Back-Charge / Setoff Rights
high
…this determination is given to the Contractor, a substantial monetary penalty, on account of the NTH violation, may be withheld and set off by the Finance Department from progress payments, or the final payment, due to the Contractor for work performed under the Contract. Depending upon the seriousness or willfulness of the NTH violation, the amount of money which may be withheld may be up to, bu
Broad Indemnification
high
…m the date of bid opening. If the City determines that a tiebreaker is necessary, each applicable Bidder agrees to participate or to indemnify the City in any litigation resulting from the utilization of the tiebreaker. If a Bidder refuses to timely participate, the City shall conduct the coin toss in a manner determined by the City to be fair to all and the results of such coin toss shall be fin
Federal Funding Compliance (ARPA / CDBG / HUD / FEMA / 2 CFR 200)
high
…h provides limited, representative evaluation of painted surfaces at referenced locations at the subject site in accordance with the HUD, and State of California requirements under Title 17, Division 1, Chapter 8. Sampling was conducted using a SciAps Lead Detector, Model X550 (Serial No.02052). The instrument was utilized within the operating parameters established by SciAps as indicated in the
Hazardous Material / Abatement Coordination
high
…g Building Roof Abatement and Replacement BID FILE NUMBER: 12601180 The scope of work includes but is not limited to; the removal of lead-based paint and asbestos- containing materials, wood shake roofing and siding, and the existing built-up roofing. Following demolition, the work will involve the installation of new wood sheathing with factory-applied radiant barrier, asphalt shingle roofing, a
Lien Waiver / Waiver of Lien Rights
high
…he Contract Documents; or (iii) terms of special warranties required by the Contract Documents. Contractor shall promptly provide an unconditional waiver and release upon final payment in accordance with California Civil Code section 3262 and these Contract Documents. Except to the extent of any Claim arising from City’s sole or active negligence, and except to the extent Contractor expressly des