Pocket Canal Erosion Repair

This project involves erosion repair and canal lining rehabilitation for Pocket Canal, located approximately one mile west of the intersection of Florin Road and Interstate 5 in Sacramento, California. The work is a renovation/repair project for the City of Sacramento (municipal owner) requiring concrete and excavation trades. The scope includes raising the existing concrete lining within specified sections of Pocket Canal by applying pneumatically applied (shotcrete) Portland cement concrete above the existing canal lining for approximately 150 linear feet, along with excavation, grading, fencing removal/replacement, and water quality control measures. This is a public works project subject to City of Sacramento Standard Specifications and environmental permit requirements. Source scope cues include: City of Sacramento; City of Sacramento Building; Proof of Compliance with Contract .; Stores of equipment and materials shall be located to facilitate inspection.; satisfactory proofs as to his compliance with such requirements.; permits and shall give notice necessary and incident to the prosecution of the Work.; Contractor will be responsible for obtaining said permits in a timely manner.; of each day's placement shall be located at control joints.; a plant located in the United States..

BID WITH CAUTION 15 red flags detected : Administrative Penalties Deducted from Contract Payment

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

This project involves erosion repair and canal lining rehabilitation for Pocket Canal, located approximately one mile west of the intersection of Florin Road and Interstate 5 in Sacramento, California. The work is a renovation/repair project for the City of Sacramento (municipal owner) requiring concrete and excavation trades. The scope includes raising the existing concrete lining within specified sections of Pocket Canal by applying pneumatically applied (shotcrete) Portland cement concrete above the existing canal lining for approximately 150 linear feet, along with excavation, grading, fencing removal/replacement, and water quality control measures. This is a public works project subject to City of Sacramento Standard Specifications and environmental permit requirements. Source scope cues include: City of Sacramento; City of Sacramento Building; Proof of Compliance with Contract .; Stores of equipment and materials shall be located to facilitate inspection.; satisfactory proofs as to his compliance with such requirements.; permits and shall give notice necessary and incident to the prosecution of the Work.; Contractor will be responsible for obtaining said permits in a timely manner.; of each day's placement shall be located at control joints.; a plant located in the United States..

Submission deadline

TBD

Red flag teaser

15 red flags detected including Administrative Penalties Deducted from Contract Payment.

Locked analysis

Full red flag list with excerpts

15 found

Administrative Penalties Deducted from Contract Payment

high

The Contractor may be assessed an administrative penalty for each violation of any provision addressed by this ordinance, unless modified herein, and amount of penalty will be deducted from the Contract.

Alternative De-watering Method at Contractor's Risk

high

The detail shows the attachment of a work platform near the top of the existing canal lining along with placement of a straw wattles as a preventative water quality control measure. This method is optional and the Contractor may use this approach at their own risk and shall hold the City harmless from and against any and all claims arising by reason of its use. Any damage to existing facilities in the area of work related to use of this alternative shall be the sole responsibility of the Contractor to repair at the Contractor's expense.

Contractor Assumes All Costs for Hazardous Materials Encountered

high

In the event hazardous or contaminated materials are encountered at the site for which separate handling or removal provisions have not been made in these Special Provisions, the Contractor shall stop work on that item, contact the Engineer and schedule his operations to work elsewhere on the site, if possible. The City will be responsible for handling and removal of hazardous material or may request that the Contractor be made available, through contract change order, to provide additional services as needed for the completion of the work.

Contractor Responsible for All Traffic Control and Public Safety

high

The Contractor shall be solely and completely responsible for furnishing, installing, and maintaining all warning signs and devices necessary to safeguard the general public and the work, and to provide for the safe and proper routing of all vehicular and pedestrian traffic during the performance of the work. The requirement shall apply continuously and shall not be limited to normal working hours.

Contractor Responsible for Damage to Existing Improvements

high

The Contractor shall be responsible for repairing damages to existing improvements, including the existing chain link fencing that is removed and re-installed, to their previous condition or better. Bidders shall take note that some portions of the existing concrete lining have significant cracking. Care shall be taken to prevent further degradation of the existing condition.

Locked analysis

All deadlines table

5 dates
ItemDue
Pre-bid Questions Due TBD
Site Visit / Pre-bid Site Examination TBD
Pre-job Conference TBD
Construction Schedule Submission TBD
Traffic Control Plan Submission TBD

Locked analysis

Required certifications checklist

9 items
  • Include contractor license information
  • Acknowledge all addenda
  • Verify requirement: Performance and Payment Bond
  • Verify requirement: Commercial General Liability Insurance
  • Verify requirement: Workers' Compensation Insurance
  • Verify requirement: Business License
  • Track deadline: Pre-bid Questions Due
  • Track deadline: Site Visit / Pre-bid Site Examination

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all