← Public RFP analyses

Pocket Canal Aeration Cabinet Installation

Source scope cues include: City of Sacramento; CITY OF SACRAMENTO Electronic Proposals; PlanetBids, up to the hour of 5:00 p.m. on February 5, 2021, for construction of: POCKET CANAL AERATION CABINET INSTALLATION (PN: W14120605) (B21141321005) as set forth in the C...; bond requirements of the Contractor. 4. The work performed or the materials or equipment provided by the listed LBE subcontractor or supplier are unsatisfactory or are not in ac...; Electronic Proposals shall be uploaded to PlanetBids, up to the hour of 5:00 p.; demolition, repair, and maintenance project of $15,000 or less.; entered into in response to a declared emergency.; warranty period without expense or charge of any nature whatsoever to City.; demand all costs and expense of such repair.; such defect, and Contractor shall pay to City on demand all costs and expense of such repair.; otherwise ceases to be insured as required herein.; “Engineer” shall mean the director of Utilities or his designated representative.; Contractor shall be responsible for all subsequent replacements.; The City will mark locations of existing City utilities.; Any damage shall be repaired by the Contractor.; utilities and for the protection of and repair of damage to them.; gutters and ultimately, the storm drain.; Utilities, 1395 35th Avenue, Sacramento, CA 95822.; Water Treatment Plant.

BID WITH CAUTION 13 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Sacramento; CITY OF SACRAMENTO Electronic Proposals; PlanetBids, up to the hour of 5:00 p.m. on February 5, 2021, for construction of: POCKET CANAL AERATION CABINET INSTALLATION (PN: W14120605) (B21141321005) as set forth in the C...; bond requirements of the Contractor. 4. The work performed or the materials or equipment provided by the listed LBE subcontractor or supplier are unsatisfactory or are not in ac...; Electronic Proposals shall be uploaded to PlanetBids, up to the hour of 5:00 p.; demolition, repair, and maintenance project of $15,000 or less.; entered into in response to a declared emergency.; warranty period without expense or charge of any nature whatsoever to City.; demand all costs and expense of such repair.; such defect, and Contractor shall pay to City on demand all costs and expense of such repair.; otherwise ceases to be insured as required herein.; “Engineer” shall mean the director of Utilities or his designated representative.; Contractor shall be responsible for all subsequent replacements.; The City will mark locations of existing City utilities.; Any damage shall be repaired by the Contractor.; utilities and for the protection of and repair of damage to them.; gutters and ultimately, the storm drain.; Utilities, 1395 35th Avenue, Sacramento, CA 95822.; Water Treatment Plant.

Submission deadline

2020-06-11

Red flag teaser

13 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

13 found

Back-Charge / Setoff Rights

high

…arge all such liabilities of Contractor, Contractor shall continue to remain liable to City until all such liabilities are satisfied in full. No failure by City to withhold any payment as specified above shall in any manner be construed to constitute a release of any such liabilities nor a waiver of the City’s right to withhold payment for such liabilities. Form approved by City Attorney 1-11-17

Broad Indemnification

high

16. INDEMNITY AND HOLD HARMLESS A. Contractor shall defend, hold harmless and indemnify the City, its officers, employees, and agents, and each and every one of them, from and against any and all actions, damages, costs, liabilities, claims, demands, losses, judgments, penalties, costs and expenses of every type and description, whether arising on or off the site of the Work, including, but not li

Hazardous Material / Abatement Coordination

high

…umescent expansion of up to 10 times original size when exposed to 300˚F heat source, rated up to 4-hours. Packing material shall be asbestos-free, inorganic woven material Acceptable products include: 3M Fire Barrier Sealant and Packing CP25WB+, PM4 or equal. C. Fire stop pillows shall be self-locking, graphite-free, intumescent material rated up to 3-hours. Pillow shall have a release feature f

Liquidated Damages

high

…of the work within a period of sixty five (65) working days commencing on the date specified in the Notice to Proceed. The amount of liquidated damages to be paid by the Contractor for failure to complete the work by the completion date (as extended, if applicable) shall be five hundred ($500.00) for each calendar day, continuing to the time at which the work is completed. Such amount is the actu

No Material Substitutions Without Owner Approval

high

…supplier fails to perform its contractual obligations. 6. It would be in the best interest of the City. Subcontractor Substitution: No substitution of an LBE subcontractor shall be made at any time without compliance with the Subletting and Subcontracting Fair Practices Act. If an LBE subcontractor is unable to perform successfully and is to be replaced, the Contractor shall make reasonable effor

Locked analysis

All deadlines table

1 dates
ItemDue
Form Updated 2020-06-11

Locked analysis

Required certifications checklist

20 items
  • Complete bid/proposal form
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all