← Public RFP analyses

ROOF REMOVAL AND REPLACEMENT AT MAGNOLIA PLACE SHOPPING CENTER

Source scope cues include: City of Riverside; City of Riverside Building and; acting within the scope of their particular duties.; NOTE: The scope of work will take place in and around a fully operational Shopping Center.; NO HARD COPY BIDS WILL BE ACCEPTED.; telephone number of an agent located in the State of California who is authorized to act for the bonding company.; 1) Permits from other agencies may be required by law.; architect, proper agency or department in order to obtain approval and/or proper permits.; cost, permits and insurance required of the Contractor by other agencies and organizations.; Material charges shall be substantiated by valid copies of vendors’ invoices.; utilities which will be required for this project.; due to the Contractor's operations shall be repaired immediately and at the Contractor's expense.; 10530 Magnolia Avenue, Riverside CA; 10560 Magnolia Avenue, Riverside, CA; 3900 Main Street; Roofing Contractor; Roofing Contractors.

BID WITH CAUTION 13 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Riverside; City of Riverside Building and; acting within the scope of their particular duties.; NOTE: The scope of work will take place in and around a fully operational Shopping Center.; NO HARD COPY BIDS WILL BE ACCEPTED.; telephone number of an agent located in the State of California who is authorized to act for the bonding company.; 1) Permits from other agencies may be required by law.; architect, proper agency or department in order to obtain approval and/or proper permits.; cost, permits and insurance required of the Contractor by other agencies and organizations.; Material charges shall be substantiated by valid copies of vendors’ invoices.; utilities which will be required for this project.; due to the Contractor's operations shall be repaired immediately and at the Contractor's expense.; 10530 Magnolia Avenue, Riverside CA; 10560 Magnolia Avenue, Riverside, CA; 3900 Main Street; Roofing Contractor; Roofing Contractors.

Submission deadline

2023-01-12

Red flag teaser

13 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

13 found

Back-Charge / Setoff Rights

high

…ges, invoiced fee or other debt which is owed, or which becomes owed, by Contractor to City, City reserves the right to withhold and offset said amounts from any payments, refunds or reimbursements owed by City to Contractor under the Contract. Notice of such withholding and offset shall promptly be given to Contractor by City in writing. In the event of a dispute as to the amount owed or whether

Broad Indemnification

high

…hereby relieved at all times from any indebtedness or claim other than payments under the terms of the Contract. The Contractor will indemnify and hold harmless the City and its officers and employees from any loss, demand, damages, claims or actions arising from or in connection with said indebtedness. 2-3 SUBCONTRACTS 2-3.2 Self Performance. The Contractor shall perform, with its own organizati

Hazardous Material / Abatement Coordination

high

…nized, Kynar coated coping cap sheet metal. Must be manufactured and warranted by membrane manufacturer. E. Butyl Tape: 100% solids, asbestos free and compressive tape designed to seal as recommended and furnished by the membrane manufacturer. PART 3 – EXECUTION 3.01 EXAMINATION A. Examine substrate surfaces to receive modified bitumen sheet roofing system and associated work and conditions under

Liquidated Damages

high

…ng the Project back on schedule within a reasonable period of time following such a request will subject Contractor to assessment of liquidated damages at the daily rate specified for late completion. The Contractor shall not shorten or delete specified cure times or omit portions of the Work in order to bring the Project back within schedule unless such measures are mutually agreed to by the Pro

Mandatory Pre-Bid / Pre-Proposal Meeting

high

…s. SECTION 2 --- SCOPE AND CONTROL OF THE WORK Tentative Schedule of Events Event Date Time Request for Bids Released 12/06/2023 N/A Mandatory Pre-Bid Meeting 12/15/2023 10:00AM PT Final Questions Due 12/21/2023 BEFORE 2:00PM PT Responses to Questions Released 12/28/2023 N/A Bids Due 01/12/2024 BEFORE 2:00PM PT The City reserves the right to amend, withdraw and cancel this BID. The City reserves

Locked analysis

All deadlines table

6 dates
ItemDue
BIDS DUE 2023-01-12
Request for Bids Released 2023-12-06
Mandatory Pre-Bid Meeting 2023-12-15
Final Questions Due 2023-12-21
Responses to Questions Released 2023-12-28
Bids Due 2024-01-12

Locked analysis

Required certifications checklist

25 items
  • Complete bid/proposal form
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all