Riverside Regional Water Quality Control Plant Tequesquite Landfill Blowers Rehabilitation

Source scope cues include: CITY OF RIVERSIDE FINANCE; City of Riverside Public Works; BID BOND OR CASHIERS CHECK IS REQUIRED WITH THIS BID U U All Bids and any supplemental documents as called for by the Special Provisions (unless otherwise U noted in th; Tequesquite Landfill entrance gate located at 5107 Rubidoux Avenue, Riverside, CA 92501.; BID SECURITY AND SUPPORTING DOCUMENTS MUST BE UPLOADED.; Failure to be so licensed shall result in rejection of the proposal as non-responsive.; foundation where Gas Compressor No.; demolition of the remaining two existing compressors (Compressors No.; 3-13 COMPLETION, ACCEPTANCE, AND WARRANTY.; 1 Prevailing Wages/Certified Payrolls.; Provide Additional Insured Endorsement.; added as additional insured under this policy.; 7 Deductibles and Self-Insured Retentions.; or eliminate such deductibles or self-insured retentions.; signs are damaged and deemed unusable, the cost of replacement signs shall be reduced from payment.; 3900 Main Street, Riverside, CA; 5107 Rubidoux Avenue, Riverside, CA; 3900 Main Street, Riverside CA; Electrical Contractors.

BID WITH CAUTION 21 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: CITY OF RIVERSIDE FINANCE; City of Riverside Public Works; BID BOND OR CASHIERS CHECK IS REQUIRED WITH THIS BID U U All Bids and any supplemental documents as called for by the Special Provisions (unless otherwise U noted in th; Tequesquite Landfill entrance gate located at 5107 Rubidoux Avenue, Riverside, CA 92501.; BID SECURITY AND SUPPORTING DOCUMENTS MUST BE UPLOADED.; Failure to be so licensed shall result in rejection of the proposal as non-responsive.; foundation where Gas Compressor No.; demolition of the remaining two existing compressors (Compressors No.; 3-13 COMPLETION, ACCEPTANCE, AND WARRANTY.; 1 Prevailing Wages/Certified Payrolls.; Provide Additional Insured Endorsement.; added as additional insured under this policy.; 7 Deductibles and Self-Insured Retentions.; or eliminate such deductibles or self-insured retentions.; signs are damaged and deemed unusable, the cost of replacement signs shall be reduced from payment.; 3900 Main Street, Riverside, CA; 5107 Rubidoux Avenue, Riverside, CA; 3900 Main Street, Riverside CA; Electrical Contractors.

Submission deadline

2025-09-23

Red flag teaser

21 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

21 found

Back-Charge / Setoff Rights

high

…ges, invoiced fee or other debt which is owed, or which becomes owed, by Contractor to City, City reserves the right to withhold and offset said amounts from any payments, refunds or reimbursements owed by City to Contractor under the Contract. Notice of such withholding and offset shall promptly be given to Contractor by City in writing. In the event of a dispute as to the amount owed or whether

Broad Indemnification

high

…hereby relieved at all times from any indebtedness or claim other than payments under the terms of the Contract. The Contractor will indemnify and hold harmless the City and its officers and employees from any loss, demand, damages, claims or actions arising from or in connection with said indebtedness. 3-2 SELF PERFORMANCE. Replace Subsection 3-2 with the following language: The Contractor shall

Hazardous Material / Abatement Coordination

high

…hall not compact or shake down in vibrating service. Blanket insulation shall consist of a noncombustible silica cloth jacket and nonasbestos white ceramic fiber insulation. 2. Acceptable manufacturers: 1) Auralex J-10SHBL 2) Unitherm Isocovers 2) Tighitco 3) Advanced Thermal Products. 4) SEI Temp-Set 450-1200. 5) City Approved Equal. 2.3 INSULATION JACKETS A. Laminated Jackets: Laminated jackets

Liquidated Damages

high

…stored in public streets and right-of-way. If the Contractor does not adhere to this requirement, the Contractor shall be subject to liquidated damages as described in Section 6-9 of these Special Provisions. Excavated material, except that which is to be used as backfill in the adjacent trench, shall not be stored in public streets and right-of-way unless otherwise specified in these Special pro

Mandatory Pre-Bid / Pre-Proposal Meeting

high

…must be submitted to the Purchasing Manager, at 3900 Main Street, Riverside, CA 92522, prior to the hour and the date stated above. Mandatory Pre-Bid Conference. All prospective Companies are invited to attend the Mandatory Pre-Bid Conference meeting on September 23, 2025, at 9:00 A.M. Pacific Time. All participants shall meet at the Tequesquite Landfill entrance gate located at 5107 Rubidoux Ave

Locked analysis

All deadlines table

6 dates
ItemDue
Conference meeting on 2025-09-23
Bid Released 2025-09-09
Online Questions Deadline 2025-09-30
Online Questions Responses 2025-10-07
Bid Due 2025-10-14
Bid 8121-Landfill Blower Special Provision- FINAL Part 1, Page 3 2025-09-03

Locked analysis

Required certifications checklist

28 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all