← Public RFP analyses

RP-1 Secondary Clarifier Landscape Improvement Project

Source scope cues include: NUMBER RFP-HD-17-003 SECONDARY CLARIFIER LANDSCAPE IMPROVEMENTS PROJECT SERVICES REGIONAL PLANT NO. 1; PREVAILING WAGE 2-2 im REFERENCES 2-2 J. AWARD/SELECTION CRITERIA 2-2 K. CONTRACT AWARD 2-2 L. PUBLIC RECORD 2-2 M. ACCEPTANCE AND PAYM; sealed proposal; tasks envisioned within the scope of this Request for Proposal (RFP) may be requested.; Inland Empire Utilities Agency, 6075 “A” Kimball Avenue, Chino, CA, 91708.; Recycling Facility, located at 2662 East Walnut Street, Ontario, CA, 91761.; prevailing wage rates for the types of work to be done under the specifications.; e Payment discount proposed, in exchange for expedited invoice payment.; approval by the Project Manager, within thirty (30) days following receipt of the invoice.; trouble-free browsing and data uploading and downloading.; prompt payment of any or all invoices.; Business License number issued by the City where the Offeror's principal place of business is located.; TYPE OF SERVICES PROVIDED (Note: Please attach a “typical” invoice, for the services provided.; B, PROJECT LOCATION: RP-1is located at 2662 E Walnut Street Ontario, CA 91761.; Project area is within the Inland Empire Utilities Agency’s Regional Water Recycling Plant No.; for information on box replacements.; mechanical vibrating plate or similar prior to eventual placement of fabric.; 6075 Kimball Avenue, Building A, Chino, California; 6075 Kimball Avenue, Building; 1 and NW.

BID WITH CAUTION 13 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: NUMBER RFP-HD-17-003 SECONDARY CLARIFIER LANDSCAPE IMPROVEMENTS PROJECT SERVICES REGIONAL PLANT NO. 1; PREVAILING WAGE 2-2 im REFERENCES 2-2 J. AWARD/SELECTION CRITERIA 2-2 K. CONTRACT AWARD 2-2 L. PUBLIC RECORD 2-2 M. ACCEPTANCE AND PAYM; sealed proposal; tasks envisioned within the scope of this Request for Proposal (RFP) may be requested.; Inland Empire Utilities Agency, 6075 “A” Kimball Avenue, Chino, CA, 91708.; Recycling Facility, located at 2662 East Walnut Street, Ontario, CA, 91761.; prevailing wage rates for the types of work to be done under the specifications.; e Payment discount proposed, in exchange for expedited invoice payment.; approval by the Project Manager, within thirty (30) days following receipt of the invoice.; trouble-free browsing and data uploading and downloading.; prompt payment of any or all invoices.; Business License number issued by the City where the Offeror's principal place of business is located.; TYPE OF SERVICES PROVIDED (Note: Please attach a “typical” invoice, for the services provided.; B, PROJECT LOCATION: RP-1is located at 2662 E Walnut Street Ontario, CA 91761.; Project area is within the Inland Empire Utilities Agency’s Regional Water Recycling Plant No.; for information on box replacements.; mechanical vibrating plate or similar prior to eventual placement of fabric.; 6075 Kimball Avenue, Building A, Chino, California; 6075 Kimball Avenue, Building; 1 and NW.

Submission deadline

Not listed in the public preview.

Red flag teaser

13 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

13 found

Broad Indemnification

high

…performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless, Owner and Engineer, their officers, agents, and employees as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and virtue and Principal and Surety, in the event suit is br

Liquidated Damages

high

(Follows Page 4-1, Pages 1 through 11) SECTION 5 - LIQUIDATED DAMAGES

Prevailing Wage / Certified Payroll

high

…BEFORE CLOSING 2-1 D. MISTAKE IN PROPOSAL 2-1 E. PROPOSAL ACCEPTANCE 2-1 F. INTERPRETATION OF DOCUMENTS 2-1 G. PROPOSAL FEES 2-1 H. PREVAILING WAGE 2-2 im REFERENCES 2-2 J. AWARD/SELECTION CRITERIA 2-2 K. CONTRACT AWARD 2-2 L. PUBLIC RECORD 2-2 M. ACCEPTANCE AND PAYMENT 2-2 N. INSURANCE 2-3 oO. CONTRACT EXECUTION(S) / EXCEPTIONS 2-3 P. DIR COMPLIANCE — PUBLIC WORKS PROJECT 2-3 Q. ENVIRONMENTAL PU

Project Labor Agreement / Union Requirements

high

Travel and Subsistence Pay: The Contractor shall make payment to each worker for travel and subsistence payments which are needed to complete the work and/or service, as such travel and subsistence payments are defined in an applicable collective bargaining agreements with the worker.

Bid Bond Required

medium

BID BOND

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

18 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda
  • Include references or past project experience

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all