails and located so as to produce the maximum load effect.; tarpaulin, or polyethylene sheeting in a manner that will permit circulation of air inside the covering.; Internal mechanical connection splices shall be of extruded aluminum.; By mitering, hairline mechanical joints where detailed.; Houston; mechanical contractors; Electrical Contractors.

BID WITH CAUTION 8 red flags detected : Hazardous Material / Abatement Coordination

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Los Angeles; Holes for placement of the grout shall be located so grout does not travel more than 48 inches.; Defects shall be removed and repaired before the next pass.; element is located and fastened within the required tolerances.; the same manner as for a repair of a weld specified in AWS D1.; and the surface shall be repaired as specified in Section 03300, Cast-in-Place Concrete.; Galvanized surfaces shall be repaired in accordance with Section 05500.; the bare edges re-galvanized and the galvanized coating adjacent to such die-punched edges need not be repaired.; structural, architectural, mechanical, or electrical – shall be as shown on the drawings.; The method of repair of damaged areas shall be as authorized by the Engineer.; 98 percent zinc shall be used in repairing by the metallizing process.; smooth where required, and repaired with hot bar zinc.; There shall be no irregularities that prevent a uniformly sealed closure.; including openings and spaces between rails and located so as to produce the maximum load effect.; tarpaulin, or polyethylene sheeting in a manner that will permit circulation of air inside the covering.; Internal mechanical connection splices shall be of extruded aluminum.; By mitering, hairline mechanical joints where detailed.; Houston; mechanical contractors; Electrical Contractors.

Submission deadline

Not listed in the public preview.

Red flag teaser

8 red flags detected including Hazardous Material / Abatement Coordination.

Locked analysis

Full red flag list with excerpts

8 found

Hazardous Material / Abatement Coordination

high

…Action 24. Inspection 60. Differing or Unusual Site Conditions 25. Examination of Work 61. Hazardous Substance, Hazardous Waste, or Asbestos- 26. Defective Work or Material Related Work 27. Right of Property in Materials 62. Hazardous Material 28. Title to Materials Found on the Work 63. Hazardous Waste 29. Access to Work 64. Insurance 30. Liquidated Damages 65. Payrolls and Records 31. Patents a

Liquidated Damages

high

…n Materials 62. Hazardous Material 28. Title to Materials Found on the Work 63. Hazardous Waste 29. Access to Work 64. Insurance 30. Liquidated Damages 65. Payrolls and Records 31. Patents and Copyrights 66. Non-Use of Intellectual Property of Third Parties 32. No Payment for Temporary or Preliminary Works 67. Prohibited Relationships with Sanctioned Countries 33. Partial Estimates and Persons 34

No Material Substitutions Without Owner Approval

high

…el roller bearings and double locking snap. 3. Ladder cages are not permissible as a means of fall prevention for fixed ladders, and shall not substitute for fall prevention system. Ladder cages may be used along with the fall prevention system directly over the floor or platform as shown on the drawings. 4. All fall prevention system components shall come from the same manufacturer. 5. Acceptabl

Background Check / Drug Testing Requirement

medium

…respass Completion 50. Character of Workers 14. Termination of Contract for Convenience 51. Employment of Labor 15. Right-of-Way 52. Substance Abuse Policy 16. Obligations of Contractor 53. Safety and Protection 17. Personal Attention 54. Laws and Regulations 18. Protest and Claims Procedure 55. Employment of Indentured Apprentices 19. Contractor's Responsibilities for Losses or Liabilities 56. S

Payment Bond Required

medium

…ntion Training Certification CONTRACT ADMINISTRATION FORMS 00505 — Agreement 00520 — Escrow Agreement for Security Deposits in Lieu of Retention 00610 — Bond for Faithful Performance 00620 — Payment Bond 00660 — Workers' Compensation Insurance Certification CONDITIONS OF THE CONTRACT 00700 — General Conditions 00800 — Supplementary General Conditions MS May 3, 2024 -1- 2130 (construction contract

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

8 items
  • Include payment bond
  • Verify workers compensation coverage
  • Include references or past project experience
  • Include subcontractor list if required
  • Include safety documents if required
  • Verify requirement: Workers Compensation Insurance
  • Resolve before bid: Liquidated Damages
  • Resolve before bid: Payment Bond Required

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all