Restoration of Infiltration Rate at Hickory Basin

Source scope cues include: NUMBER RFP-HD-1 7-002 PROFESSIONAL CONTRACTING SERVICES RELATED TO RESTORATION OF INFILTRATION RATE WITHIN; City of Fontana; sealed envelope with all original; BID BOND 3-15 REQUEST FOR PROPOSAL: RFP-HD-17-002 TOC-1 SECTION 4 - TECHNICAL SPECIFICATIONS INTRODUCTION / SCOPE OF WORK - TASKA - TASKB - TASKC PROJECT LOCATION IN; sealed proposal; carelessness in the interpretation of the scope of work.; Payment discount proposed, in exchange for expedited invoice payment.; approval by the Project Manager, within thirty (30) days following receipt of the invoice.; expedited payment of any or all invoices.; Business License number issued by the City where the Offeror's principal place of business is located.; TYPE OF SERVICES PROVIDED (Note: Please attach a “typical” invoice, for the services provided.; inches of the side slope soil will, over time, accumulate a calcified (or sealed) condition.; for removal shall not be relocated to any onsite area outside of the basin depression.; locations of subsurface utilities existing within the basin slopes and floor.; the nature and origin of the soil to be utilized for any gully repairs.; Task C shall also include any erosion gully repairs to be made on the side-slopes of Hickory Basin.; to the requirements of the contract, this Scope of Work.; Control District as additionally insured’s.; 6075 Kimball Avenue, Building A, Chino, California; 13000 Napa Avenue, Fontana, CA; 6075 Kimball Avenue, Bldg..

BID WITH CAUTION 13 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: NUMBER RFP-HD-1 7-002 PROFESSIONAL CONTRACTING SERVICES RELATED TO RESTORATION OF INFILTRATION RATE WITHIN; City of Fontana; sealed envelope with all original; BID BOND 3-15 REQUEST FOR PROPOSAL: RFP-HD-17-002 TOC-1 SECTION 4 - TECHNICAL SPECIFICATIONS INTRODUCTION / SCOPE OF WORK - TASKA - TASKB - TASKC PROJECT LOCATION IN; sealed proposal; carelessness in the interpretation of the scope of work.; Payment discount proposed, in exchange for expedited invoice payment.; approval by the Project Manager, within thirty (30) days following receipt of the invoice.; expedited payment of any or all invoices.; Business License number issued by the City where the Offeror's principal place of business is located.; TYPE OF SERVICES PROVIDED (Note: Please attach a “typical” invoice, for the services provided.; inches of the side slope soil will, over time, accumulate a calcified (or sealed) condition.; for removal shall not be relocated to any onsite area outside of the basin depression.; locations of subsurface utilities existing within the basin slopes and floor.; the nature and origin of the soil to be utilized for any gully repairs.; Task C shall also include any erosion gully repairs to be made on the side-slopes of Hickory Basin.; to the requirements of the contract, this Scope of Work.; Control District as additionally insured’s.; 6075 Kimball Avenue, Building A, Chino, California; 13000 Napa Avenue, Fontana, CA; 6075 Kimball Avenue, Bldg..

Submission deadline

Not listed in the public preview.

Red flag teaser

13 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

13 found

Broad Indemnification

high

…performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless, Owner and Engineer, their officers, agents, and employees as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and virtue and Principal and Surety, in the event suit is br

Liquidated Damages

high

…, Equal Opportunity, Dispute Resolution (Arbitration), Prevailing Wages, Worker's Legal Status, Fitness for Duty, Governing Law, and Liquidated Damages.” All Contractors intending to submit proposals to perform the work described under this Specification shall fully inform themselves of the provisions of the Agency’s Typical Contract for the performance of earthwork maintenance type(s) of work be

Prevailing Wage / Certified Payroll

high

…Labor Code Sections 1810 to 1815, Liens, Indemnification, Conflict of Interest, Equal Opportunity, Dispute Resolution (Arbitration), Prevailing Wages, Worker's Legal Status, Fitness for Duty, Governing Law, and Liquidated Damages.” All Contractors intending to submit proposals to perform the work described under this Specification shall fully inform themselves of the provisions of the Agency’s Ty

Bid Bond Required

medium

…CTION 3 - FORMS SUMMARY FEE SCHEDULE "A" 3-1 FEE INCLUSION STATEMENT 3-1 PROPOSED FEE FOR CONTRACTOR'S SERVICES 3-1 EXPEDITED PAYMENT DISCOUNT 3-2 PROPOSAL SIGNATURE 3-2 OFFEROR IDENTIFICATION 3-3 REFERENCES AND SUBCONTRACTORS 3-4 WORKERS' COMPENSATION CERTIFICATE 3-5 NON-COLLUSION AFFIDAVIT 3-6 WAIVER/RELEASE OF LIABILITY 3-7 EXCEPTION FORM 3-8 PERFORMANCE BOND 3-9 PAYMENT BOND 3-12 BID BOND 3-1

High Insurance Limits Required

medium

¢ PUBLIC LIABLITY AND PROPERTY DAMAGE - The limits of liability in the Public Liability and Property Damage policy or policies shall not be less than $1,000,000 combined single limit.

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

20 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all