RP-5 Facility Parking Enhancements

Source scope cues include: City of Los Angeles; sealed envelope with all the original; PREVAILING WAGE ------------------------------------------------------------------------------------------------------ 6 O. INDEMNIFICA; sealed proposal; work given by Inland Empire Utilities Agency.; INQUIRIES: Technical inquiries regarding this solicitation should be directed to PlanetBids.; BID LABELING: The bid shall be submitted in a sealed envelope with all the original pages intact.; until such services are repaired or corrected, and accepted, by the Project Manager.; contract issued in conjunction with this solicitation will be subject to prevailing wage.; itemize/detail components of proposed prices and/or invoices; i.; The work is located at 6075 Kimball Ave.; Permits issued by the jurisdictional regulatory agencies, if applicable.; licensed by the State of California.; Protect adjacent existing utilities, pipelines, structures, and improvements.; mechanically compacted to the indicated percentage of maximum dry density.; asphalt base repairs and pavement milling.; Cracks shall be sealed from the bottom up.; 6075 Kimball Avenue, Building; 6075 Kimball Ave, Chino, CA; 6075 Kimball Ave.

BID WITH CAUTION 10 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Los Angeles; sealed envelope with all the original; PREVAILING WAGE ------------------------------------------------------------------------------------------------------ 6 O. INDEMNIFICA; sealed proposal; work given by Inland Empire Utilities Agency.; INQUIRIES: Technical inquiries regarding this solicitation should be directed to PlanetBids.; BID LABELING: The bid shall be submitted in a sealed envelope with all the original pages intact.; until such services are repaired or corrected, and accepted, by the Project Manager.; contract issued in conjunction with this solicitation will be subject to prevailing wage.; itemize/detail components of proposed prices and/or invoices; i.; The work is located at 6075 Kimball Ave.; Permits issued by the jurisdictional regulatory agencies, if applicable.; licensed by the State of California.; Protect adjacent existing utilities, pipelines, structures, and improvements.; mechanically compacted to the indicated percentage of maximum dry density.; asphalt base repairs and pavement milling.; Cracks shall be sealed from the bottom up.; 6075 Kimball Avenue, Building; 6075 Kimball Ave, Chino, CA; 6075 Kimball Ave.

Submission deadline

2018-05-02

Red flag teaser

10 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

10 found

Broad Indemnification

high

…--- 6 N. PREVAILING WAGE ------------------------------------------------------------------------------------------------------ 6 O. INDEMNIFICATION ------------------------------------------------------------------------------------------------------- 6 P. STANDARD SPECIFICATION FOR PUBLIC WORKS CONSTRUCTION ------------------------------------ 7 Q. AWARD / SELECTION CRITERIA -------------------

Liquidated Damages

high

…BID PRICE -------------------------------------------------------------------------------------------------------------------- 7 S. LIQUIDATED DAMAGES ------------------------------------------------------------------------------------------------ 7 T. FORCE ACCOUNT WORK ----------------------------------------------------------------------------------------------- 8 SECTION 3 - SCOPE OF WORK ...

Mandatory Pre-Bid / Pre-Proposal Meeting

high

…timate as they prepare costs for this work. ENGINEERS ESTIMATE of PROBABLE COST = Not Estimated C. PRE-BID and JOB-WALK MEETING: Non-Mandatory PRE-BID MEETING and JOB-WALK: Wednesday, May 2, 2018 at 10:00 A.M. 6075 Kimball Ave, Chino, CA 91708 Building “B” Lobby D. SUBMITTAL LOCATION, CLOSING DATE, AND TIME: Bids will not be accepted after the "closing" date and time indicated. Faxed or emailed b

Prevailing Wage / Certified Payroll

high

…-------------------------------------- 6 M. EQUAL EMPLOYMENT OPPORTUNITY AND HARASSMENT PROHIBITION --------------------------- 6 N. PREVAILING WAGE ------------------------------------------------------------------------------------------------------ 6 O. INDEMNIFICATION ------------------------------------------------------------------------------------------------------- 6 P. STANDARD SPECIFIC

Bid Bond Required

medium

…icates within said time, his bid guarantee, if furnished, shall be returned to him within five (5) calendar days thereafter, and the bid bond, if furnished, shall become void. The bidder acknowledges and understands that a waiting period from time of bid opening until award may be ninety (90) calendar days during which bidder may not withdraw his bid. The bidder further acknowledges that he has a

Locked analysis

All deadlines table

1 dates
ItemDue
PRE-BID MEETING and JOB-WALK: Wednesday, 2018-05-02

Locked analysis

Required certifications checklist

23 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all