PHASE 2 69KV RERC TO FREEMAN TRANSMISSION RELIABILITY PROJECT

Source scope cues include: City of Riverside is seeking; City of Riverside Public Utilities; Bond requirements. Listing of bonding companies in U.S. Department of Treasury Circular 570 is not required, but the corporate surety must be authorized to issue the bonds in th...; overseeing material yard, and making necessary repairs to break-ins to the yard.; SECTION 2 - SCOPE AND CONTROL OF THE WORK .; the scope of authority designated to such agent.; NO HARD COPY BIDS WILL BE ACCEPTED.; thereof as evidenced by supplier’s invoice.; Material charges shall be substantiated by valid copies of vendor's invoices.; to have underground installations marked by all utilities.; 6-8 COMPLETION, ACCEPTANCE AND WARRANTY.; prevailing wage rates in excess of those set forth in the Contract.; Provide Additional Insured Endorsement.; Contractor shall submit an Additional Insured Endorsement to the Public Works Department.; added as additional insured under this policy.; 7 Deductibles and Self-Insured Retentions.; reduce, or eliminate such deductibles or self-insured retentions.; below, or that Contractor is self-insured for such coverage.; 3900 Main Street, Riverside CA; 3900 Main Street, Riverside, which schedule is open for; 3900 Main Street, Riverside, California, which schedule is open for.

BID WITH CAUTION 13 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Riverside is seeking; City of Riverside Public Utilities; Bond requirements. Listing of bonding companies in U.S. Department of Treasury Circular 570 is not required, but the corporate surety must be authorized to issue the bonds in th...; overseeing material yard, and making necessary repairs to break-ins to the yard.; SECTION 2 - SCOPE AND CONTROL OF THE WORK .; the scope of authority designated to such agent.; NO HARD COPY BIDS WILL BE ACCEPTED.; thereof as evidenced by supplier’s invoice.; Material charges shall be substantiated by valid copies of vendor's invoices.; to have underground installations marked by all utilities.; 6-8 COMPLETION, ACCEPTANCE AND WARRANTY.; prevailing wage rates in excess of those set forth in the Contract.; Provide Additional Insured Endorsement.; Contractor shall submit an Additional Insured Endorsement to the Public Works Department.; added as additional insured under this policy.; 7 Deductibles and Self-Insured Retentions.; reduce, or eliminate such deductibles or self-insured retentions.; below, or that Contractor is self-insured for such coverage.; 3900 Main Street, Riverside CA; 3900 Main Street, Riverside, which schedule is open for; 3900 Main Street, Riverside, California, which schedule is open for.

Submission deadline

2024-09-12

Red flag teaser

13 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

13 found

Broad Indemnification

high

…hereby relieved at all times from any indebtedness or claim other than payments under the terms of the Contract. The Contractor will indemnify and hold harmless the City and its officers and employees from any loss, demand, damages, claims or actions arising from or in connection with said indebtedness. 2-3 SUBCONTRACTS. SP-12 SPECIAL PROVISIONS BID NO. RPU-8117- PHASE 2 69 KV RERC TO FREEMANTRAN

Hazardous Material / Abatement Coordination

high

…r from underground structures. 2. Cleanup and proper Disposal of any EPA designated Hazardous materials (PCB contaminated oil, lead, asbestos etc.) 3. Landscaping, planting, tree trimming/pruning, and irrigation systems 4. Testing services to test contamination levels of EPA designated hazardous materials of electric equipment, and soil adjacent to leaking electric equipment. 2-3.4 Prompt Payment

Liquidated Damages

high

…ractor and establishes the termination of the time period for construction, and this date is used as a basis for determining whether liquidated damages are assessable. When Contractor believes construction of the Work is Substantially Complete, Contractor shall call for an inspection. The Inspector will inspect the Work to verify its completion by Contractor. If in the Inspector’s opinion, there

Mandatory Pre-Bid / Pre-Proposal Meeting

high

…t action, the following tentative schedule of events has been prepared: Event Date Time Request for Bid Documents 09/12/2024 N/A Non-Mandatory Pre-Bid Meeting N/A N/A Final Questions Due 09/19/2024 Before 2:00 p.m. PST Responses to Questions Released 09/24/2024 N/A Bids Due 09/30/2024 Before 2:00 p.m. PST Tentative Board of Public Utilities Meeting TBD TBD to Consider Awarding Contract This is a

No Material Substitutions Without Owner Approval

high

…r. If, after installation substituted equipment is found not to be equal to material specified, it shall be removed and replaced with the material originally specified or some other substitution as approved by the Engineer, all at no additional cost to City, and with no change in contract time. SP-21 SPECIAL PROVISIONS BID NO. RPU-8117- PHASE 2 69 KV RERC TO FREEMANTRANSMISSION RELIABILITY PROJEC

Locked analysis

All deadlines table

4 dates
ItemDue
Request for Bid Documents 2024-09-12
Final Questions Due 2024-09-19
Responses to Questions Released 2024-09-24
Bids Due 2024-09-30

Locked analysis

Required certifications checklist

22 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all