← Public RFP analyses

Robertson Park Restroom Replacement (Rebid)

This is a City of Sacramento demolition and waste management permit application for the removal of an existing restroom building at 3525 Norwood Avenue and installation of a new restroom building. The project is a municipal demolition and new construction project requiring compliance with Sacramento's Construction & Demolition (C&D) debris waste management regulations, which mandate a 65% recycling/diversion rate. The scope includes demolition of the existing structure, utility disconnections (water taps), hazardous materials assessment, and waste hauling coordination through certified facilities or franchised haulers. Source scope cues include: City of Sacramento Recycling; CITY OF SACRAMENTO; is required if a project has multiple building permits associated to it (i.; the City will not sell your data or information for any purpose.; 3525 NORWOOD AVE; 2812 Meadowview Road, Building.

BID WITH CAUTION 7 red flags detected : Broad Indemnification / Hold Harmless

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

This is a City of Sacramento demolition and waste management permit application for the removal of an existing restroom building at 3525 Norwood Avenue and installation of a new restroom building. The project is a municipal demolition and new construction project requiring compliance with Sacramento's Construction & Demolition (C&D) debris waste management regulations, which mandate a 65% recycling/diversion rate. The scope includes demolition of the existing structure, utility disconnections (water taps), hazardous materials assessment, and waste hauling coordination through certified facilities or franchised haulers. Source scope cues include: City of Sacramento Recycling; CITY OF SACRAMENTO; is required if a project has multiple building permits associated to it (i.; the City will not sell your data or information for any purpose.; 3525 NORWOOD AVE; 2812 Meadowview Road, Building.

Submission deadline

TBD

Red flag teaser

7 red flags detected including Broad Indemnification / Hold Harmless.

Locked analysis

Full red flag list with excerpts

7 found

Broad Indemnification / Hold Harmless

critical

Indemnify and hold harmless the City of Sacramento, its officers, employees, and agents from and against any and all actions, damages, claims, losses or expenses of every type and description to which they may be subject or put, by reason of or resulting from directly or indirectly, negligent injury to persons or property arising out of a permit issued by the City to the undersigned to demolish the building and salvage the materials from the premises above named.

65% Construction & Demolition Debris Recycling Mandate

high

65% of all debris must be recycled if generated during the course of your project. Failure to meet the 65% diversion rate may result in a fine being imposed. Your Waste Log must demonstrate that the 65% diversion rate has been met.

Hazardous Material / Abatement Coordination

high

…______________________ x No Are there underground tanks on the property Yes x No Are there any hazardous materials on site? (i.e. asbestos, flammable or combustible liquids, etc.) Yes – Explain: __________________________________________________________________ x No Responsible Party 5/17/22 Signature:_______________________________________________ Date:___________________ Comment:___________

Notification of Adjacent Property Owners Required

medium

Prior to the start of any demolition work on any building or structure in excess of two (2) stories in height, the permittee shall give written notice to owners or tenants of adjoining property not less than ten (10) days before such demolition is started and shall contemporaneously send a copy of each such notice to the director. The permittee shall take all necessary precautions to adequately protect adjacent property and its occupants.

Permit Revocation for Code Violations

medium

This is a Revocable Permit. I further state that I understand that this permit may be revoked for any violation of the provisions of the Code of the City of Sacramento pertaining to or affected by the demolition procedure to be used on the above building.

Locked analysis

All deadlines table

3 dates
ItemDue
Waste Log Submission TBD
Demolition Scheduled Completion 2022-10-20
Receipt and Weight-Ticket Retention TBD

Locked analysis

Required certifications checklist

4 items
  • Verify requirement: Commercial General Liability Insurance
  • Verify requirement: Asbestos Form / Hazardous Materials Assessment
  • Verify requirement: Contractor License
  • Resolve before bid: Broad Indemnification / Hold Harmless

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all