PEPPER PARK PHASE I IMPROVEMENTS

The Port of San Diego is seeking bids for Pepper Park Phase 1 Improvements in National City, California. The project is a commercial site development and landscaping improvement requiring a State of California Class A General Engineering Contractor license. Work includes site grading and earthwork, utility connections, concrete walkways, playground equipment, spray ground installation, landscape plantings, and contaminated soil handling. The engineer's estimate is $4.4M with a 390-calendar-day contract duration plus 180 days for plant establishment and landscape maintenance. The project is subject to a Project Labor Agreement, Coastal Development Permit compliance, and an 18% Small Business Enterprise (SBE) participation goal. Source scope cues include: 2. The District has set a goal of eighteen percentage (18%) of the total dollar value of the prime Contract to small business (SBE) concerns. A bidder can meet this goal by; planetbids.com/portal/13982/portal-home, in order to download specification, Bid Proposal; 1400 Tidelands Avenue, National City, California, until; 1400 Tidelands Avenue, National City, California; 1400 Tidelands Avenue, National City, California, all as more particularly contained in Document No..

BID WITH CAUTION 10 red flags detected : Coastal Development Permit Compliance Required

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

The Port of San Diego is seeking bids for Pepper Park Phase 1 Improvements in National City, California. The project is a commercial site development and landscaping improvement requiring a State of California Class A General Engineering Contractor license. Work includes site grading and earthwork, utility connections, concrete walkways, playground equipment, spray ground installation, landscape plantings, and contaminated soil handling. The engineer's estimate is $4.4M with a 390-calendar-day contract duration plus 180 days for plant establishment and landscape maintenance. The project is subject to a Project Labor Agreement, Coastal Development Permit compliance, and an 18% Small Business Enterprise (SBE) participation goal. Source scope cues include: 2. The District has set a goal of eighteen percentage (18%) of the total dollar value of the prime Contract to small business (SBE) concerns. A bidder can meet this goal by; planetbids.com/portal/13982/portal-home, in order to download specification, Bid Proposal; 1400 Tidelands Avenue, National City, California, until; 1400 Tidelands Avenue, National City, California; 1400 Tidelands Avenue, National City, California, all as more particularly contained in Document No..

Submission deadline

2024-04-24

Red flag teaser

10 red flags detected including Coastal Development Permit Compliance Required.

Locked analysis

Full red flag list with excerpts

10 found

Coastal Development Permit Compliance Required

high

Project is subject to compliance with the terms of the San Diego Unified Port District Coastal Development Permit included as Exhibit B in the technical specifications.

Contaminated Soil Handling and Disposal

high

Contaminated Soil Handling, Transport, & Disposal. A Notification Regarding Environmental Conditions has been included as Exhibit A in the technical specifications. This notification will serve as the District's disclosure regarding potential hazardous materials that may be encountered during grading, excavation, trenching, and/or other ground penetration.

Prevailing Wage / Davis-Bacon Compliance

high

In accordance with the provisions of the California State Labor Code, the Port has obtained the general prevailing rate of wages (which rate includes employer payments for health and welfare, vacation, pension and similar purposes) applicable to the work to be done, for straight time, overtime, Saturday, Sunday and holiday work. All labor employed on this project shall be paid no less than such minimum rates of wages.

Extended Contract Duration with Plant Establishment and Landscape Maintenance

medium

The total contract duration is 390 calendar days with a provision for an additional 180 calendar days for Plant Establishment & Landscape Maintenance.

Jobsite Visit Deemed Acceptance of Conditions

medium

Submission of a Bid Proposal Package shall be evidence that the bidder has visited the jobsite and is satisfied with the conditions to be encountered if awarded the contract.

Locked analysis

All deadlines table

4 dates
ItemDue
Pre-Bid Conference 2024-04-24
Questions Due 2024-05-02
Bid Submission Deadline 2024-05-29
Award Notification 2024-08-27

Locked analysis

Required certifications checklist

16 items
  • Verify requirement: Bid Bond / Bid Security
  • Verify requirement: Commercial General Liability Insurance
  • Verify requirement: Prevailing Wage / Certified Payroll Documentation
  • Verify requirement: ACI Craftsmen Certification
  • Verify requirement: Contractor License
  • Verify requirement: IPEMA Certification
  • Verify requirement: MWBE / DBE / SBE Participation Certification
  • Verify requirement: Performance Bond and Payment Bond

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all