Broad Indemnification
high
…shall faithfully perform the covenants, conditions and agreements in the Contract and any changes made as therein provided and shall indemnify and save harmless IEUA, its officers and agents as therein stipulated, then this obligation shall become null and void; otherwise, it shall remain in full force and virtue, and Principal and Surety, in the event suit is brought on this bond, will pay to IE
Hazardous Material / Abatement Coordination
high
…perating conditions. b. Unless otherwise indicated, lantern rings shall be bronze, packing shall be die- molded packing rings of non-asbestos material suitable for the intended service and as recommended by the manufacturer, and glands shall be bronze, two piece split construction. Lantern rings shall be of two-piece construction and shall be provided with tapped holes to facilitate removal. Lant
No Material Substitutions Without Owner Approval
high
…hermal mass flow meters shall be Fluid Components LLC Model ST98 with a Vortab Model VIP flow conditioner (if shown on data sheets). No substitutions. G. Installation. The thermal mass flow meters and flow conditions shall be installed and located per the manufacturer recommendations to ensure accurate measurement and operation. 2.05 VENTURI METERS A. General 1. Basic Design: The meter differenti
Prevailing Wage / Certified Payroll
high
…R shall be responsible to comply with all grant requirements related to the Project. These may include, but shall not be limited to: Davis- Bacon Act, Endangered Species Act, Executive Order 11246 (Affirmative Action Requirements), Equal Opportunity, Competitive Solicitation, Record Retention and Public Access to Records, and Compliance Review. Please see attachment for grant funded requirements.
Sensitive Tenant Work Requires After-Hours Installation and Personnel Notice
high
…UIPMENT SUPPLIER on account of said equipment or services to be furnished as a result of this Request for Proposals, and that may be secured by any lien or stop payment notice against IEUA. 2.19 EQUIPMENT SUPPLIER SUBMITTALS During the design phase and prior to the start of equipment fabrication, the EQUIPMENT SUPPLIER shall submit satisfactory shop drawings to IEUA/ENGINEER for review and obtain