Request For Prequalification Of Bidders For The RMPU Basin Improvement Project No. RW15003.06

Source scope cues include: City of Ontario off East; City of Chino; sealed proposal; and financial statement of the last complete fiscal year on a CD or USB memory stick.; Public Right of Way shall comply with the district/city permits and municipal ordinances.; i mplementing the traffic control plans and city permits for working on the streets.; to the proposed project scope are welcome.; Federal Davis Bacon prevailing wages?; requirements that apply to the scope stated in their contracts.; and codes, as applicable, and shall obtain all required approvals and permits.; (c) Procurement by sealed bids (formal advertising).; the cost of the replacement property.; ultimate disposition data including the date of disposal and sale price of the property.; (1) Any proposed change in the scope of the Project.; the necessary approvals, entitlements, or permits in Item 3.; permits or licenses shall be submitted to the Division before construction starts.; Agreement to ensure that the prevailing wage provisions of the State Labor Code are being met.; (h) State Water Board’s Drought Emergency Water Conservation regulations.; 6075 Kimball Avenue, Building A; 3 miles NE; 200 Constitution Avenue, N.W..

BID WITH CAUTION 13 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Ontario off East; City of Chino; sealed proposal; and financial statement of the last complete fiscal year on a CD or USB memory stick.; Public Right of Way shall comply with the district/city permits and municipal ordinances.; i mplementing the traffic control plans and city permits for working on the streets.; to the proposed project scope are welcome.; Federal Davis Bacon prevailing wages?; requirements that apply to the scope stated in their contracts.; and codes, as applicable, and shall obtain all required approvals and permits.; (c) Procurement by sealed bids (formal advertising).; the cost of the replacement property.; ultimate disposition data including the date of disposal and sale price of the property.; (1) Any proposed change in the scope of the Project.; the necessary approvals, entitlements, or permits in Item 3.; permits or licenses shall be submitted to the Division before construction starts.; Agreement to ensure that the prevailing wage provisions of the State Labor Code are being met.; (h) State Water Board’s Drought Emergency Water Conservation regulations.; 6075 Kimball Avenue, Building A; 3 miles NE; 200 Constitution Avenue, N.W..

Submission deadline

Not listed in the public preview.

Red flag teaser

13 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

13 found

Broad Indemnification

high

…properly allocable to Project Costs for which the Recipient has been reimbursed by the State Water Board under this Agreement. C-16. Indemnification and State Reviews The parties agree that review or approval of Project documents by the State Water Board is for administrative purposes only, including conformity with application and eligibility criteria, and expressly not for the purposes of desig

Federal Funding Compliance (ARPA / CDBG / HUD / FEMA / 2 CFR 200)

high

…pproved scope of work or associated tasks, even if there is no associated budget revisions. b) Revisions which require additional Federal funds to complete the project. c) Revisions which involve specific costs for which prior written approval requirements may be imposed consistent with OMB cost principles listed in 2 CFR 200 Subpart E Wineville – USBR Grant Language – Executed Agreement Pending

Hazardous Material / Abatement Coordination

high

…contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Modification Number Publication Date 0 01/04/2019 1 02/01/2019 2 02/15/2019 ASBE0005-002 07/01/2018 Rates Fringes Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems).....$ 39.72 20.8

Liquidated Damages

high

(23) Has your firm been assessed and paid liquidated damages after completion of a project under a construction contract with either a public or private owner? (24) Has your firm or any of its owners, officers, or partners ever been found liable in a civil suit or found guilty in a criminal action for making any false claim or material misrepresentation to any public agency or entity?

No Material Substitutions Without Owner Approval

high

…standards do not relieve the non-Federal entity of any contractual responsibilities under its contracts. The Federal awarding agency will not substitute its judgment for that of the non-Federal entity unless the matter is primarily a Federal concern. Violations of law will be referred to the local, state, or Federal authority having proper jurisdiction. §200.319 Competition. (a) All procurement t

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

17 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Include references or past project experience

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all