← Public RFP analyses

Request for bid for Electrical Contract

Source scope cues include: Consumer Price Index- CPI-U, or other applicable data).; Metropolitan all such information and data for this purpose.; Supplier on purchase documentation, such as packing slips and invoices.; proposed replacement before shipment to Metropolitan.; Contractor shall provide Material Safety Data Sheets (MSDS), where applicable.; Contractor shall provide proof of required insurance prior to the start of work.; Water Treatment Plant; 90012 Soto Street; 3201 Wheeler Ave.

BID WITH CAUTION 3 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: Consumer Price Index- CPI-U, or other applicable data).; Metropolitan all such information and data for this purpose.; Supplier on purchase documentation, such as packing slips and invoices.; proposed replacement before shipment to Metropolitan.; Contractor shall provide Material Safety Data Sheets (MSDS), where applicable.; Contractor shall provide proof of required insurance prior to the start of work.; Water Treatment Plant; 90012 Soto Street; 3201 Wheeler Ave.

Submission deadline

2020-03-26

Red flag teaser

3 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

3 found

Broad Indemnification

high

…ral Liability and Auto Liability Insurance policies are to contain, or be endorsed to contain Metropolitan as additional insured for indemnified matters and claims arising from Contractor’s fault or negligence. Other endorsements and insurance provisions include: all rights of subrogation under the General Liability and Workers' Compensation policies have been waived against Metropolitan. Contrac

High Insurance Limits Required

medium

…engaged in this contract will be considered employees of the Supplier, and will be held responsible for their work and shall be subject to all the provisions of the contract document 21. Insurance Requirements Contractor shall secure and maintain insurance with limits no less than: a) Commercial General Liability - $1,000,000 per occurrence for bodily injury, personal injury and property damage 1

Owner Right to Reject All Bids

low

…itan reserves the following options: 1. The right to award in whole or in multiples. 2. The right to reject all partial bids. 3. The right to reject any or all bids or make no award. 4. The right to issue subsequent request for bids. 5. The right to approve or disapprove the use of particular subcontractors and /or suppliers. 6. The right to waive any informality or irregularity in the bidding pr

Locked analysis

All deadlines table

2 dates
ItemDue
RFB QUESTIONS DUE (11:00 AM.) ..................................................................................... 2020-03-26
BID SUBMITTAL DUE (11:00 A.M) .......................................................................................... 2020-04-02

Locked analysis

Required certifications checklist

13 items
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Acknowledge all addenda
  • Include references or past project experience
  • Include safety documents if required
  • Submit through the e-procurement / online bid system
  • Verify requirement: Commercial General Liability Insurance

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all