Back-Charge / Setoff Rights
high
…ges, invoiced fee or other debt which is owed, or which becomes owed, by Contractor to City, City reserves the right to withhold and offset said amounts from any payments, refunds or reimbursements owed by City to Contractor under the Contract. Notice of such withholding and offset shall promptly be given to Contractor by City in writing. In the event of a dispute as to the amount owed or whether
Broad Indemnification
high
…is hereby relieved at all times from any indebtedness or claim other than payments under terms of the Contract. The Contractor will indemnify and hold harmless the City and its officers and employees from any loss, demand, damages, claims or actions arising from or in connection with said indebtedness. 2-3 SUBCONTRACTS 2-3.2 Self Performance. The Contractor shall perform, with its own organizatio
Hazardous Material / Abatement Coordination
high
…wastes from paints, stains, sealants, solvents, detergents, glues, lime, pesticides, herbicides, fertilizers, wood preservatives and asbestos fibers; paint flakes or stucco fragments; fuels, oils, lubricants and hydraulic, radiator or battery fluids; concrete and related cutting or curing residues; floatable wastes; wastes from engine/equipment steam cleaning or chemical degreasing; wastes from s
HIPAA / Healthcare Data Privacy Compliance
high
1111....666699995555 Material Unit Weight Strength Cohesion Phi Color Name (lbs/ft3) Type (psf) (deg) Silty Mohr‐ Sand 115 0 34 Coulomb (SM) Concrete 150 Undrained 15000 0 10 20 30 40 50 60 70 80 90 100 Project City-wide Street, Storm Drain and Sewer Improvements Group Group 1 Scenario Static Drawn By Zahangir Alam Company Converse Consultants Date 11/9/2021 File Name RW.slmd SLIDEINTERPRET 9.008…
Liquidated Damages
high
…ty to accommodate another contract, even with the City. For each incident the Contractor does not submit an updated weekly schedule, liquidated damages will be assessed as described in Section 6-9 of these Special Provisions. The Contractor’s construction schedule shall be submitted at the Pre-Construction Conference. Upon review of the Contractor's construction schedule by the Engineer, a "Notic