RP-5 IPS #3 Guide Rail Repair

Source scope cues include: city of Chino and has; sealed envelope with all the original; PREVAILING WAGE ------------------------------------------------------------------------------------------------ 5 O. INDEMNIFICATION; sealed proposal; Work hours otherwise stated in SECTION 3 – SCOPE OF WORK.; work given by Inland Empire Utilities Agency.; BID LABELING: The bid shall be submitted in a sealed envelope with all the original pages intact.; RP-5 IPS #3 Guide Rail Repair, Project No.; until such services are repaired or corrected, and accepted, by the Project Manager.; contract issued in conjunction with this solicitation will be subject to prevailing wage.; itemize/detail components of proposed prices and/or invoices; i.; DESCRIPTION: The Inland Empire Utilities Agency (IEUA), Regional Water Recycling Plant No.; (RP-5) is located in the city of Chino and has been in operation since 2004 (Attachment A).; Permits issued by the jurisdictional regulatory agencies, if applicable.; Emergency Construction Services the Agreement takes precedence above the below items.; 6075 Kimball Ave; 6075 Kimball Ave, Building B., Chino CA.

BID WITH CAUTION 8 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: city of Chino and has; sealed envelope with all the original; PREVAILING WAGE ------------------------------------------------------------------------------------------------ 5 O. INDEMNIFICATION; sealed proposal; Work hours otherwise stated in SECTION 3 – SCOPE OF WORK.; work given by Inland Empire Utilities Agency.; BID LABELING: The bid shall be submitted in a sealed envelope with all the original pages intact.; RP-5 IPS #3 Guide Rail Repair, Project No.; until such services are repaired or corrected, and accepted, by the Project Manager.; contract issued in conjunction with this solicitation will be subject to prevailing wage.; itemize/detail components of proposed prices and/or invoices; i.; DESCRIPTION: The Inland Empire Utilities Agency (IEUA), Regional Water Recycling Plant No.; (RP-5) is located in the city of Chino and has been in operation since 2004 (Attachment A).; Permits issued by the jurisdictional regulatory agencies, if applicable.; Emergency Construction Services the Agreement takes precedence above the below items.; 6075 Kimball Ave; 6075 Kimball Ave, Building B., Chino CA.

Submission deadline

2019-10-15

Red flag teaser

8 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

8 found

Broad Indemnification

high

…--------- 5 N. PREVAILING WAGE ------------------------------------------------------------------------------------------------ 5 O. INDEMNIFICATION ------------------------------------------------------------------------------------------------- 5 P. STANDARD SPECIFICATION FOR PUBLIC WORKS CONSTRUCTION -------------------------------- 6 Q. AWARD / SELECTION CRITERIA -----------------------------

Liquidated Damages

high

…-- 6 R. BID PRICE-------------------------------------------------------------------------------------------------------------- 6 S. LIQUIDATED DAMAGES ------------------------------------------------------------------------------------------ 6 T. FORCE ACCOUNT WORK ----------------------------------------------------------------------------------------- 6 SECTION 3 - SCOPE OF WORK ..............

Prevailing Wage / Certified Payroll

high

…----------------------------------------- 5 M. EQUAL EMPLOYMENT OPPORTUNITY AND HARASSMENT PROHIBITION ------------------------ 5 N. PREVAILING WAGE ------------------------------------------------------------------------------------------------ 5 O. INDEMNIFICATION ------------------------------------------------------------------------------------------------- 5 P. STANDARD SPECIFICATION FOR PU

Bid Bond Required

medium

…icates within said time, his bid guarantee, if furnished, shall be returned to him within five (5) calendar days thereafter, and the bid bond, if furnished, shall become void. The bidder acknowledges and understands that a waiting period from time of bid opening until award may be ninety (90) calendar days during which bidder may not withdraw his bid. The bidder further acknowledges that he has a

High Insurance Limits Required

medium

…cluding products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $1,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit. 2. Automobile Lia

Locked analysis

All deadlines table

1 dates
ItemDue
PRE-BID MEETING and JOB-WALK 2019-10-15

Locked analysis

Required certifications checklist

23 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →