Riverside County Fencing and Site Clean Up

Source scope cues include: planetbids.com/portal; will not accept any bid without proof of current registration to perform public work pursuant to Section 1725.; work may be required under emergency conditions, and may be $100,000) issued by a surety approved by Metropolitan.; Code of Regulations Section 16000, shall be uploaded to other pertinent factual data necessary to evaluate the claim.; invoice amount will be made therefor, subject to the practicable, but not later than 7 days, after receipt.; The Contractor shall jointly inspect the site with the Engineer to define the scope of work.; A task order will be issued with the scope of work required at each location.; The work shall take place at Metropolitan properties located in Riverside County where services are required.; for map of MWD facilities in located in Riverside County.; For each subsequent job site, a cost estimate and schedule to complete work shall be approved by the Engineer.; Cost estimate and schedule to complete work at work site shown in Exhibit 1 and any subsequent work site identified.; The Contractor shall obtain all necessary permits from city and other government agencies, as necessary.; Work shall be performed under the terms and conditions of these permits.; subcontractor, including cell phone and emergency numbers.; Any temporary batch plant located on site shall have the appropriate CARB/local air district operating permit.; mee(cid:30)ngs and site district permits.; 6160 Arlington Avenue, Riverside CA; 6160 Arlington Ave, Riverside, CA; 2027 Battleground Road; plumbing contractor.

BID WITH CAUTION 13 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: planetbids.com/portal; will not accept any bid without proof of current registration to perform public work pursuant to Section 1725.; work may be required under emergency conditions, and may be $100,000) issued by a surety approved by Metropolitan.; Code of Regulations Section 16000, shall be uploaded to other pertinent factual data necessary to evaluate the claim.; invoice amount will be made therefor, subject to the practicable, but not later than 7 days, after receipt.; The Contractor shall jointly inspect the site with the Engineer to define the scope of work.; A task order will be issued with the scope of work required at each location.; The work shall take place at Metropolitan properties located in Riverside County where services are required.; for map of MWD facilities in located in Riverside County.; For each subsequent job site, a cost estimate and schedule to complete work shall be approved by the Engineer.; Cost estimate and schedule to complete work at work site shown in Exhibit 1 and any subsequent work site identified.; The Contractor shall obtain all necessary permits from city and other government agencies, as necessary.; Work shall be performed under the terms and conditions of these permits.; subcontractor, including cell phone and emergency numbers.; Any temporary batch plant located on site shall have the appropriate CARB/local air district operating permit.; mee(cid:30)ngs and site district permits.; 6160 Arlington Avenue, Riverside CA; 6160 Arlington Ave, Riverside, CA; 2027 Battleground Road; plumbing contractor.

Submission deadline

2025-10-30

Red flag teaser

13 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

13 found

Back-Charge / Setoff Rights

high

…ence of his or her operations, within the determine the nature and extent of such costs and will, if he or terms of the Contract, to offset the expected delay. The she finds that payment is due, issue an extra work order therefor, Contractor shall notify the Engineer, in writing, concerning the subject to the provisions of Article 11. If the Engineer cause of delay, within 15 days of the beginnin

Broad Indemnification

high

…work is to be completed is the essence of the Contract. acceptance of the work by Metropolitan. 15. (a) The Contractor shall defend, indemnify and save 20. By entering into this contract, the Contractor offers and harmless Metropolitan, the Board, each member of the Board agrees to assign to Metropolitan all right, title, interest in and to and Metropolitan's officers, agents and employees from a

Hazardous Material / Abatement Coordination

high

…nt Person Fall Protection Plan Permit Required Confined Space Entry Type of Entry – permit entry, reclassification, or downgrade entry Ventilation Plan Air Monitoring Plan Entry Plan - evacuation and rescue, emergency plan, access control Demolition Demolition Plans Hazardous Materials and Abatement Hazardous Material Transport Plan M-3079 01060-6 Project Spec (construction contract

Liquidated Damages

high

…cordance with the General Conditions, then the certified or cashier's check, or bidder's bond accompanying the bid shall be forfeited, cashed, or enforced as appropriate. The money available therefrom shall become the property of Metropolitan as liquidated damages for such failure or refusal. If the successful bidder complies MS August 6, 2024 00100M-1 MWD Standard Document (construction contract

Prevailing Wage / Certified Payroll

high

…th state or federal laws or regulations pertaining to labor and employment standards, including those involving workplace safety and prevailing wages; f. Falsification of any document relating to a bid in response to a solicitation by Metropolitan for the procurement of goods and services or a public work contract entered into; g. Concealment, withholding, and/or destruction of records he or she

Locked analysis

All deadlines table

2 dates
ItemDue
Avenue, Riverside CA 92504 at 10:30 a.m., 2025-10-30
requirements of Document 00100M, Instructions to Bidders, on or before 2:00 p.m., 2025-11-20

Locked analysis

Required certifications checklist

22 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all