← Public RFP analyses

Patterson Park Redevelopment Project

Source scope cues include: City of Riverside; City of Riverside State of; NO HARD COPY BIDS WILL BE ACCEPTED.; City all such information and data for this purpose as City may reasonably request.; of construction and also prior to completion of construction for the replacement of survey monuments.; 1) Submittal of Materials Lists, Product Data, and Samples (Spec.; After both sign this emergency change order, the change will become effective.; authorized to sign emergency change orders not to exceed $500 each.; a claim, and any extra work being performed on a time and materials basis.; are broken due to Contractor's operations shall be repaired at Contractor's expense.; 1 Payment for Relocation and/or Protection of Existing Utilities.; utilities, other than as shown on the Plans for relocation, will conflict with permanent improvements.; 6-8 COMPLETION, ACCEPTANCE, AND WARRANTY.; maintenance data per Specifications Section 01775 and 01782 prior to the City’s acceptance.; 1 Prevailing Wages/Certified Payrolls.; the applicable prevailing wage rates at the job site.; employees are added as additional insured under this policy.; 3900 Main Street; 6927 Magnolia Ave; 3900 Main Street, Riverside, California; Electrical Contractor; Plumbing Contractor.

BID WITH CAUTION 11 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Riverside; City of Riverside State of; NO HARD COPY BIDS WILL BE ACCEPTED.; City all such information and data for this purpose as City may reasonably request.; of construction and also prior to completion of construction for the replacement of survey monuments.; 1) Submittal of Materials Lists, Product Data, and Samples (Spec.; After both sign this emergency change order, the change will become effective.; authorized to sign emergency change orders not to exceed $500 each.; a claim, and any extra work being performed on a time and materials basis.; are broken due to Contractor's operations shall be repaired at Contractor's expense.; 1 Payment for Relocation and/or Protection of Existing Utilities.; utilities, other than as shown on the Plans for relocation, will conflict with permanent improvements.; 6-8 COMPLETION, ACCEPTANCE, AND WARRANTY.; maintenance data per Specifications Section 01775 and 01782 prior to the City’s acceptance.; 1 Prevailing Wages/Certified Payrolls.; the applicable prevailing wage rates at the job site.; employees are added as additional insured under this policy.; 3900 Main Street; 6927 Magnolia Ave; 3900 Main Street, Riverside, California; Electrical Contractor; Plumbing Contractor.

Submission deadline

2024-12-12

Red flag teaser

11 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

11 found

Broad Indemnification

high

…City is hereby relieved at all times from any indebtedness or claim other than payments under terms of the Contract. Contractor will indemnify and hold harmless City and its officers and employees from any loss, demand, damages, claims or actions arising from or in connection with said indebtedness. 2-3 SUBCONTRACTS. Add new subsection 2-3.1.1 to read: 2-3.1.1 Specialty Items. Per the Standard Sp

Guaranteed Maximum Price (GMP) / Hard Budget Cap

high

…HE CONTRACTOR. No Changes made 3-2 CHANGES INITIATED BY THE AGENCY. 3-2.1 General. No Changes Made 3-2.2 Self Performance. No Changes Made Add new subsection 3-2.3 to read: 3-2.3 Emergency Change Orders. If a necessary change results in a change in the Work, the Park Projects Inspector is authorized to negotiate an emergency change order, not to exceed $500, with INFORMATION FOR PURCHASING Page 1

Liquidated Damages

high

…ractor and establishes the termination of the time period for construction, and this date is used as a basis for determining whether liquidated damages are assessable. In no case shall the Plant Establishment Period end prior to the Final Acceptance of the Project. When Contractor believes construction of the Work is Substantially Complete, Contractor shall call for an inspection. The Director wi

Prevailing Wage / Certified Payroll

high

…wal of a proposal shall not prejudice the right of a Bidder to file a revised proposal. 2-1.7 Bidder Evaluation. Attention Contractors and Subcontractors: Senate Bill 854 (Stat. 2014, chapter 28) made several changes to the laws governing how the Department of Industrial Relations (DIR) monitors compliance with prevailing wage requirements on public works project. INFORMATION FOR PURCHASING Page

Project Labor Agreement / Union Requirements

high

…increases in prevailing wage rates, but only for the working days beyond the stipulated Time of Completion in Section 6-7. Note: Non-union contractors and subcontractors, when computing wage rates to be paid to the worker: All fringe benefits are to be added to the basic hourly rates for payment directly to the worker when no union/trust is applicable as recipient of such fringe benefit payments.

Locked analysis

All deadlines table

4 dates
ItemDue
Notice Inviting Bids Release 2024-12-12
Final Questions for the Bids Due 2024-12-19
Responses to Questions Released 2025-01-08
Bids Due 2025-01-15

Locked analysis

Required certifications checklist

22 items
  • Complete bid/proposal form
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all