← Public RFP analyses

Rehabilitation of Recycled Water Storage Reservoirs 1158 East and 1158 West

Source scope cues include: City of Rancho Cucamonga Noise; PREVAILING WAGE REQUIREMENTS ........................................................................................................ 1; sealed proposal; 0 EXPERIENCE DATA AND BUSINESS STANDING .; 0 CORRECTION OR REPLACEMENT OF DEFECTIVE WORK .; 0 SPECIAL PERMITS AND PLAN REVIEW .; 0 POTHOLING FOR EXISTING UTILITIES (Not used) .; The site of the Work is located inside the Etiwanda Generation Station.; Upon award, the results of the bid opening will be posted on PlanetBids.; prevailing wage rates for the types of work to be done under this Bid Documents.; Copies of Addenda will be posted to PlanetBids.; subject bid item in conformance with the Bid Documents, and permits complete.; roof, in accordance with the plans.; The undersigned Bidder shall submit experience data.; Certification must be received from California Public Utilities Commission clearing House.; in a court of competent jurisdiction in the location in which the work is located.; the applicable warranty commencement date under the Contract.; 6075 Kimball Avenue; 8996 Etiwanda Ave; 6075 Kimball Avenue, Building.

BID WITH CAUTION 17 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Rancho Cucamonga Noise; PREVAILING WAGE REQUIREMENTS ........................................................................................................ 1; sealed proposal; 0 EXPERIENCE DATA AND BUSINESS STANDING .; 0 CORRECTION OR REPLACEMENT OF DEFECTIVE WORK .; 0 SPECIAL PERMITS AND PLAN REVIEW .; 0 POTHOLING FOR EXISTING UTILITIES (Not used) .; The site of the Work is located inside the Etiwanda Generation Station.; Upon award, the results of the bid opening will be posted on PlanetBids.; prevailing wage rates for the types of work to be done under this Bid Documents.; Copies of Addenda will be posted to PlanetBids.; subject bid item in conformance with the Bid Documents, and permits complete.; roof, in accordance with the plans.; The undersigned Bidder shall submit experience data.; Certification must be received from California Public Utilities Commission clearing House.; in a court of competent jurisdiction in the location in which the work is located.; the applicable warranty commencement date under the Contract.; 6075 Kimball Avenue; 8996 Etiwanda Ave; 6075 Kimball Avenue, Building.

Submission deadline

Not listed in the public preview.

Red flag teaser

17 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

17 found

Back-Charge / Setoff Rights

high

…cified in the Contract, actual damages caused by non-performance of the Contract, including but not limited to, all valid and proper back charges, offsets, payments, indemnities, or other damages; 3. Additional legal, design professional and delay costs resulting from the Principal Default or resulting from the actions or failure to act of the Surety under Paragraph D, above. G. No right of actio

Broad Indemnification

high

….................................................................................................. 61 2.0 CONTRACTOR'S INSURANCE AND INDEMNIFICATION ............................................................................. 62 3.0 ACTS OF GOD ............................................................................................................................................ 66 4.0 CONTR

Hazardous Material / Abatement Coordination

high

…ject includes application of protective coatings to interior surfaces and paints to exterior surfaces, including removal of exterior asbestos cladding, surface preparation, handling of hazardous and non-hazardous materials/wastes, wash down of interior surfaces and additions, replacement and modification of miscellaneous structural items to bring the structures into compliance with current safety

Liquidated Damages

high

…............................................................................................................................. 9 11.0 LIQUIDATED DAMAGES .............................................................................................................................. 9 12.0 PREVAILING WAGE REQUIREMENTS ....................................................................................

Mandatory Pre-Bid / Pre-Proposal Meeting

high

…tered plan holder on PlanetBids for the project being bid prior to the bid opening. 4.0 PRE-BID CONFERENCE AND JOB SITE INSPECTION A mandatory pre-bid conference and job site inspection will be conducted on September 18 at 8996 Etiwanda Ave., Rancho Cucamonga, CA 91739 at 10:00 a.m. to acquaint the contractors with the facilities and the location of the proposed Work. The job site inspection will

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

23 items
  • Complete bid/proposal form
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all