RP-1 Maintenance Building HVAC Replacement, Project EN18040

Source scope cues include: NUMBER RFP-RW-17-036 RP-1 MAINTENANCE BUILDING HVAC REPLACMENT PROJECT NO. EN18040 December 5, 2017; RP-1 MAINTENANCE BUILDING HVAC REPLACMENT PROJECT NO. EN18040; City of Rancho Cucamonga; City of Ontario; sealed envelope with all the original; PREVAILING WAGE 2-3 P. INDEMNIFICATION 2-3 Q. AWARD/SELECTION CRITERIA 2-4 R. PROPOSAL PRICE 2-4 S. REFERENCES 2-4 T. LIQUIDATED DAMAGE; sealed proposal; to the evaporative coolers located on the roof of the Maintenance Building.; work given by the Inland Empire Utilities Agency.; Project Manager, within thirty (30) days following receipt of the invoice.; contract issued in conjunction with this solicitation will be subject to prevailing wage.; Schedule located within this document on page 4-1.; assessed by IEUA will be taken as a direct credit against the Contractor’s invoice for this project.; 1 (RP-1), located in the City of Ontario; Regional Plant No.; 5 (RP-5) Phase I, located in the City of Chino.; critical conditions and require immediate attention and replacement.; and design (as needed), startup and testing of eight (8) new HVAC units RP-1 Maintenance Bldg.; Evaluate roof access at all locations to ensure CAL-OSHA compliance.; the roof and provide necessary water proof sealing.; Replace all evaporative cooling unit conduit support hangers on the roof.; 12645 Sixth Street, Rancho Cucamonga, California.

BID WITH CAUTION 15 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: NUMBER RFP-RW-17-036 RP-1 MAINTENANCE BUILDING HVAC REPLACMENT PROJECT NO. EN18040 December 5, 2017; RP-1 MAINTENANCE BUILDING HVAC REPLACMENT PROJECT NO. EN18040; City of Rancho Cucamonga; City of Ontario; sealed envelope with all the original; PREVAILING WAGE 2-3 P. INDEMNIFICATION 2-3 Q. AWARD/SELECTION CRITERIA 2-4 R. PROPOSAL PRICE 2-4 S. REFERENCES 2-4 T. LIQUIDATED DAMAGE; sealed proposal; to the evaporative coolers located on the roof of the Maintenance Building.; work given by the Inland Empire Utilities Agency.; Project Manager, within thirty (30) days following receipt of the invoice.; contract issued in conjunction with this solicitation will be subject to prevailing wage.; Schedule located within this document on page 4-1.; assessed by IEUA will be taken as a direct credit against the Contractor’s invoice for this project.; 1 (RP-1), located in the City of Ontario; Regional Plant No.; 5 (RP-5) Phase I, located in the City of Chino.; critical conditions and require immediate attention and replacement.; and design (as needed), startup and testing of eight (8) new HVAC units RP-1 Maintenance Bldg.; Evaluate roof access at all locations to ensure CAL-OSHA compliance.; the roof and provide necessary water proof sealing.; Replace all evaporative cooling unit conduit support hangers on the roof.; 12645 Sixth Street, Rancho Cucamonga, California.

Submission deadline

2017-12-05

Red flag teaser

15 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

15 found

Broad Indemnification

high

…LIENS 2-2 M. FEDERAL, STATE & LOCAL LAWS 2-3 N. EQUAL EMPLOYMENT OPPORTUNITY & HARRASSMENT PROHIBITION 2-3 O. PREVAILING WAGE 2-3 P. INDEMNIFICATION 2-3 Q. AWARD/SELECTION CRITERIA 2-4 R. PROPOSAL PRICE 2-4 S. REFERENCES 2-4 T. LIQUIDATED DAMAGES 2-5 U. BACKGROUND INFORMATION 2-5 V. ENVOIRNMENTAL PURCHASING POLICY 2-6 SECTION 3 - TECHNICAL PROVISIONS 3-1 A. PROJECT BACKGROUND/REQUIREMENTS 3-1 B.

Guaranteed Maximum Price (GMP) / Hard Budget Cap

high

…shall pay Contractor, on a firm fixed price … alternatively (fixed price level-of-effort or time and materials) basis, a total price not-to-exceed $ XXXXXX for all work/ services/products satisfactorily provided hereunder. 7. LIQUIDATED DAMAGES: Liquidated damages, in the amount of $2,000 (to be determined and/or negotiated) per calendar day, shall apply for each full day that the Contractor’s co

Liquidated Damages

high

…NT PROHIBITION 2-3 O. PREVAILING WAGE 2-3 P. INDEMNIFICATION 2-3 Q. AWARD/SELECTION CRITERIA 2-4 R. PROPOSAL PRICE 2-4 S. REFERENCES 2-4 T. LIQUIDATED DAMAGES 2-5 U. BACKGROUND INFORMATION 2-5 V. ENVOIRNMENTAL PURCHASING POLICY 2-6 SECTION 3 - TECHNICAL PROVISIONS 3-1 A. PROJECT BACKGROUND/REQUIREMENTS 3-1 B. PROJECT DESCRIPTION 3-1 C. SCOPE OF WORK 3-1 D. SUBMITTALS 3-4 E. ORDER OF PRECEDENCE 3-

Prevailing Wage / Certified Payroll

high

…NCE AND PAYMENT 2-2 L. LIENS 2-2 M. FEDERAL, STATE & LOCAL LAWS 2-3 N. EQUAL EMPLOYMENT OPPORTUNITY & HARRASSMENT PROHIBITION 2-3 O. PREVAILING WAGE 2-3 P. INDEMNIFICATION 2-3 Q. AWARD/SELECTION CRITERIA 2-4 R. PROPOSAL PRICE 2-4 S. REFERENCES 2-4 T. LIQUIDATED DAMAGES 2-5 U. BACKGROUND INFORMATION 2-5 V. ENVOIRNMENTAL PURCHASING POLICY 2-6 SECTION 3 - TECHNICAL PROVISIONS 3-1 A. PROJECT BACKGROU

Bid Bond Required

medium

Bond Number BID BOND KNOW ALL MEN BY THESE PRESENTS, That __________________________________________ , as Principal and ___________________________________________ , as Surety are held and firmly bound unto the Inland Empire Utilities Agency, a Municipal Water District hereinafter designated as " IEUA ", in the sum of dollars, (not less than ten (10) percent of the total amount of the bid) for the

Locked analysis

All deadlines table

5 dates
ItemDue
Project Completion 2017-12-05
Project Completion 2017-12-12
Project Completion 2018-01-09
Project Award 2018-02-28
Project Award 2018-03-14

Locked analysis

Required certifications checklist

21 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all