← Public RFP analyses

Q/R Alley Sewer Replacement, 16th to 17th Streets

Source scope cues include: City of Sacramento; CITY OF SACRAMENTO Sealed Proposals; bid security of at least 10% of the sum the Bid Proposal. The City reserves the right to reject proposals or to waive any error or omission in any Bid Proposal received. Si; planetbids.com/portal/portal; bond requirements of the Contractor. 4. The work performed or the materials/equipment/supplies provided by the listed LBE are unsatisfactory or are not in accordance with the pl...; City Hall, located at 915 I Street, 5th Floor, Public Counter, up to the hour of 2:00 p.; an alteration, demolition, repair, and maintenance project of $15,000 or less.; Clerk, located at 915 I Street, 5th Floor, Sacramento, CA 95814.; employee located in the City or unincorporated county of Sacramento.; insurance is canceled or Contractor otherwise ceases to be insured as required herein.; meets the minimum scope and limits of insurance coverage specified in subsection A, above.; 06 Proof of Compliance with Contract .; 10 Unsuitable Material, Removal and Replacement .; Utilities, 1395 35th Ave, Sacramento, California, 95822, phone (916) 808-5760.; documents or other satisfactory proofs as to his compliance with such requirements.; gutter replacement shall coincide with sidewalk panel being replaced.; reconnection of the existing gutter drain to the new lead.; sealed as covered elsewhere in these Special Provisions..

BID WITH CAUTION 14 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Sacramento; CITY OF SACRAMENTO Sealed Proposals; bid security of at least 10% of the sum the Bid Proposal. The City reserves the right to reject proposals or to waive any error or omission in any Bid Proposal received. Si; planetbids.com/portal/portal; bond requirements of the Contractor. 4. The work performed or the materials/equipment/supplies provided by the listed LBE are unsatisfactory or are not in accordance with the pl...; City Hall, located at 915 I Street, 5th Floor, Public Counter, up to the hour of 2:00 p.; an alteration, demolition, repair, and maintenance project of $15,000 or less.; Clerk, located at 915 I Street, 5th Floor, Sacramento, CA 95814.; employee located in the City or unincorporated county of Sacramento.; insurance is canceled or Contractor otherwise ceases to be insured as required herein.; meets the minimum scope and limits of insurance coverage specified in subsection A, above.; 06 Proof of Compliance with Contract .; 10 Unsuitable Material, Removal and Replacement .; Utilities, 1395 35th Ave, Sacramento, California, 95822, phone (916) 808-5760.; documents or other satisfactory proofs as to his compliance with such requirements.; gutter replacement shall coincide with sidewalk panel being replaced.; reconnection of the existing gutter drain to the new lead.; sealed as covered elsewhere in these Special Provisions..

Submission deadline

2014-06-20

Red flag teaser

14 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

14 found

Back-Charge / Setoff Rights

high

…specified above shall in any manner be construed to constitute a release of any such liabilities nor a waiver of the City’s right to withhold payment for such liabilities. 16. INDEMNITY AND HOLD HARMLESS A. Contractor shall defend, hold harmless and indemnify the City, its officers, employees, and agents, and each and every one of them, from and against any and all actions, damages, costs, liabil

Broad Indemnification

high

8. In consideration of the foregoing, I shall defend, indemnify and hold harmless, the City, its officers and employees, against any claims, actions, damages, costs (including reasonable attorney fees), or other liabilities of any kind arising from any violation of the Requirements or of the Ordinance by me. I declare under penalty of perjury under the laws of the State of California that the fore

Liquidated Damages

high

…ion of the work within a period of thirty (30) working days commencing on the date specified in the Notice to Proceed. The amount of liquidated damages to be paid by the Contractor for failure to complete the work by the completion date (as extended, if applicable) shall be six hundred dollars ($600.00) for each calendar day, continuing to the time at which the work is completed. Such amount is t

No Material Substitutions Without Owner Approval

high

…ed LBE fails to perform its contractual obligations. 5. It would be in the best interest of the City. C. Subcontractor Substitution: No substitution of a LBE subcontractor shall be made at any time without compliance with the Subletting and Subcontracting Fair Practices Act. If a LBE subcontractor is unable to perform successfully and is to be replaced, the Contractor shall make reasonable effort

Prevailing Wage / Certified Payroll

high

…sion of Labor Compliance Reports, which became effective May 1, 2007. The contractor and every lower-tier subcontractor shall submit certified payrolls and labor compliance documentation electronically at the discretion of and in the manner specified by the City of Sacramento. Electronic submittal is via a web-based system, accessed on the World Wide Web by a web browser. Each contractor and subc

Locked analysis

All deadlines table

4 dates
ItemDue
awarding agencies for CMU services provided through 2014-06-20
now limited to: (1) public works projects awarded prior to 2012-01-01
Project Award 2015-03-09
Updated 2014-02-06

Locked analysis

Required certifications checklist

21 items
  • Complete bid/proposal form
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all