Robertson Park Restroom Replacement

This is a City of Sacramento demolition and waste management permit application for the removal of an existing restroom building at 3525 Norwood Avenue and installation of a new restroom building in its place. The project is owned by the City of Sacramento and requires compliance with the City's Construction & Demolition (C&D) Debris Waste Management Plan, which mandates a 65% recycling/diversion rate for all demolition debris. The work involves coordination with multiple City departments including Planning, Fire, Utilities, Solid Waste, and Housing & Dangerous Buildings, and requires submission of a Waste Log within 30 days of permit finalization. This is a municipal demolition and new construction project in Sacramento, California. Source scope cues include: City of Sacramento Recycling; CITY OF SACRAMENTO; is required if a project has multiple building permits associated to it (i.; the City will not sell your data or information for any purpose.; 3525 NORWOOD AVE; 2812 Meadowview Road, Building.

BID WITH CAUTION 8 red flags detected : Broad Indemnification / Hold Harmless

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

This is a City of Sacramento demolition and waste management permit application for the removal of an existing restroom building at 3525 Norwood Avenue and installation of a new restroom building in its place. The project is owned by the City of Sacramento and requires compliance with the City's Construction & Demolition (C&D) Debris Waste Management Plan, which mandates a 65% recycling/diversion rate for all demolition debris. The work involves coordination with multiple City departments including Planning, Fire, Utilities, Solid Waste, and Housing & Dangerous Buildings, and requires submission of a Waste Log within 30 days of permit finalization. This is a municipal demolition and new construction project in Sacramento, California. Source scope cues include: City of Sacramento Recycling; CITY OF SACRAMENTO; is required if a project has multiple building permits associated to it (i.; the City will not sell your data or information for any purpose.; 3525 NORWOOD AVE; 2812 Meadowview Road, Building.

Submission deadline

TBD

Red flag teaser

8 red flags detected including Broad Indemnification / Hold Harmless.

Locked analysis

Full red flag list with excerpts

8 found

Broad Indemnification / Hold Harmless

critical

Indemnify and hold harmless the City of Sacramento, its officers, employees, and agents from and against any and all actions, damages, claims, losses or expenses of every type and description to which they may be subject or put, by reason of or resulting from directly or indirectly, negligent injury to persons or property arising out of a permit issued by the City to the undersigned to demolish the building and salvage the materials from the premises above named.

65% Recycling / Diversion Rate Mandate with Fines

high

65% of all debris must be recycled if generated during the course of your project. Failure to meet the 65% diversion rate may result in a fine being imposed. Your Waste Log must demonstrate that the 65% diversion rate has been met. Failure to comply with these terms and conditions may result in a fine and a security deposit on future projects.

Hazardous Material / Asbestos Abatement Coordination

high

Are there any hazardous materials on site? (i.e. asbestos, flammable or combustible liquids, etc.) Yes – Explain: _____ x No. Commercial buildings are required to have an Asbestos Form and are not to be issued before Air Quality Date is on the Asbestos Form (bottom right corner).

Multiple City Department Approvals Required

medium

Approval by the following City Departments must be obtained prior to the issuance of a wrecking permit by the Community Development Department. Design Review approval is required on all wrecking permits in Central City or the Alhambra Corridor prior to sewer disconnect/ permit issuance.

Notification of Adjacent Property Owners Required

medium

Prior to the start of any demolition work on any building or structure in excess of two (2) stories in height, the permittee shall give written notice to owners or tenants of adjoining property not less than ten (10) days before such demolition is started and shall contemporaneously send a copy of each such notice to the director. The permittee shall take all necessary precautions to adequately protect adjacent property and its occupants.

Locked analysis

All deadlines table

5 dates
ItemDue
Waste Management Plan Approval TBD
Waste Log Submission TBD
Demolition Scheduled Completion TBD
Demolition Date 2022-10-20
Receipt Retention Period TBD

Locked analysis

Required certifications checklist

3 items
  • Verify requirement: Commercial General Liability Insurance
  • Verify requirement: Asbestos Form / Air Quality Certification
  • Verify requirement: Contractor License

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all