← Public RFP analyses

Plumbing for Desert House 119

Source scope cues include: Department of General Services; Prevailing Wage Rate b. Overhead Mark-up on Apprentice Prevailing Wage Rate c. Trip Charge e. Overhead Rate on Materials – enter the pe; PlanetBids system by the date and time specified.; submitted online on PlanetBids, utilizing the Q&A Tab in the bid information window.; RFB must submit all questions in writing on PlanetBids by 11:00 a.; invoices are paid within the discount terms (all discounts are taken).; calendar days after receipt of invoice by Metropolitan.; Metropolitan may, at its option, verify the correctness of the invoice.; withholding of Contractor’s invoice payment.; insured would be invalid under Subdivision (b) of Section 2782 of the Civil Code.; same terms and conditions that apply during non-emergency/disaster conditions.; specialized permits or licenses on Metropolitan’s premises have a valid license to do so.; scope of services, and timetable for completion of services.; (b) The prevailing wage rates shall be paid for all work performed under the Contract.; less than the prevailing wage rate shall be paid to each worker by the Contractor.; comply with all required permits and licenses.; scope to those requested in this Request for Bids.; Plumbing Contractor.

BID WITH CAUTION 14 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: Department of General Services; Prevailing Wage Rate b. Overhead Mark-up on Apprentice Prevailing Wage Rate c. Trip Charge e. Overhead Rate on Materials – enter the pe; PlanetBids system by the date and time specified.; submitted online on PlanetBids, utilizing the Q&A Tab in the bid information window.; RFB must submit all questions in writing on PlanetBids by 11:00 a.; invoices are paid within the discount terms (all discounts are taken).; calendar days after receipt of invoice by Metropolitan.; Metropolitan may, at its option, verify the correctness of the invoice.; withholding of Contractor’s invoice payment.; insured would be invalid under Subdivision (b) of Section 2782 of the Civil Code.; same terms and conditions that apply during non-emergency/disaster conditions.; specialized permits or licenses on Metropolitan’s premises have a valid license to do so.; scope of services, and timetable for completion of services.; (b) The prevailing wage rates shall be paid for all work performed under the Contract.; less than the prevailing wage rate shall be paid to each worker by the Contractor.; comply with all required permits and licenses.; scope to those requested in this Request for Bids.; Plumbing Contractor.

Submission deadline

2022-06-01

Red flag teaser

14 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

14 found

Broad Indemnification

high

…age shall not extend to any indemnity coverage for the active negligence of the additional insured in any case where an agreement to indemnify the additional insured would be invalid under Subdivision (b) of Section 2782 of the Civil Code. g. Other Endorsements and Insurance Provisions 1. Automobile Liability Endorsement. 2. All rights of subrogation under the property insurance policy (if any) h

Hazardous Material / Abatement Coordination

high

…ed and included as an additional insured on Contractor’s pollution liability coverage. 5. If General Liability, Pollution and/or any Asbestos Pollution Liability coverages are written on a claims-made form: a. The “Retro Date” must be shown, and must be before the date of the contract or the beginning of contract work. b. Insurance must be maintained and evidence of insurance must be provided for

Liquidated Damages

high

…forming a public contract or transaction. If yes, attach a separate sheet with a detailed explanation. Yes No _____ c. Been assessed liquidated damages under a construction project. If yes, attach a separate sheet with a detailed explanation. Yes No _____ d. Been convicted of any criminal charge in connection with obtaining, attempting to obtain, or performing a public contract or transaction. If

Mandatory Pre-Bid / Pre-Proposal Meeting

high

…or a Bidder to complete this bid document all bidders must: 1. Carefully read the entire RFB. 2. Bidders must have attended the mandatory job walk in order to be eligible. Failure to attend renders a bid non-responsive. Metropolitan will not accept bids from Bidders who did not attend the Mandatory Job Walk.(Not Applicable) 3. Ask questions and submit all inquiries by the required date and time.

Prevailing Wage / Certified Payroll

high

…to further determine a bidder’s suitability (eligibility) to be considered for contract award. 6. BID RESPONSE A bid response to this RFB shall consist of the following: 1. Bid Pricing a. Overhead Mark-up on Journeyman Prevailing Wage Rate b. Overhead Mark-up on Apprentice Prevailing Wage Rate c. Trip Charge e. Overhead Rate on Materials – enter the percentage as a decimal value (ie. 20% = 0.20)

Locked analysis

All deadlines table

2 dates
ItemDue
RFB QUESTIONS DUE ...................................................... 2022-06-01
BID SUBMITTAL DUE .................................................... 2022-06-14

Locked analysis

Required certifications checklist

24 items
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda
  • Include references or past project experience
  • Include subcontractor list if required

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all