← Public RFP analyses

PRECISE GRADING AND LANDSCAPING OF THE NORTHSIDE AGRICULTURAL INNOVATION CENTER

Source scope cues include: City of Riverside; City of Riverside Building and; by law as part of the project scope.; The scope of work will take place on both sides of a City street, (Clark St.; NO HARD COPY BIDS WILL BE ACCEPTED.; similar scope and complexity as the project contemplated in Bid 8122.; 1) Permits from other agencies as may be required by law.; obtain approval and/or proper permits.; Material charges shall be substantiated by valid copies of vendors’ invoices.; and sizes of utilities which will be required for this project.; obtain materials unless the Contractor furnishes to the Engineer documentary proof.; limitation to the cost of such repairs or replacement.; such circumstance will be deemed an operational emergency.; prevailing wage rates in excess of those set forth in the Contract.; 900 CLARK ST; 3900 Main Street; 3900 Main Street, Riverside CA; Electrical Contractor; Plumbing Contractor.

BID WITH CAUTION 11 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Riverside; City of Riverside Building and; by law as part of the project scope.; The scope of work will take place on both sides of a City street, (Clark St.; NO HARD COPY BIDS WILL BE ACCEPTED.; similar scope and complexity as the project contemplated in Bid 8122.; 1) Permits from other agencies as may be required by law.; obtain approval and/or proper permits.; Material charges shall be substantiated by valid copies of vendors’ invoices.; and sizes of utilities which will be required for this project.; obtain materials unless the Contractor furnishes to the Engineer documentary proof.; limitation to the cost of such repairs or replacement.; such circumstance will be deemed an operational emergency.; prevailing wage rates in excess of those set forth in the Contract.; 900 CLARK ST; 3900 Main Street; 3900 Main Street, Riverside CA; Electrical Contractor; Plumbing Contractor.

Submission deadline

2024-10-29

Red flag teaser

11 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

11 found

Broad Indemnification

high

…is hereby relieved at all times from any indebtedness or claim other than payments under terms of the Contract. The Contractor will indemnify and hold harmless the City and its officers and employees from any loss, demand, damages, claims or actions arising from or in connection with said indebtedness. 2-3 SUBCONTRACTS 2-3.2 Self Performance. The Contractor shall perform, with its own organizatio

Liquidated Damages

high

…ring the Project back on schedule within a reasonable period of time following such request will subject Contractor to assessment of liquidated damages at the daily rate specified for late completion. The Contractor shall not shorten or delete specified cure times or omit portions of the Work in order to bring the Project back within schedule unless such measures are mutually agreed to by the Pro

Prevailing Wage / Certified Payroll

high

…patronage in the City, Contractor shall use its best efforts to purchase supplies within the City limits. 7-2.2 Laws. A schedule of prevailing wage rates as published by the California Department of Industrial Relations for the types of work to be done under these Special Provisions is on file in the office of the City Clerk, City Hall, 3900 Main Street, Riverside, which schedule is open for insp

Project Labor Agreement / Union Requirements

high

…rating similar equipment already on the project or, in the absence of such other workers, at the rates for such labor established by collective bargaining agreements for the type of workers and location of the work, whether or not the owner-operator is actually covered by such an agreement. 3-3.3 Daily Reports by Contractor. The Contractor shall maintain a Contractor’s daily report of all work ac

Retainage

high

…for approval by the Project Manager. After approval, the Project Manager will issue a progress payment for the amount approved, less 5% retention. No progress payment made to the Contractor or its sureties will constitute a waiver of the liquidated damages under 6-9 9-3.2.2 Progress Payments. Progress payment requests shall be processed in accordance with the provisions of Public Contract Code Se

Locked analysis

All deadlines table

4 dates
ItemDue
BIDS DUE 2024-10-29
Request for Bids Released 2024-10-04
Final Questions Due 2024-10-16
Responses to Questions Released 2024-10-22

Locked analysis

Required certifications checklist

19 items
  • Complete bid/proposal form
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all