← Public RFP analyses

PSAB Roof Restoration Section 2

Source scope cues include: City of Sacramento; City of Sacramento reporting system; prevailing wages at the rates currently established by the Director of Industrial Relations under provisions of Sections 1773 of the La; PlanetBids before 2:00 PM on August 31, 2023 Online only at http://www.planetbids.com/portal/portal; bond requirements of the Contractor. 4. The work performed or the materials or equipment provided by the listed LBE subcontractor or supplier are unsatisfactory or are not in ac...; Detailed Scope of Work included in the Bid Documents.; to whom the bid documents have been issued via PlanetBids.; State Prevailing Wage Determinations https://www.; Saturday/Sunday premium rates are applicable as indicated on prevailing wage determinations.; Proof of service must be certified mail or email receipt only.; compliance requirements will result in your pay request or invoice being rejected.; pay request or invoice being rejected.; entered into in response to a declared emergency.; Contractor shall pay to City on demand all costs and expense of such repair.; defect, and Contractor shall pay to City on demand all costs and expense of such repair.; additional insureds as respects auto liability.; Repair any blisters or ridging on the roof surface.; Power wash the roof and allow to dry..

BID WITH CAUTION 15 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Sacramento; City of Sacramento reporting system; prevailing wages at the rates currently established by the Director of Industrial Relations under provisions of Sections 1773 of the La; PlanetBids before 2:00 PM on August 31, 2023 Online only at http://www.planetbids.com/portal/portal; bond requirements of the Contractor. 4. The work performed or the materials or equipment provided by the listed LBE subcontractor or supplier are unsatisfactory or are not in ac...; Detailed Scope of Work included in the Bid Documents.; to whom the bid documents have been issued via PlanetBids.; State Prevailing Wage Determinations https://www.; Saturday/Sunday premium rates are applicable as indicated on prevailing wage determinations.; Proof of service must be certified mail or email receipt only.; compliance requirements will result in your pay request or invoice being rejected.; pay request or invoice being rejected.; entered into in response to a declared emergency.; Contractor shall pay to City on demand all costs and expense of such repair.; defect, and Contractor shall pay to City on demand all costs and expense of such repair.; additional insureds as respects auto liability.; Repair any blisters or ridging on the roof surface.; Power wash the roof and allow to dry..

Submission deadline

Not listed in the public preview.

Red flag teaser

15 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

15 found

Back-Charge / Setoff Rights

high

…specified above shall in any manner be construed to constitute a release of any such liabilities nor a waiver of the City’s right to withhold payment for such liabilities. 16. INDEMNITY AND HOLD HARMLESS A. Contractor shall defend, hold harmless and indemnify the City, its officers, employees, and agents, and each and every one of them, from and against any and all actions, damages, costs, liabil

Broad Indemnification

high

…City’s right to withhold payment for such liabilities. 16. INDEMNITY AND HOLD HARMLESS A. Contractor shall defend, hold harmless and indemnify the City, its officers, employees, and agents, and each and every one of them, from and against any and all actions, damages, costs, liabilities, claims, demands, losses, judgments, penalties, costs and expenses of every type and description, whether arisi

Hazardous Material / Abatement Coordination

high

…n systems. 11. Review governing regulations and requirements for insurance and certificates if applicable. 12. Review procedures for asbestos removal or unexpected discovery of asbestos-containing materials. 13. Review existing conditions that may require notification of Owner before proceeding. 1.5 ACTION SUBMITTALS A. Product Data: For each type of product specified. 070150.72 - Page 2 of 13 RE

Liquidated Damages

high

…prevailing wage requirements are subject to a penalty of up to $200 per day per worker, paid in addition to any wage underpayments. Liquidated damages in the amount of the wage underpayments mayalsoapply. Reference:Labor Code 1775 Apprenticeship Requirements https://www.dir.ca.gov/Public-Works/Apprentices.html https://www.dir.ca.gov/DAS/DASApprenticesOnPublicWorksSummaryOfRequirements.htm https:/

Mandatory Pre-Bid / Pre-Proposal Meeting

high

…uploaded to PlanetBids before 2:00 PM on August 31, 2023 Online only at http://www.planetbids.com/portal/portal.cfm?CompanyID=15300# Mandatory Pre-bid meeting will be held on August 23, 2023 at 9:00 AM. The location of the meeting will be at the 5770 Freeport Blvd. Sacramento, CA. Detailed Scope of Work included in the Bid Documents. The Contractor shall provide all labor, materials, tools, and e

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

23 items
  • Complete bid/proposal form
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all