← Public RFP analyses

RP-1 Secondary Clarifier Landscape Maintenance

Source scope cues include: NUMBER RFP-HD-19-006 SECONDARY CLARIFIER LANDSCAPE MAINTENANCE SERVICES REGIONAL PLANT NO. 1; sealed envelope with all original; PREVAILING WAGE 2-2 I. REFERENCES 2-2 J. AWARD/SELECTION CRITERIA 2-2 K. CONTRACT AWARD 2-2 L. PUBLIC RECORD 2-2 M. ACCEPTANCE AND PAYM; sealed proposal; scope of this Request for Proposal (RFP) may be requested.; « Payment discount proposed, in exchange for expedited invoice payment.; within thirty (30) days following receipt of the invoice.; prompt payment of any or all invoices.; Business License number issued by the City where the Offeror's principal place of business is located.; TYPE OF SERVICES PROVIDED (Note: Please attach a “typical” invoice, for the services provided.; Empire Utilities Agency, its officers, employees, agents, representatives, and volunteers.; Clarifiers at the Inland Empire Utilities Agency’s Regional Water Recycling Plant No.; PROJECT LOCATION: RP-1 is located at 2662 E Walnut Street Ontario, CA 91761.; mechanically compacted and sloped as possible for positive drainage.; the Project Manager within thirty (30) days following receipt of the invoice.; Invoices shall include Contract Number { ).; 6075 Kimball Avenue, Building A, Chino, California; 6075 Kimball Avenue, Building; 1 and NW.

BID WITH CAUTION 13 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: NUMBER RFP-HD-19-006 SECONDARY CLARIFIER LANDSCAPE MAINTENANCE SERVICES REGIONAL PLANT NO. 1; sealed envelope with all original; PREVAILING WAGE 2-2 I. REFERENCES 2-2 J. AWARD/SELECTION CRITERIA 2-2 K. CONTRACT AWARD 2-2 L. PUBLIC RECORD 2-2 M. ACCEPTANCE AND PAYM; sealed proposal; scope of this Request for Proposal (RFP) may be requested.; « Payment discount proposed, in exchange for expedited invoice payment.; within thirty (30) days following receipt of the invoice.; prompt payment of any or all invoices.; Business License number issued by the City where the Offeror's principal place of business is located.; TYPE OF SERVICES PROVIDED (Note: Please attach a “typical” invoice, for the services provided.; Empire Utilities Agency, its officers, employees, agents, representatives, and volunteers.; Clarifiers at the Inland Empire Utilities Agency’s Regional Water Recycling Plant No.; PROJECT LOCATION: RP-1 is located at 2662 E Walnut Street Ontario, CA 91761.; mechanically compacted and sloped as possible for positive drainage.; the Project Manager within thirty (30) days following receipt of the invoice.; Invoices shall include Contract Number { ).; 6075 Kimball Avenue, Building A, Chino, California; 6075 Kimball Avenue, Building; 1 and NW.

Submission deadline

Not listed in the public preview.

Red flag teaser

13 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

13 found

Broad Indemnification

high

…performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless, Owner and Engineer, their officers, agents, and employees as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and virtue and Principal and Surety, in the event suit is br

Liquidated Damages

high

SCOPE OF WORK 4-1 GENERAL NOTES 41 SITE PREPARATION 4-4 GEOTEXTILE FABRIC 45 IRRIGATION WORK 46 PLANTING 4-7 PLANTING METHODS. 49 GROUNDCOVER MATERIALS 4-10 CONCLUSION 4-11 AS-BUILT DRAWINGS 4-12 GUARANTEE 4-12 SECTION 5 - LIQUIDATED DAMAGES 5-1 SECTION 6 - EXAMPLE CONTRACT 6-1

Prevailing Wage / Certified Payroll

high

…BEFORE CLOSING 2-1 Dd. MISTAKE IN PROPOSAL 2-1 E. PROPOSAL ACCEPTANCE 2-1 F. INTERPRETATION OF DOCUMENTS 2-1 G. PROPOSAL FEES 2-1 H. PREVAILING WAGE 2-2 I. REFERENCES 2-2 J. AWARD/SELECTION CRITERIA 2-2 K. CONTRACT AWARD 2-2 L. PUBLIC RECORD 2-2 M. ACCEPTANCE AND PAYMENT 2-2 N. INSURANCE 2-3 O. CONTRACT EXECUTION(S) / EXCEPTIONS 2-3 P. DIR COMPLIANCE — PUBLIC WORKS PROJECT 2-3 Q. ENVIRONMENTAL PU

Bid Bond Required

medium

BID BOND

High Insurance Limits Required

medium

…currence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $1,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

18 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda
  • Include references or past project experience

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all